Data Center Record.

Being built Built from one source

Montgomery Meta Investment

Montgomery, Montgomery County, ALDeveloper: MetaCensus GEOID 01101

Stage
Being built
Undisclosed in public filings
Power, Land, Buildings, Water

Meta published content about investing in Montgomery, Alabama. It is being built, since September 23, 2025.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 28 sources, 3 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Being built, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 11 other published records in Alabama
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Who leads it
Meta as stated by the source
Undisclosed in public filings
Land, Buildings, Power it would draw, Water, Who would use it, Jobs once it runs, Tax each year Reported by others: 227 MW (alreporter.com (opens in a new tab), Meta Data Centers (opens in a new tab)). Their figure, not the record's.
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Meta as stated by the source September 8, 2026
Who is constructing it
How much land
Buildings
Where its power comes from
Grid connection
How it is cooled

How much power it needs, also reported: 227 MW, 2025 (alreporter.com (opens in a new tab): Meta invested in a 227 megawatt solar farm in Muscle Shoals, which produces energy for its Huntsville plant, Meta Data Centers (opens in a new tab): New clean and renewable energy projects supported by Meta are adding 227 megawatts in Alabama) .

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What happened

  1. (source date; the content gives no date of its own)

    Meta data center in Toney area expanding to 2.5 million square feet

    [6] yahoo.com

  2. (content date)

    Meta announced in 2025 that its investment in the Montgomery campus increased to more than $1.5 billion

    [15] yellowhammernews.com

  3. (content date)

    Silicon Ranch will begin building sometime in 2027 with the solar farm's lifespan expected to be at least 25 years

    [7] fox10tv.com, also [24], also [23], also [18]

  4. (content date)

    Construction planned to begin by end of 2026, taking 12-18 months

    [9] mynbc15.com

15 earlier entries
  1. (content date)

    Silicon Ranch planning solar farm on 4,500 acres in Baldwin County to power Meta data center

    [9] mynbc15.com

  2. (content date)

    Meta first announced an $800 million investment to begin construction of the data center in April 2024

    [14] alreporter.com, also [3], also [20], also [21], also [8], also [28], also [16], also [19], also [4], also [17], also [22]

  3. (content date)

    Meta announced plans to invest in two new buildings at its Montgomery Data Center

    [14] alreporter.com, also [3], also [20], also [21], also [8], also [28], also [16], also [19], also [4], also [17], also [22]

  4. (content date)

    Meta has donated to STEM programs at Montgomery Public Schools and launched district wide robotics program

    [13] wsfa.com

  5. (content date)

    Meta project began in May 2024

    [13] wsfa.com

  6. · being built (content date)

    Montgomery Data Center campus is expanding with two new buildings

    [12] datacenters.atmeta.com

  7. (content date)

    Mass timber provider Binderholz is partnering on the project alongside Hensel Phelps.

    [11] acppubs.com

  8. (content date)

    The administrative facility utilizes mass timber construction as a renewable, lower carbon alternative to traditional steel and concrete.

    [11] acppubs.com

  9. (content date)

    Hensel Phelps is providing general contractor services for a new administrative facility at Meta's Montgomery, Alabama data center campus.

    [11] acppubs.com

  10. · approved (content date)

    Meta will construct additional mass timber buildings at Cheyenne, Wyoming and Montgomery, Alabama data center campuses.

    [10] esgdive.com, also [5]

  11. · being built (source date; the content gives no date of its own)

    Meta plans 800 million dollar data center in Montgomery

    [26] wsfa.com

  12. (content date)

    The facility will feature mass timber in the construction of its administration building

    · Meta · April 1, 2024 · Privacy enhanced player · loads on click

    [27] youtube.com, also [25]

  13. (content date)

    The facility will be powered by 100 percent renewable energy

    · Meta · April 1, 2024 · Privacy enhanced player · loads on click

    [27] youtube.com, also [25]

  14. (content date)

    The facility will be Meta's 24th global data center

    · Meta · April 1, 2024 · Privacy enhanced player · loads on click

    [27] youtube.com, also [25]

  15. · approved (content date)

    The facility will be Meta's 20th data center in the United States and its second in Alabama after Huntsville, as reported by AI Business

    · Meta · April 1, 2024 · Privacy enhanced player · loads on click

    [27] youtube.com, also [25]

The full Montgomery Meta Investment timeline, in order

71 corrections to this record

Every correction, with its reason
  1. · the draft of a status history row

    Held unplaced under the record's rules (October 13, 2026): the entry's words are about South Carolina, and this record is in Alabama. Kept off the record, never deleted; it can be restored. The old and new text.

  2. · the citation of a statements row

    Cites the later report of the same claim by the same speaker (said again on September 1, 2026; the record's rules, October 10, 2026). The old and new text.

  3. · the citation of a statements row

    Cites the later report of the same claim by the same speaker (said again on September 24, 2025; the record's rules, October 10, 2026). The old and new text.

  4. · the citation of a statements row

    Cites the later report of the same claim by the same speaker (said again on September 12, 2025; the record's rules, October 10, 2026). The old and new text.

  5. · the summary of a status history row

    The entry named the review card it came from in brackets; the card number is the review console's, not the record's, and is removed (the trust fixes of October 8, 2026). The old and new text.

  6. · the summary of a record items row

    the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word The old and new text.

See all 71 corrections on the Corrections page.

Every correction on the record is on the corrections page.

What was said

Gov. Kay Ivey signed President Donald Trump's Ratepayer Protection Pledge to keep electricity costs tied to data centers from being passed on to households
Kay Ivey, Alabama Governor · July 24, 2026 · paraphrased · Montgomery Advertiser (opens in a new tab) local outlet
Silicon Ranch spokesperson says cadmium telluride panels can be stowed during storms
Rob Hamilton, Silicon Ranch spokesperson · February 4, 2026 · paraphrased · mynbc15.com (opens in a new tab) news outlet

Every statement about data centers in Alabama, by speaker

17 more on this page, one per speaker and claim; 19 statements in all

Once operational, the Montgomery Data Center will be optimized for AI workloads

Meta alreporter.com (opens in a new tab) local outlet project record
Context & source notes

Montgomery Data Center energy use will be matched with 100 percent clean and renewable energy

Meta Meta Data Centers (opens in a new tab) primary source project record
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: Meta Data Centers (opens in a new tab).

Also reported by: alreporter.com (opens in a new tab) local outlet , Meta Store (opens in a new tab) primary source .

Said again: September 24, 2025 ( alreporter.com (opens in a new tab) local outlet ), September 1, 2026 ( Meta Store (opens in a new tab) primary source ).

Meta's broader goal is to reach net zero emissions across its supply chain by 2030.

Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: esgdive.com (opens in a new tab).

Also reported by: Data Center Dynamics (opens in a new tab) query feed , Associated Construction Publications (opens in a new tab) news outlet .

Said again: September 12, 2025 ( Associated Construction Publications (opens in a new tab) news outlet ).

Meta data center will be the 20th of its kind in the United States

Kay Ivey, Governor of Alabama YouTube (opens in a new tab) video project record
· Kay Ivey · YouTube · April 1, 2024 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: YouTube (opens in a new tab).

Meta requires shovel ready sites with infrastructure and deep talent pools for data centers

Brad Davis, Dir., Community and Economic Development, Meta YouTube (opens in a new tab) video project record
· Brad Davis · YouTube · April 1, 2024 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: YouTube (opens in a new tab).

Meta seeks 100 percent renewable energy access for site selection

Brad Davis, Dir., Community and Economic Development, Meta YouTube (opens in a new tab) video project record
· Brad Davis · YouTube · April 1, 2024 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: YouTube (opens in a new tab).

Meta data center project requires a tremendous amount of power

Ellen McNair, Secretary, Alabama Department of Commerce YouTube (opens in a new tab) video project record
· Ellen McNair · YouTube · April 1, 2024 · Privacy enhanced player · loads on click
Context & source notes

Provenance: Paraphrased; content date; reported from elsewhere.

Primary source: YouTube (opens in a new tab).

The site

Where in Montgomery County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.

The site map is at the top of the page.

Where
Montgomery, Montgomery County, Alabama
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, the record's own or the document's first, each with who gave it, its date and its basis.

Capacity at full buildout

1 figure, 2 sources
Show each source's words
  • 227 MW, alreporter.com: Meta invested in a 227 megawatt solar farm in Muscle Shoals, which produces energy for its Huntsville plant
  • 227 MW, Meta Data Centers: New clean and renewable energy projects supported by Meta are adding 227 megawatts in Alabama

Questions about this project

7 questions answered from the record

Answered from the rows on this page.

How big is Montgomery Meta Investment?

Not disclosed. No source on file gives its capacity, its acreage or a count of buildings. What the record holds instead is under Disclosed.

Who is building Montgomery Meta Investment?

Meta is the developer. No construction contractor is named on the record yet.

Who will use Montgomery Meta Investment?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Montgomery Meta Investment say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Montgomery Meta Investment stand today?

It is being built, since September 23, 2025. The newest entry, reported August 23, 2026: Meta data center in Toney area expanding to 2.5 million square feet [6].

What has Montgomery or Montgomery County decided about it?

No decision by Montgomery or Montgomery County about data centers is on the record. The Montgomery County page and the Alabama scorecard list every rated row the day a person publishes one.

What is still unknown about Montgomery Meta Investment?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, buildings, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Meta: Our U.S. data center fleet (opens in a new tab), Meta, September 14, 2026
  2. Investing in Montgomery, Alabama - Meta Store (opens in a new tab), Meta Store, September 1, 2026
  3. Meta to expand Montgomery data hub, pushing total investment to $1.5 billion (opens in a new tab), Made in Alabama, September 23, 2025

Reporting

  1. Meta to add two more buildings to Alabama campus in Montgomery (opens in a new tab), Data Center Dynamics, September 23, 2025, trade press
  2. Meta pilots use of mass timber in data center construction (opens in a new tab), Data Center Dynamics, August 1, 2025, trade press
  3. North Alabama resident expresses concerns on rural community impacts from data centers - rocketcitynow.com (opens in a new tab), rocketcitynow.com, August 23, 2026, national outlet
  4. Solar farm approved for north Baldwin County to power Meta data center (opens in a new tab), fox10tv.com, February 5, 2026, local outlet
  5. Meta to expand data center in Montgomery, increasing total investment to $1.5 billion (opens in a new tab), WAKA 8, September 23, 2025, local outlet
  6. Baldwin County residents fight proposed solar farm that will power Meta data center (opens in a new tab), mynbc15.com, February 4, 2026, news outlet
  7. Meta turning to mass timber to build more sustainable data centers (opens in a new tab), esgdive.com, August 5, 2025, news outlet
  8. Hensel Phelps Builds With Mass Timber at Meta Data Center - Dixie Contractor (opens in a new tab), Associated Construction Publications, September 12, 2025, news outlet
  9. Montgomery, we’re growing! (opens in a new tab), Meta Data Centers, September 23, 2025, news outlet
  10. Meta to significantly expand Montgomery data center (opens in a new tab), WSFA, September 23, 2025, local outlet
  11. Meta to expand Montgomery data center, upping local investments to $1.5 billion (opens in a new tab), alreporter.com, September 24, 2025, local outlet
  12. Meta launches $1B fund to support data center communities including Montgomery (opens in a new tab), Yellowhammer News, August 11, 2026, local outlet
13 more sources
  1. Meta data center in Montgomery gets expansion (opens in a new tab), WSFA, September 26, 2025, local outlet
  2. Meta increasing investment in Montgomery data center to $1.5 billion (opens in a new tab), Business Alabama Magazine, September 23, 2025, local outlet
  3. New solar plant coming to east Alabama in support of $1.5 billion data center (opens in a new tab), al.com, August 4, 2026, local outlet
  4. Meta putting another $700 million into Montgomery data center, pushing total to $1.5 billion (opens in a new tab), al.com, September 23, 2025, local outlet
  5. Meta investing $1.5B to expand data hub in Montgomery (opens in a new tab), thebamabuzz.com, September 23, 2025, news outlet
  6. Tech supergiant to invest $1.5B into expanded Alabama data center site (opens in a new tab), Montgomery Advertiser, September 24, 2025, local outlet
  7. Meta to invest $700M more in Alabama - here's where (opens in a new tab), The Business Journals, September 24, 2025, local outlet
  8. Building Alabama: The data centers Trump and Tuberville are calling for run on Alabama-built solar (opens in a new tab), Yellowhammer News, July 28, 2026, local outlet
  9. Meta-linked solar fields planned on Stockton tract (opens in a new tab), lagniappemobile.com, February 2, 2026, news outlet
  10. Meta Building New $800M AI Data Center in Alabama, Second in State (opens in a new tab), AI Business, May 8, 2024, news outlet
  11. Facebook parent company Meta plans $800M data center in Montgomery - WSFA (opens in a new tab), WSFA, May 2, 2024, local outlet
  12. Meta plans to build $800M data center in Montgomery (opens in a new tab), YouTube, April 1, 2024, video
  13. $1.5B boost: Montgomery set to become tech hub (opens in a new tab), YouTube, video

28 sources on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Montgomery Meta Investment", https://datacenterrecord.org/projects/montgomery-meta-investment-al, last verified September 8, 2026. CSV · JSON
Cite this page

Data Center Record, "Montgomery Meta Investment", https://datacenterrecord.org/projects/montgomery-meta-investment-al. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
built from one source
Tags
Built from one source
Coordinates
32.3675, -86.3
How the location is known
Location is the county seat; exact site not disclosed.
Location source
County seat (Montgomery), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location last verified
September 23, 2026
Published
September 5, 2026
Last verified
September 8, 2026
Undisclosed in public filings
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Montgomery Meta Investment · 28 sources, 19 entries, 0 decisions nearby · basis and source tier on every row · verified September 8, 2026

Download CSV JSON