Augusta has 2 data centers on the record: 1 being built and 1 proposed. Augusta has a scorecard row with no rating yet. The latest decision on the record: Augusta released final draft of data center ordinance with redline version showing all revisions, reported September 9, 2026. Richmond County's own decisions are on the Richmond County page.
The 2 data centers in Augusta
Every Augusta record 2 records · blank cell: not disclosed · sort by any column
| Facility and county | Stage | Operator | Power (MW) | Latest entry | Basis | Located | Tier | Verified |
|---|---|---|---|---|---|---|---|---|
| QTS Augusta Data Center Campus Augusta, Richmond County | Being built | QTS Data Centers | site | 2 | 2026-09-14 | |||
| Project Eisenhower Data Center Campus (Augusta, DRI #4171) Augusta, Richmond County | Proposed Waiting on permits Georgia DCA DRI #4171 regional review filing | Eagle South, LLC | Eagle South, LLC filed Georgia DCA DRI #4171 on March 27, 2024 for Project Eisenhower, a 6 building, 2,155,800 square foot data center campus along Gordon Highway in Augusta, Richmond County. apps.dca.ga.gov (opens in a new tab) primary source March 27, 2024 | site | 1 | 2024-03-27 |
Blank cell: not disclosed by any source on file. Power is the developer's figure or a permit's, each linked on the record.
What Augusta has decided 1 body, 2 decisions on the record
What the city has done about data centers: each body on its own row with its rating, open, case by case, restrictive or closed, never good or bad, and every vote, ordinance, moratorium or agreement one tap away, newest first, with its source.
| Body | Level | Rating | In force until | Latest act | Acts | Verified |
|---|---|---|---|---|---|---|
| Augusta | city | not rated | Augusta released final draft of data center ordinance with redline version showing all revisions. wfxg.com (opens in a new tab) local outlet Reported Sep 92 acts on this rowEvery act on the Augusta row
| 2 | 2026-09-09 |
Reported: the source's date; the item names no day of its own. A rating rests only on a binding act in force; "not rated" means no person has set one. Blank cell: no end date or count on the record for that column.
The rules across Georgia · Report missing data or a local act
What happened
-
OrdinanceAugusta
Augusta released final draft of data center ordinance with redline version showing all revisions
wfxg.com (opens in a new tab) local outlet -
HearingAugusta
wrdw.com (opens in a new tab) local outlet -
Now waiting on permitsProject Eisenhower Data Center Campus (Augusta, DRI #4171)
apps.dca.ga.gov (opens in a new tab) primary source
The county and nearby counties
Distances run between the centers the Census Bureau gives each place. Every Georgia county.
Disclosed figures
water from 1 record
Power, water, jobs and tax
| Figure | Disclosed total | Disclosed | Without a figure | Basis |
|---|---|---|---|---|
| Power | 0 | 2 | ||
| Water, stated per day | 18,000 gallons a day | 1 | 1 | 1 the developer's figure |
| Permanent jobs | 0 | 2 | ||
| Tax each year | 0 | 2 |
A blank total means no record disclosed the figure; the count without one says how many.
Summed only where a record disclosed the figure; a record with no figure adds nothing and is counted as not disclosed. Water is summed per day and per year separately, as the sources stated it, and never converted. A tax claim given as a range is summed at both ends.
By what the facilities are for
| Use | Records | Power | Water | Jobs | Tax each year |
|---|---|---|---|---|---|
| No stated use | 2 | 18,000 gallons a day |
A blank cell means no record with that use disclosed the figure.
A record that lists several uses counts once under each. Each cell is the sum over the records with that use, disclosed rows only.
What the facilities are for
No source on file states what any of the 2 tracked facilities in Augusta are for.
How the facilities are cooled
No source on file states how any of the 2 tracked facilities in Augusta are cooled.
About this data
Report a correction · Send a tip about Augusta · The rows here are part of the Georgia export.
Cite this page
Data Center Record, "Data center records in Augusta, Richmond County, Georgia", https://datacenterrecord.org/states/ga/richmond-county/augusta. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.
For researchers
- Level
- city
- Census GEOID
- 1304204
- Census geography
- Incorporated place, Augusta-Richmond County consolidated government (balance)
- Rating
- Not rated