Census GEOID: 51041 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 2 primary and 3 reporting sources

● Being Built Reported September 16, 2026 · 2 Buildings

Google Chesterfield County data center

Street address 15800 Jefferson Davis Hwy, Meadowville Technology Park, Chester, VA 23836, Chesterfield County verified address Exact, at the address [2] County seat (Chesterfield Court House), Wikidata, placed at county level

Overview, regulatory gates and specifications

Google lists a data center at Chesterfield County, Virginia and says it is being built. [3] Filings on the record specify 2 planned or operational buildings. [1] Google proposes three data center buildings of about 300,000 square feet each, three electric substations, a 28,000 square foot office building, and associated roads and parking at Botetourt Center [5]

Verified Site & Permit Summary
Verified address
15800 Jefferson Davis Hwy, Meadowville Technology Park, Chester, VA 23836, Chesterfield County verified address
Operator / developer
Google
Permit / registry ID
Data Center Dynamics on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Campus is under construction; building inspections, utility energization and air permits are monitored.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
[1] datacenters.google
Backup generators
Not disclosed
Capital investment
$264 million developer figure
[5] cardinalnews.org
Who leads it
Google as stated by the source
[1] datacenters.google
Official project website
datacenters.google (opens in a new tab) verified October 28, 2026
datacenters.google (opens in a new tab)
Archived promotional websites
datacenters.google (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

White House

Ratepayer Protection Pledge

DID Recorded statement at Cardinal News (September 16, 2026) [5]
SAID Google and other tech companies voluntarily agree to pay for all new power delivery infrastructure upgrades required to service their data centers under the Ratepayer Protection Pledge (September 16, 2026) [5]

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Google · Parent: Alphabet
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Google Chesterfield County data center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 2 buildings Site filing [1] datacenters.google
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    Appalachian Power plans the Daleville Area Transmission Improvements Project to connect Google to the grid, involving upgrading nearly 20 miles of transmission line with completion expected in late 2029

    [5] cardinalnews.org

  2. (source date; the content gives no date of its own)

    Google purchased the output of a 79 megawatt wind power plant in Botetourt County

    [5] cardinalnews.org

  3. (source date; the content gives no date of its own)

    Google proposes three data center buildings of about 300,000 square feet each, three electric substations, a 28,000 square foot office building, and associated roads and parking at Botetourt Center

    [5] cardinalnews.org

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Google lists Google Chesterfield County data center at Chesterfield County, Virginia on its own page of data center locations, read September 14, 2026.

    [1] datacenters.google

4 corrections to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: cardinalnews.org is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: cardinalnews.org is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.

  4. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: cardinalnews.org is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Virginia

Verified data center records in Virginia within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Chirisa Richmond LLC Chester, Chesterfield County ~3 mi Proposed Chirisa Technology Parks
COPT Defense Properties - 11751 Meadowville Owner LLC c/o GFH Capital Ltd Chester, Chesterfield County ~3 mi Proposed COPT Defense Properties
Meta Henrico Data Center Sandston, Henrico County 7 mi Running Meta
QTS Richmond Mega Data Center (RIC1 Sandston) Sandston, Henrico County 11 mi Running QTS Data Centers 1 building
QTS Richmond Campus (RIC5 Sandston) Sandston, Henrico County 12 mi Running QTS Data Centers 1 building
QTS Data Centers Sandston Sandston, Henrico County 12 mi Running QTS Data Centers 4 buildings

Blank cell: not disclosed by any source on file.

Common questions about Google Chesterfield County data center

Answered directly from the verified filings and local actions on this page.

Who is building Google Chesterfield County data center?

Google is the developer, datacenters.google (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Google Chesterfield County data center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Google Chesterfield County data center stand today?

It is being built; the date it reached that stage is not sourced, only the day a page was read. The newest entry, reported September 16, 2026: Appalachian Power plans the Daleville Area Transmission Improvements Project to connect Google to the grid, involving upgrading nearly 20 miles of transmission line with completion expected in late 2029 [5].

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Google: Data center locations (opens in a new tab), Google, September 14, 2026
  2. US EPA ECHO and Virginia Department of Environmental Quality Permit & Parcel Record (15800 Jefferson Davis Hwy, Meadowville Technology Park, Chester, VA 23836) (opens in a new tab), U.S. Environmental Protection Agency and Virginia Department of Environmental Quality, November 6, 2026

Reporting

  1. Virginia's Chesterfield County approves rezoning for two data center projects - Data Center Dynamics (opens in a new tab), Data Center Dynamics, June 2, 2025, news outlet
  2. Google reveals involvement with two more data center projects in Chesterfield - Richmond Times-Dispatch (opens in a new tab), Richmond Times-Dispatch, August 29, 2025, local outlet
  3. New details emerge about Botetourt grid upgrades for Google data center - Cardinal News (opens in a new tab), Cardinal News, September 16, 2026, local outlet

5 sources on file.

Regional grid context

This site is in the SERC Virginia and Carolina North (SRVC-N) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Google Chesterfield County data center", https://datacenterrecord.org/projects/google-chesterfield-county-data-center-va, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Google Chesterfield County data center", https://datacenterrecord.org/projects/google-chesterfield-county-data-center-va. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
37.3625, -77.3815
How the location is known
Location from the site's street address.
Location source
County seat (Chesterfield Court House), Wikidata, placed at county level
Coordinate source
US EPA ECHO FRS and municipal parcel records
Location last verified
November 6, 2026
Published
September 14, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Google Chesterfield County data center · 5 sources, 4 entries · basis and source tier on every row · verified November 6, 2026