TECfusions Pennsylvania AI Data Center

TECfusions launched a live AI data center in Pennsylvania. It is reported, as reported September 8, 2026.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 3 sources, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
Not disclosed
Water
Not disclosed
Who leads it
TECfusions
as stated by the source
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it TECfusions as stated by the source October 7, 2026
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What happened

  1. (source date; the content gives no date of its own)

    Building J is already live and providing computational power to an unnamed tenant [2]

  2. (source date; the content gives no date of its own)

    TECfusions Keystone Connect could generate up to 3 gigawatts of computational power [2]

  3. (source date; the content gives no date of its own)

    TECfusions Keystone Connect campus spans 1,400 acres [2]

  4. · Status: rumored (source date; the content gives no date of its own)

    Upper Burrell Township approved a land development plan for TECfusions Building J on August 5, 2026 [2]

The full TECfusions Pennsylvania AI Data Center timeline, in order

The site

Where in New Kensington is not in the public record. The pin marks the center of New Kensington, not a building, and the outline is the county.

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 20 other published records in Pennsylvania
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
New Kensington, Pennsylvania
How exactly it is located
Town level, the center of the city
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at the center of its town.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building TECfusions Pennsylvania AI Data Center?

TECfusions is the developer. No construction contractor is named on the record yet.

How much power and water does TECfusions Pennsylvania AI Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does TECfusions Pennsylvania AI Data Center stand today?

It is reported, as reported September 8, 2026. The newest entry, reported September 8, 2026: Building J is already live and providing computational power to an unnamed tenant [2].

What has New Kensington or its county decided about it?

No decision by New Kensington or its county about data centers is on the record. The Pennsylvania scorecard lists every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. TECfusions Launches Live AI Data Center in Pennsylvania - eponline.com, eponline.com, September 1, 2026, local outlet
  2. Pa. community decries transparency as data center progresses despite moratorium and a lawsuit - The Keystone Newsroom, The Keystone Newsroom, September 8, 2026, local outlet
  3. TECfusions Announces New Kensington Data Center is Live,, www.globenewswire.com, August 27, 2026, local outlet

3 sources on file.

Cite this record

Data Center Record, "TECfusions Pennsylvania AI Data Center", https://datacenterrecord.org/projects/tecfusions-pennsylvania-ai-data-center-pa, last verified October 7, 2026.

Last verified , first recorded . Every correction is logged on the corrections page.

Cite this page

Data Center Record, "TECfusions Pennsylvania AI Data Center", https://datacenterrecord.org/projects/tecfusions-pennsylvania-ai-data-center-pa. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
tecfusions-pennsylvania-ai-data-center-pa
Status value
rumored
Stage
Proposed
Tier
skeleton
Tags
skeleton
Place id
us/pa
Coordinates
40.5725, -79.7531
Location precision
city
Location source
Place center (New Kensington), placed at city level: Census 2020 internal point of New Kensington (data/gazetteer/place-points-2020.json)
Coordinate source
census centroid
Location source number
Not disclosed
Location last verified
October 7, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-04
Last verified
2026-10-07