Google Monroe data center
Monroe County, GADeveloper: GoogleCensus GEOID 13207
- Stage
- Proposed
- Undisclosed in public filings
- Power, Land, Buildings
Google Monroe data center It is reported; the record holds no sourced date for when it reached that stage.
How much power it needs and who would use it have not been disclosed.
Tap a pin for the data center, the parcel for its record
- This record: Proposed, ringed
- data center
- Dashed edge: the exact site is not in the public record
- Smaller pins: 46 other published records in Georgia
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Water
- 2,000,000 gallons a day the developer's figure Not compared: the source did not say whether the figure is withdrawal or consumptive use.
- [1] yahoo.com
- Undisclosed in public filings
- Land, Buildings, Power it would draw, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | ||||
| How much water it would use | 2,000,000 gallons a day | the developer's figure | [1] yahoo.com (opens in a new tab) | October 21, 2026 |
| How loud it would be | ||||
| Jobs once it runs | ||||
| Tax it would pay each year |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | as stated by the source | [1] yahoo.com (opens in a new tab) | October 21, 2026 | |
| Who is constructing it | ||||
| How much land | ||||
| Buildings | ||||
| Where its power comes from | ||||
| Grid connection | ||||
| How it is cooled |
A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Who would use it A lease announcement or a tenant named in a filing.
- Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
- Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.
What happened
No dated entry is on the record yet.
The site
Where in Monroe County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.
- Where
- Monroe County, Georgia
- How exactly it is located
- County level, the county seat
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- Nearest records are not computed for a record placed at a county seat.
Keep going
Questions about this project
4 questions answered from the record
Who is building Google Monroe data center?
-
Google is the developer, yahoo.com (opens in a new tab). No construction contractor is named on the record yet.
How much power and water does Google Monroe data center say it needs?
-
Power: not disclosed by any source on file. Water: 2,000,000 gallons a day (the developer's figure, yahoo.com (opens in a new tab)).
Where does Google Monroe data center stand today?
-
It is reported; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
What has Monroe County decided about it?
-
No decision by Monroe County about data centers is on the record. The Monroe County page and the Georgia scorecard list every rated row the day a person publishes one.
Sources
Reporting
- Google Data Center takes step forward, Central Georgia concerns remain - Yahoo (opens in a new tab), Yahoo, September 9, 2026, national outlet
1 source on file.
About this data
Last verified and first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about Google Monroe data center
Cite this page
Data Center Record, "Google Monroe data center", https://datacenterrecord.org/projects/google-monroe-data-center-ga. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.
For researchers
- Stage
- Proposed
- Tier
- built from one source
- Tags
- Built from one source
- Coordinates
- 33.035, -83.9381
- How the location is known
- Location is the county seat; exact site not disclosed.
- Coordinate source
- county seat, the county seat list
- How water was disclosed
- the developer's figure
- Published
- October 21, 2026
- Last verified
- October 21, 2026
- Undisclosed in public filings
- Location source, Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows