Eagle South, LLC filed Georgia DCA DRI #4171 on March 27, 2024 for Project Eisenhower, a 6 building, 2,155,800 square foot data center campus along Gordon Highway in Augusta, Richmond County. [1] On the regulatory record, state permit status is Georgia DCA DRI #4171 regional review filing. [1]
U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.
Utility interconnection queue filings monitored.
Equivalent to ~60 U.S. households (U.S. EPA 300 gal/day household baseline).
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: Gordon Hwy, Augusta, GA 30909.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Sources:
The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Project Eisenhower Data Center Campus (Augusta, DRI #4171).
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | |||
| Data Hall Buildings | 6 buildings | Georgia DCA DRI Initial Form [2] apps.dca.ga.gov | |
| Cooling & Water System | 18,000 gal/day | the developer's figure | |
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Acts of Richmond County and Augusta about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Augusta | Augusta Commission planned to vote on data center ordinance on September 15, 2026 | wfxg.com (opens in a new tab) | |
| Augusta | Augusta released final draft of data center ordinance with redline version showing all revisions | wfxg.com (opens in a new tab) | |
| Augusta | Augusta leaders hosted meeting on data center ordinance | wrdw.com (opens in a new tab) |
Chronological regulatory, corporate and permitting events on the record, newest first.
· Status: permitting (content date)
Eagle South, LLC filed Georgia DCA DRI #4171 on March 27, 2024 for Project Eisenhower, a 6 building, 2,155,800 square foot data center campus along Gordon Highway in Augusta, Richmond County.
Verified data center records in Georgia within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Nixon Technology Center (Augusta, DRI #4853) Richmond County | 9 mi | Proposed | 3 G Investments, LLC | 600 MW |
| QTS Augusta Data Center Campus Augusta, Richmond County | 10 mi | Being built | QTS Data Centers | 8 buildings |
| Project Squash Data Center Campus (Columbia County, DRI #4735) Columbia County | 12 mi | Proposed | The Whiting-Turner Contracting Company | 200 MW |
| Google Columbia County Data Center (White Oak Technology Park) Appling, Columbia County | 12 mi | Being built | 12 buildings | |
| Project JGK Data Center Campus (Columbia County, DRI #4736) Columbia County | 15 mi | Proposed | Turner Construction Company | 1.4 GW |
| Project Azelea Data Center Campus (McDuffie County, DRI #4602) McDuffie County | 16 mi | Proposed | Project Azelea Applicant | 400 MW |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Eagle South, LLC is the developer, apps.dca.ga.gov (opens in a new tab). No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: 18,000 gallons a day (withdrawal) (the developer's figure, apps.dca.ga.gov (opens in a new tab)).
Augusta: Augusta Commission planned to vote on data center ordinance on September 15, 2026 (reported September 9, 2026, wfxg.com (opens in a new tab)); and Augusta: Augusta released final draft of data center ordinance with redline version showing all revisions (reported September 9, 2026, wfxg.com (opens in a new tab)). 3 events are on the county's rows; a rule about the area is not a decision about this record.
2 sources on file.
This site is in the SERC South (SRSO) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Project Eisenhower Data Center Campus (Augusta, DRI #4171). Last verified March 27, 2024. https://datacenterrecord.org/projects/project-eisenhower-augusta-richmond-ga. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about Project Eisenhower Data Center Campus (Augusta, DRI #4171)
Data Center Record, "Project Eisenhower Data Center Campus (Augusta, DRI #4171)", https://datacenterrecord.org/projects/project-eisenhower-augusta-richmond-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.