● Proposed Campus Announced March 27, 2024 · 6 Buildings · Eagle South, LLC

Project Eisenhower Data Center Campus (Augusta, DRI #4171)

Street address Gordon Hwy, Augusta, GA 30909, Richmond County assessor parcel Exact, on the parcel [2] apps.dca.ga.gov

Overview, regulatory gates and specifications

Eagle South, LLC filed Georgia DCA DRI #4171 on March 27, 2024 for Project Eisenhower, a 6 building, 2,155,800 square foot data center campus along Gordon Highway in Augusta, Richmond County. [1] On the regulatory record, state permit status is Georgia DCA DRI #4171 regional review filing. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
In local review
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
Georgia DCA DRI #4171 region
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water [1]
18,000 gal/day
the developer's figure

Equivalent to ~60 U.S. households (U.S. EPA 300 gal/day household baseline).

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
6 buildings
Georgia DCA DRI Initial Form

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: Gordon Hwy, Augusta, GA 30909.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
18,000 gallons a day (withdrawal) developer figure Equivalent to the daily water use of about 60 average U.S. households based on the U.S. Environmental Protection Agency baseline of 300 gallons per day per home. What at most 60 American families use at home, at the EPA's more than 300 gallons a family a day (the EPA gives no year for it).
apps.dca.ga.gov (opens in a new tab)
Land area
Not disclosed
Buildings
6 buildings permitted
[2] apps.dca.ga.gov
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Eagle South, LLC as stated by the source
[1] apps.dca.ga.gov
Permitted legal entity
Eagle South, LLC the developer's figure
[2] apps.dca.ga.gov
State air permit registration
Georgia DCA DRI #4171 state air permit register
State permit status
Georgia DCA DRI #4171 regional review filing the state's permit register, as of March 27, 2024, last verified November 11, 2026
[1] apps.dca.ga.gov
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Project Eisenhower Data Center Campus (Augusta, DRI #4171), water: 18,000 gallons a day.
  2. Water used at home each day by the average American family, more than: 300 gallons a day.
  3. 18,000 ÷ 300 = 60 (gallons a day over gallons a day).

Sources:

The two count different water: the data center figure is water withdrawn from its source, and the EPA's is water used at home, which the EPA does not split into water consumed and water returned.

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Eagle South, LLC
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Project Eisenhower Data Center Campus (Augusta, DRI #4171).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 6 buildings Georgia DCA DRI Initial Form [2] apps.dca.ga.gov
Cooling & Water System 18,000 gal/day the developer's figure
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Richmond County and Augusta about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Augusta Augusta Commission planned to vote on data center ordinance on September 15, 2026 wfxg.com (opens in a new tab)
Augusta Augusta released final draft of data center ordinance with redline version showing all revisions wfxg.com (opens in a new tab)
Augusta Augusta leaders hosted meeting on data center ordinance wrdw.com (opens in a new tab)

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: permitting (content date)

    Eagle South, LLC filed Georgia DCA DRI #4171 on March 27, 2024 for Project Eisenhower, a 6 building, 2,155,800 square foot data center campus along Gordon Highway in Augusta, Richmond County.

    [1] apps.dca.ga.gov

Every event in order

Nearest data centers in Georgia

Verified data center records in Georgia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Nixon Technology Center (Augusta, DRI #4853) Richmond County 9 mi Proposed 3 G Investments, LLC 600 MW
QTS Augusta Data Center Campus Augusta, Richmond County 10 mi Being built QTS Data Centers 8 buildings
Project Squash Data Center Campus (Columbia County, DRI #4735) Columbia County 12 mi Proposed The Whiting-Turner Contracting Company 200 MW
Google Columbia County Data Center (White Oak Technology Park) Appling, Columbia County 12 mi Being built Google 12 buildings
Project JGK Data Center Campus (Columbia County, DRI #4736) Columbia County 15 mi Proposed Turner Construction Company 1.4 GW
Project Azelea Data Center Campus (McDuffie County, DRI #4602) McDuffie County 16 mi Proposed Project Azelea Applicant 400 MW

Blank cell: not disclosed by any source on file.

Common questions about Project Eisenhower Data Center Campus (Augusta, DRI #4171)

Answered directly from the verified filings and local actions on this page.

Who is building Project Eisenhower Data Center Campus (Augusta, DRI #4171)?

Eagle South, LLC is the developer, apps.dca.ga.gov (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Project Eisenhower Data Center Campus (Augusta, DRI #4171) say it needs?

Power: not disclosed by any source on file. Water: 18,000 gallons a day (withdrawal) (the developer's figure, apps.dca.ga.gov (opens in a new tab)).

Where does Project Eisenhower Data Center Campus (Augusta, DRI #4171) stand today?
What has Augusta or Richmond County decided about it?

Augusta: Augusta Commission planned to vote on data center ordinance on September 15, 2026 (reported September 9, 2026, wfxg.com (opens in a new tab)); and Augusta: Augusta released final draft of data center ordinance with redline version showing all revisions (reported September 9, 2026, wfxg.com (opens in a new tab)). 3 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Georgia DCA DRI #4171 Application Summary (Project Eisenhower Data Center Campus (Augusta, DRI #4171)) (opens in a new tab), Georgia Department of Community Affairs, March 27, 2024
  2. Georgia DCA DRI #4171 Initial Form (Project Eisenhower Data Center Campus (Augusta, DRI #4171)) (opens in a new tab), Georgia Department of Community Affairs, March 27, 2024

2 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Project Eisenhower Data Center Campus (Augusta, DRI #4171)", https://datacenterrecord.org/projects/project-eisenhower-augusta-richmond-ga, last verified March 27, 2024. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Project Eisenhower Data Center Campus (Augusta, DRI #4171)", https://datacenterrecord.org/projects/project-eisenhower-augusta-richmond-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
33.441854, -82.124481
How the location is known
Location from the county parcel record.
Location source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4171
Coordinate source
https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4171
Location last verified
November 11, 2026
How water was disclosed
the developer's figure
Published
November 11, 2026
Last verified
March 27, 2024
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Project Eisenhower Data Center Campus (Augusta, DRI #4171) · 2 sources, 1 entry, 3 decisions nearby · basis and source tier on every row · verified March 27, 2024

Download CSV JSON