Cube Na Data Center Company LLC

Kansas City, Jackson County, MODeveloper: Cube Na Data Center CompanyCensus GEOID 29095

Undisclosed in public filings
Power, Land, Buildings, Water

The EPA's facility registry lists Cube Na Data Center Company LLC at 101 Holmes, Kansas City, MO 64108 in Kansas City, Missouri, with an air permit and a hazardous waste record. It is not yet verified: a public source shows this site exists and names no stage for it, such as a permit on file or an operator's list that calls it in consideration; its current status has not been confirmed from a record.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 1 source, 1 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Not yet verified, ringed
  • data center
  • Smaller pins: 19 other published records in Missouri
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Who leads it
Cube Na Data Center Company as stated by the source
[1] echo.epa.gov
Undisclosed in public filings
Land, Buildings, Power it would draw, Water, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Cube Na Data Center Company as stated by the source [1] echo.epa.gov (opens in a new tab) October 20, 2026
Who is constructing it
How much land
Buildings
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Jackson County and Kansas City about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Independence case by case In Independence Missouri, voters recalled a City Council member who supported tax breaks for a proposed data center latimes.com (opens in a new tab)
Independence case by case Independence, MO residents held a recall vote related to a data center decision dailykos.com (opens in a new tab)
Independence case by case Missouri voters recalled councilman over Nebius data center tax break yahoo.com (opens in a new tab)
Independence case by case An Independence councilman was recalled by voters in his district after his vote for data center tax incentives kshb.com (opens in a new tab)
Independence case by case John Perkins, Independence councilman, was recalled after voting to approve a multibillion dollar data center kmbc.com (opens in a new tab)
Independence case by case Independence councilman faces recall over data center vote kctv5.com (opens in a new tab)
4 earlier decisions on the county's rows
DateWhoDecisionSource
Independence case by case An Independence council member faced a recall election after voting for a data center kshb.com (opens in a new tab)
Independence case by case Bly Road residents filed a 52 page lawsuit to stop the Independence AI data center project kshb.com (opens in a new tab)
Independence case by case Two of five city councilmembers who voted to give an AI data center 90% tax abatement were ousted in elections on April 8, 2026. kcur.org (opens in a new tab)
Independence case by case City council voted to give Nebius more than $6 billion in tax breaks in March 2026. kcur.org (opens in a new tab)

What happened

No dated entry is on the record yet.

The site

The pin is the site, as the EPA's facility record places it. Location from an EPA air permit.

The site map is at the top of the page.

Where
101 Holmes, Kansas City, MO 64108, Kansas City, Jackson County, Missouri [1] echo.epa.gov (opens in a new tab)
How exactly it is located
Exact, the point of the EPA's facility record
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
By the straight line between two exact points.

USGS NAIP aerial view of Cube Na Data Center Company LLC
LAT 39.11287 / LON -94.57684 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building Cube Na Data Center Company LLC?

Cube Na Data Center Company is the developer, echo.epa.gov (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Cube Na Data Center Company LLC say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Cube Na Data Center Company LLC stand today?

It is not yet verified: a public source shows this site exists and names no stage for it, such as a permit on file or an operator's list that calls it in consideration; its current status has not been confirmed from a record. No dated entry is on the record yet.

What has Kansas City or Jackson County decided about it?

Independence (rated case by case): In Independence Missouri, voters recalled a City Council member who supported tax breaks for a proposed data center (reported September 14, 2026, latimes.com (opens in a new tab)); and Independence: Independence, MO residents held a recall vote related to a data center decision (reported September 3, 2026, dailykos.com (opens in a new tab)). 10 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. EPA ECHO detailed facility report: Cube Na Data Center Company LLC (opens in a new tab), U.S. Environmental Protection Agency

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Cube Na Data Center Company LLC", https://datacenterrecord.org/projects/cube-na-data-center-company-llc-kansas-city-mo, last verified October 20, 2026. CSV · JSON
Cite this page

Data Center Record, "Cube Na Data Center Company LLC", https://datacenterrecord.org/projects/cube-na-data-center-company-llc-kansas-city-mo. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Not yet verified
Tier
built from one source
Tags
Built from one source
Coordinates
39.11287, -94.57684
How the location is known
Location from an EPA facility record.
Location source
EPA ECHO facility record 110015866892: the registry placed its point by address matching house number, accurate to 50 m
Coordinate source
epa frs point
Location source number
[1]
Location last verified
October 20, 2026
EPA registry id
110015866892
Rating of the county's rows
Case by case
Published
October 20, 2026
Last verified
October 20, 2026
Undisclosed in public filings
Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed

Researcher view · Cube Na Data Center Company LLC · 1 source, 0 entries, 10 decisions nearby · basis and source tier on every row · verified October 20, 2026

Download CSV JSON