TECfusions Pennsylvania AI Data Center
TECfusions launched a live AI data center in Pennsylvania. It is reported, as reported September 8, 2026.
How much power it needs, how much water it would use and who would use it have not been disclosed.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Land
- Not disclosed
- Power it would draw
- Not disclosed
- Water
- Not disclosed
- Who leads it
- TECfusions
- as stated by the source
- Who would use it
- Not disclosed
- Jobs once it runs
- Not disclosed
- Tax each year
- Not disclosed
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | Not disclosed | |||
| How much water it would use | Not disclosed | |||
| How loud it would be | Not disclosed | |||
| Jobs once it runs | Not disclosed | |||
| Tax it would pay each year | Not disclosed |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | TECfusions | as stated by the source | October 7, 2026 | |
| Who is constructing it | Not disclosed | |||
| How much land | Not disclosed | |||
| Where its power comes from | Not disclosed | |||
| Grid connection | Not disclosed | |||
| How it is cooled | Not disclosed |
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Water useA state water right filing or a water supply agreement.
- Who would use itA lease announcement or a tenant named in a filing.
- Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
- Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.
What happened
-
(source date; the content gives no date of its own)
Building J is already live and providing computational power to an unnamed tenant [2]
-
(source date; the content gives no date of its own)
TECfusions Keystone Connect could generate up to 3 gigawatts of computational power [2]
-
(source date; the content gives no date of its own)
TECfusions Keystone Connect campus spans 1,400 acres [2]
-
· Status: rumored (source date; the content gives no date of its own)
Upper Burrell Township approved a land development plan for TECfusions Building J on August 5, 2026 [2]
The full TECfusions Pennsylvania AI Data Center timeline, in order
The site
Where in New Kensington is not in the public record. The pin marks the center of New Kensington, not a building, and the outline is the county.
Tap a pin for the data center, the parcel for its record
- This record: Proposed, ringed
- data center
- Dashed edge: the exact site is not in the public record
- Smaller pins: 20 other published records in Pennsylvania
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
- Where
- New Kensington, Pennsylvania
- How exactly it is located
- Town level, the center of the city
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- Nearest records are not computed for a record placed at the center of its town.
Questions about this project
4 questions answered from the record
Who is building TECfusions Pennsylvania AI Data Center?
-
TECfusions is the developer. No construction contractor is named on the record yet.
How much power and water does TECfusions Pennsylvania AI Data Center say it needs?
-
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
Where does TECfusions Pennsylvania AI Data Center stand today?
-
It is reported, as reported September 8, 2026. The newest entry, reported September 8, 2026: Building J is already live and providing computational power to an unnamed tenant [2].
What has New Kensington or its county decided about it?
-
No decision by New Kensington or its county about data centers is on the record. The Pennsylvania scorecard lists every rated row the day a person publishes one.
Sources
Reporting
- TECfusions Launches Live AI Data Center in Pennsylvania - eponline.com, eponline.com, September 1, 2026, local outlet
- Pa. community decries transparency as data center progresses despite moratorium and a lawsuit - The Keystone Newsroom, The Keystone Newsroom, September 8, 2026, local outlet
- TECfusions Announces New Kensington Data Center is Live,, www.globenewswire.com, August 27, 2026, local outlet
3 sources on file.
Cite this record
Data Center Record, "TECfusions Pennsylvania AI Data Center", https://datacenterrecord.org/projects/tecfusions-pennsylvania-ai-data-center-pa, last verified October 7, 2026.
Cite this page
Data Center Record, "TECfusions Pennsylvania AI Data Center", https://datacenterrecord.org/projects/tecfusions-pennsylvania-ai-data-center-pa. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.
For researchers
- Slug
- tecfusions-pennsylvania-ai-data-center-pa
- Status value
- rumored
- Stage
- Proposed
- Tier
- skeleton
- Tags
- skeleton
- Place id
- us/pa
- Coordinates
- 40.5725, -79.7531
- Location precision
- city
- Location source
- Place center (New Kensington), placed at city level: Census 2020 internal point of New Kensington (data/gazetteer/place-points-2020.json)
- Coordinate source
- census centroid
- Location source number
- Not disclosed
- Location last verified
- October 7, 2026
- EPA registry id
- Not disclosed
- Use type values
- not_disclosed
- Tenancy value
- not_disclosed
- Cooling type value
- not_disclosed
- Capacity basis
- not_disclosed
- Water basis
- not_disclosed, gallons_per_day
- Acreage basis
- Not disclosed
- Interconnection value
- not_disclosed
- Capacity, if disclosed
- Not disclosed
- Rating of the county's rows
- Not disclosed
- Published
- 2026-09-04
- Last verified
- 2026-10-07