Census GEOID: 29095 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary and 13 reporting sources

● Being Built First recorded September 14, 2026 · 4 Buildings

Google Kansas City Data Center Campus (Project Ranger)

Street address North Chouteau Trafficway and NE Parvin Road, Kansas City, MO 64117, Jackson County verified address Exact, at the address [1] Google: Data center locations

Overview, regulatory gates and specifications

Google is constructing a 4 building hyperscale data center campus at the Hunt Midwest business park in Kansas City, Missouri. [2] Google lists Google Kansas City data center at Kansas City, Missouri on its own page of data center locations, read September 14, 2026. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
Not yet on file
What happens next: Campus is under construction; building inspections, utility energization and air permits are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
4 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: North Chouteau Trafficway and NE Parvin Road, Kansas City, MO 64117.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
4 buildings operator page
[1] datacenters.google
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Google as stated by the source
Official project website
datacenters.google (opens in a new tab) verified October 28, 2026
datacenters.google (opens in a new tab)
Archived promotional websites
datacenters.google (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Google · Parent: Alphabet
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Google Kansas City Data Center Campus (Project Ranger).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 4 buildings operator page [1] datacenters.google
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

March 2, 2026 Independence, MO Independence City Council Nebius AI Factory Tax Abatement and Zoning Hearing Independence City Council 3 clips

At a packed March 2, 2026 meeting, the Independence City Council debated Chapter 100 industrial revenue bonds and zoning for European cloud operator Nebius Group's multi billion dollar AI Factory campus as residents raised concerns over municipal power utility rates and water consumption.

  1. Rory Rowland, Mayor, City of Independence Elected Official transcribed from local broadcast report
    "Brian. Brya I’ve covered a lot of these meetings over the years, but this one was packed way more attendance than any of the city council meeting I’ve ever seen. They have the main room full. They’ve got an overflow full. The whole parking lot had was terribly full. People had to walk really far away. They had 60 different people sign up to speak. They each get up to five minutes. So this is going to be a long night. Take a look inside from video we shot earlier."
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "Nevus is the company. They’re asking the city to take legal title of this data center if approved, so that the development is tax exempt. It’s a 20 year deal. The company is asking for a 90% tax abatement for those 20 years. That will cover. The company was wanting that tax break on both the building and the servers inside those servers. They will replace every five years, they say. Now, in lieu of taxes, nebia will plan to pay hundreds of millions of dollars to the city and the school district."
  3. KMBC 9 Broadcast Report Broadcast Report transcribed from local broadcast report
    "It will cover about 2,000,000ft of warehouses. Now, the data center will use lots of power, and that was one point of contention, equivalent to about 500,000 new homes. Once completed, the center will employ about 130 full time jobs. Now, those in favor see this as a huge construction project. Great for the area. Those against have concerns about noise, utility costs and those tax credits. These are just hypotheticals."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Google lists Google Kansas City data center at Kansas City, Missouri on its own page of data center locations, read September 14, 2026.

    [1] datacenters.google

Nearest data centers in Missouri

Verified data center records in Missouri within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Edged Kansas City Data Center Campus (KCM01) Kansas City, Clay County 3 mi Being built Edged Energy 100 MW
LightEdge Kansas City SubTropolis Data Center (KCI1) Kansas City, Clay County 3 mi Running LightEdge Solutions 12 MW
NOCIX North Kansas City Data Center (1530 Swift) North Kansas City, Clay County 4 mi Running NOCIX 5 MW
NOCIX North Kansas City Clay Data Center North Kansas City, Clay County 4 mi Running NOCIX 4 MW
Cube NA Data Center Kansas City (101 Holmes) Kansas City, Jackson County 5 mi Running Cube NA Data Center Company 6 MW
DataBank Kansas City Data Center (MCI1) Kansas City, Jackson County 6 mi Running DataBank 10 MW

Blank cell: not disclosed by any source on file.

Common questions about Google Kansas City Data Center Campus (Project Ranger)

Answered directly from the verified filings and local actions on this page.

Who is building Google Kansas City Data Center Campus (Project Ranger)?

Google is the developer. No construction contractor is named on the record yet.

How much power and water does Google Kansas City Data Center Campus (Project Ranger) say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Google Kansas City Data Center Campus (Project Ranger) stand today?

It is being built; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Google: Data center locations (opens in a new tab), Google, September 14, 2026

Reporting

  1. Google reveals plans for a new $1 billion data center in Kansas City - fox4kc.com (opens in a new tab), fox4kc.com, March 20, 2024, local outlet
  2. Exclusive: Google buys nearly 500 acres at a second, larger Northland data center site - The Business Journals (opens in a new tab), The Business Journals, January 9, 2024, local outlet
  3. Google confirms plans for $1B data center in Hunt Midwest Business Park - The Business Journals (opens in a new tab), The Business Journals, March 20, 2024, local outlet
  4. Google selects Kansas City for new data center - KOMU 8 (opens in a new tab), KOMU 8, March 20, 2024, local outlet
  5. Google to Build $1B Data Center in Kansas City - Connect CRE (opens in a new tab), Connect CRE, March 21, 2024, news outlet
  6. News | Google’s Pick of Kansas City for Data Center Shows Midwest’s Growing Digital Allure - CoStar (opens in a new tab), CoStar, March 28, 2024, news outlet
  7. Google applies to develop Kansas City data center - Data Center Dynamics (opens in a new tab), Data Center Dynamics, September 11, 2023, news outlet
  8. Google files first project plan for large data center campus in KC's Northland - The Business Journals (opens in a new tab), The Business Journals, October 24, 2023, local outlet
  9. Tax breaks for Google data center spark protest at Port KC meeting - The Business Journals (opens in a new tab), The Business Journals, April 29, 2025, local outlet
  10. Google buys more land at another Northland data center site - fox4kc.com (opens in a new tab), fox4kc.com, January 10, 2024, local outlet
  11. Google to build $1 billion data center in Kansas City - KCTV (opens in a new tab), KCTV, March 20, 2024, local outlet
  12. 'We need jobs, not promises': Community members push back against data center tax breaks - KSHB 41 Kansas City (opens in a new tab), KSHB 41 Kansas City, April 29, 2025, local outlet
1 more source
  1. Major tech company to build new $10 billion 500-acre campus in Northland - fox4kc.com (opens in a new tab), fox4kc.com, July 28, 2025, local outlet

14 sources on file.

Regional grid context

This site is in the SERC Midwest (SRMW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Google Kansas City Data Center Campus (Project Ranger)", https://datacenterrecord.org/projects/google-kansas-city-data-center-mo, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Google Kansas City Data Center Campus (Project Ranger)", https://datacenterrecord.org/projects/google-kansas-city-data-center-mo. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
built from one source
Tags
Built from one source
Coordinates
39.1685, -94.5242
How the location is known
Location from the site's street address.
Location source
https://datacenters.google/locations/
Coordinate source
Kansas City Hunt Midwest Northland campus parcel
Location last verified
September 14, 2026
Published
September 14, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Google Kansas City Data Center Campus (Project Ranger) · 14 sources, 1 entry · basis and source tier on every row · verified October 27, 2026