DataBank Orange County Irvine Campus (SNA1 and SNA2)

Street address 17222 and 17400 Von Karman Avenue, Irvine, CA 92614, Orange County verified address Exact, at the address databank.com (opens in a new tab)

Overview, regulatory gates and specifications

DataBank operates its 2 building Orange County enterprise colocation campus (SNA1 and SNA2) at 17222 and 17400 Von Karman Avenue in Irvine, Orange County, California, delivering 10 MW of critical load. [1] DataBank lists DataBank Irvine data center at Irvine, California on its own page of data center locations, read September 14, 2026. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
10 MW
the developer's figure

Equivalent to ~8,300 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.5% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
2 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 17222 and 17400 Von Karman Avenue, Irvine, CA 92614.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
10 MW developer figure Equivalent to the continuous electricity demand of about 8,300 average U.S. homes based on U.S. Energy Information Administration residential consumption data. Less than 0.1 percent (0.098 percent) of New York City's summer peak demand in 2024.
databank.com (opens in a new tab)
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
databank.com (opens in a new tab)
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2017 (9 years)
Who leads it
DataBank as stated by the source
Official project website
databank.com (opens in a new tab) verified October 28, 2026
databank.com (opens in a new tab)
Archived promotional websites
databank.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. DataBank Orange County Irvine Campus (SNA1 and SNA2), capacity: 10 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 10 ÷ 10,245 = 0.00098 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: DataBank
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for DataBank Orange County Irvine Campus (SNA1 and SNA2).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 10 MW 10 MW the developer's figure
Site Footprint (Acres)
Data Hall Buildings 2 buildings 2 operator page
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    DataBank lists DataBank Irvine data center at Irvine, California on its own page of data center locations, read September 14, 2026.

    [1] databank.com

Nearest data centers in California

Verified data center records in California within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Centersquare Orange County (LAX5 Irvine) Irvine, Orange County Less than 1 mi Running Centersquare 1 building
Centersquare Orange County Irvine Campus (LAX3 and LAX5) Irvine, Orange County Less than 1 mi Running Centersquare 16 MW
Equinix LA7 Torrance Data Center Torrance, Los Angeles County 29 mi Running Equinix 10 MW
Goodman Group Los Angeles Vernon Data Center (LAX01) Vernon, Los Angeles County 31 mi Being built Goodman Group 32 MW
Prime Data Centers and DataBank Vernon Campus (LAX2) Vernon, Los Angeles County 32 mi Being built Prime Data Centers / DataBank 33 MW
Centersquare Los Angeles (LAX4 Hawthorne) Hawthorne, Los Angeles County 32 mi Running Centersquare 1 building

Blank cell: not disclosed by any source on file.

Common questions about DataBank Orange County Irvine Campus (SNA1 and SNA2)

Answered directly from the verified filings and local actions on this page.

Who is building DataBank Orange County Irvine Campus (SNA1 and SNA2)?

DataBank is the developer. No construction contractor is named on the record yet.

How much power and water does DataBank Orange County Irvine Campus (SNA1 and SNA2) say it needs?

Power: 10 MW (the developer's figure, databank.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does DataBank Orange County Irvine Campus (SNA1 and SNA2) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. DataBank: Data centers (opens in a new tab), DataBank, September 14, 2026

1 source on file.

Regional grid context

This site is in the WECC California (CAMX) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "DataBank Orange County Irvine Campus (SNA1 and SNA2)", https://datacenterrecord.org/projects/databank-irvine-data-center-ca, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "DataBank Orange County Irvine Campus (SNA1 and SNA2)", https://datacenterrecord.org/projects/databank-irvine-data-center-ca. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
33.6845, -117.8362
How the location is known
Location from the site's street address.
Location source
https://www.databank.com/data-centers/orange-county/
Coordinate source
Orange County Assessor / DataBank SNA1 and SNA2 specifications
Location last verified
September 14, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
10 MW, the developer's figure
Published
September 14, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · DataBank Orange County Irvine Campus (SNA1 and SNA2) · 1 source, 1 entry · basis and source tier on every row · verified October 27, 2026