Partnered with Montgomery Public School System on robotics program
Context & source notes
Provenance: Paraphrased; content date; reported from elsewhere.
Primary source: Meta Store (opens in a new tab).
Montgomery, Montgomery County, ALDeveloper: MetaCensus GEOID 01101
Meta published content about investing in Montgomery, Alabama. It is being built, since September 23, 2025.
How much power it needs, how much water it would use and who would use it have not been disclosed.
Tap a pin for the data center, the parcel for its record
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
Each figure as its source gave it. The number in brackets is its place in the source list.
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | ||||
| How much water it would use | ||||
| How loud it would be | ||||
| Jobs once it runs | ||||
| Tax it would pay each year |
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | Meta | as stated by the source | September 8, 2026 | |
| Who is constructing it | ||||
| How much land | ||||
| Buildings | ||||
| Where its power comes from | ||||
| Grid connection | ||||
| How it is cooled |
How much power it needs, also reported: 227 MW, 2025 (alreporter.com (opens in a new tab): Meta invested in a 227 megawatt solar farm in Muscle Shoals, which produces energy for its Huntsville plant, Meta Data Centers (opens in a new tab): New clean and renewable energy projects supported by Meta are adding 227 megawatts in Alabama) .
A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
The record adds each the day a source gives it. Why these documents.
(source date; the content gives no date of its own)
Meta data center in Toney area expanding to 2.5 million square feet
(content date)
Meta announced in 2025 that its investment in the Montgomery campus increased to more than $1.5 billion
(content date)
Silicon Ranch will begin building sometime in 2027 with the solar farm's lifespan expected to be at least 25 years
[7] fox10tv.com, also [24], also [23], also [18]
(content date)
Construction planned to begin by end of 2026, taking 12-18 months
(content date)
Silicon Ranch planning solar farm on 4,500 acres in Baldwin County to power Meta data center
(content date)
Meta first announced an $800 million investment to begin construction of the data center in April 2024
[14] alreporter.com, also [3], also [20], also [21], also [8], also [28], also [16], also [19], also [4], also [17], also [22]
(content date)
Meta announced plans to invest in two new buildings at its Montgomery Data Center
[14] alreporter.com, also [3], also [20], also [21], also [8], also [28], also [16], also [19], also [4], also [17], also [22]
(content date)
Meta has donated to STEM programs at Montgomery Public Schools and launched district wide robotics program
(content date)
Meta project began in May 2024
· being built (content date)
Montgomery Data Center campus is expanding with two new buildings
(content date)
Mass timber provider Binderholz is partnering on the project alongside Hensel Phelps.
(content date)
The administrative facility utilizes mass timber construction as a renewable, lower carbon alternative to traditional steel and concrete.
(content date)
Hensel Phelps is providing general contractor services for a new administrative facility at Meta's Montgomery, Alabama data center campus.
· approved (content date)
Meta will construct additional mass timber buildings at Cheyenne, Wyoming and Montgomery, Alabama data center campuses.
[10] esgdive.com, also [5]
· being built (source date; the content gives no date of its own)
Meta plans 800 million dollar data center in Montgomery
(content date)
The facility will feature mass timber in the construction of its administration building
[27] youtube.com, also [25]
(content date)
The facility will be powered by 100 percent renewable energy
[27] youtube.com, also [25]
(content date)
The facility will be Meta's 24th global data center
[27] youtube.com, also [25]
· approved (content date)
The facility will be Meta's 20th data center in the United States and its second in Alabama after Huntsville, as reported by AI Business
[27] youtube.com, also [25]
The full Montgomery Meta Investment timeline, in order
· the draft of a status history row
Held unplaced under the record's rules (October 13, 2026): the entry's words are about South Carolina, and this record is in Alabama. Kept off the record, never deleted; it can be restored. The old and new text.
· the citation of a statements row
Cites the later report of the same claim by the same speaker (said again on September 1, 2026; the record's rules, October 10, 2026). The old and new text.
· the citation of a statements row
Cites the later report of the same claim by the same speaker (said again on September 24, 2025; the record's rules, October 10, 2026). The old and new text.
· the citation of a statements row
Cites the later report of the same claim by the same speaker (said again on September 12, 2025; the record's rules, October 10, 2026). The old and new text.
· the summary of a status history row
The entry named the review card it came from in brackets; the card number is the review console's, not the record's, and is removed (the trust fixes of October 8, 2026). The old and new text.
· the summary of a record items row
the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word The old and new text.
Every correction on the record is on the corrections page.
Gov. Kay Ivey signed President Donald Trump's Ratepayer Protection Pledge to keep electricity costs tied to data centers from being passed on to households
Silicon Ranch spokesperson says cadmium telluride panels can be stowed during storms
Every statement about data centers in Alabama, by speaker
Partnered with Montgomery Public School System on robotics program
Provenance: Paraphrased; content date; reported from elsewhere.
Primary source: Meta Store (opens in a new tab).
Meta provided community grants and sponsorships supporting multiple projects
Provenance: Paraphrased; content date; reported from elsewhere.
Primary source: Meta Store (opens in a new tab).
Meta pays full costs of energy, water, and wastewater the data center uses
Provenance: Paraphrased; content date; reported from elsewhere.
Primary source: Meta Store (opens in a new tab).
Joshua Craig from Hazel Green expressed concern about data center expansion reducing farmland
Provenance: Paraphrased; said in the source itself.
Primary source: rocketcitynow.com (opens in a new tab).
The fund directs money toward teachers, first responders, energy and water infrastructure and community needs in areas where Meta owns and operates data centers
Provenance: Paraphrased; content date; reported from elsewhere.
Primary source: Yellowhammer News (opens in a new tab).
Meta launched a $1 billion fund to support data center communities including Montgomery
Provenance: Paraphrased; content date; reported from elsewhere.
Primary source: Yellowhammer News (opens in a new tab).
Sen. Tommy Tuberville says data centers could bring significant economic benefits, particularly to rural communities
Provenance: Paraphrased; said in the source itself.
Primary source: Montgomery Advertiser (opens in a new tab).
Democratic gubernatorial candidate Doug Jones called for a temporary pause on additional data center development
Provenance: Paraphrased; said in the source itself.
Primary source: Montgomery Advertiser (opens in a new tab).
Sen. Katie Britt said data centers are 'critical' to maintaining America's technological leadership
Provenance: Paraphrased; said in the source itself.
Primary source: Montgomery Advertiser (opens in a new tab).
Once operational, the Montgomery Data Center will be optimized for AI workloads
Provenance: Paraphrased; content date; reported from elsewhere.
Primary source: alreporter.com (opens in a new tab).
Also reported by: Made in Alabama (opens in a new tab) query feed , thebamabuzz.com (opens in a new tab) query feed , Montgomery Advertiser (opens in a new tab) query feed , WAKA 8 (opens in a new tab) query feed , YouTube (opens in a new tab) query feed , WSFA (opens in a new tab) query feed , al.com (opens in a new tab) query feed , Data Center Dynamics (opens in a new tab) query feed , Business Alabama Magazine (opens in a new tab) query feed , The Business Journals (opens in a new tab) query feed .
Montgomery Data Center energy use will be matched with 100 percent clean and renewable energy
Provenance: Paraphrased; content date; reported from elsewhere.
Primary source: Meta Data Centers (opens in a new tab).
Also reported by: alreporter.com (opens in a new tab) local outlet , Meta Store (opens in a new tab) primary source .
Said again: September 24, 2025 ( alreporter.com (opens in a new tab) local outlet ), September 1, 2026 ( Meta Store (opens in a new tab) primary source ).
Montgomery Mayor Steven Reed said investment means good jobs and stronger schools
Provenance: Paraphrased; content date; reported from elsewhere.
Primary source: WSFA (opens in a new tab).
Meta's broader goal is to reach net zero emissions across its supply chain by 2030.
Provenance: Paraphrased; content date; reported from elsewhere.
Primary source: esgdive.com (opens in a new tab).
Also reported by: Data Center Dynamics (opens in a new tab) query feed , Associated Construction Publications (opens in a new tab) news outlet .
Said again: September 12, 2025 ( Associated Construction Publications (opens in a new tab) news outlet ).
Meta data center will be the 20th of its kind in the United States
Provenance: Paraphrased; content date; reported from elsewhere.
Primary source: YouTube (opens in a new tab).
Meta requires shovel ready sites with infrastructure and deep talent pools for data centers
Provenance: Paraphrased; content date; reported from elsewhere.
Primary source: YouTube (opens in a new tab).
Meta seeks 100 percent renewable energy access for site selection
Provenance: Paraphrased; content date; reported from elsewhere.
Primary source: YouTube (opens in a new tab).
Meta data center project requires a tremendous amount of power
Provenance: Paraphrased; content date; reported from elsewhere.
Primary source: YouTube (opens in a new tab).
Where in Montgomery County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.
Not disclosed. No source on file gives its capacity, its acreage or a count of buildings. What the record holds instead is under Disclosed.
Meta is the developer. No construction contractor is named on the record yet.
Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is being built, since September 23, 2025. The newest entry, reported August 23, 2026: Meta data center in Toney area expanding to 2.5 million square feet [6].
No decision by Montgomery or Montgomery County about data centers is on the record. The Montgomery County page and the Alabama scorecard list every rated row the day a person publishes one.
Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, buildings, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.
28 sources on file.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Montgomery Meta Investment
Data Center Record, "Montgomery Meta Investment", https://datacenterrecord.org/projects/montgomery-meta-investment-al. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.