● Proposed Campus Announced July 1, 2026 · Sphere 3D

Sphere 3D Hopkinsville Data Center

Location Hopkinsville, Christian County, Kentucky county centroid County level, the county seat

Overview, regulatory gates and specifications

Sphere 3D plans a 50MW data center in Hopkinsville, Kentucky. [2] Sphere 3D announced plans for a 50 megawatt data center facility in Hopkinsville, Christian County, Kentucky. [1]

Verified Site & Permit Summary
Verified address
Hopkinsville, Christian County, Kentucky county centroid
Operator / developer
Sphere 3D
Permit / registry ID
www.stocktitan.net on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Sphere 3D as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Jackie L.

Hopkinsville resident

DID Recorded statement at Kentucky New Era (September 29, 2026)
SAID Jackie L. expressed concerns about data center electricity and water use, noise, and impact on future generations (September 29, 2026) kentuckynewera.com (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Sphere 3D
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Sphere 3D Hopkinsville Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 50 MW Disclosed filing [2] stocktitan.net
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: proposed (content date)

    Sphere 3D announced plans for a 50 megawatt data center facility in Hopkinsville, Christian County, Kentucky.

    [1] datacenterdynamics.com

Every event in order

1 correction to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Kentucky

Nearest records are not computed for a record placed at a county seat. Browse all data centers in Kentucky.

Common questions about Sphere 3D Hopkinsville Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Sphere 3D Hopkinsville Data Center?

Sphere 3D is the developer. No construction contractor is named on the record yet.

How much power and water does Sphere 3D Hopkinsville Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Sphere 3D Hopkinsville Data Center stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Sphere 3D plans 50MW data center in Hopkinsville, Kentucky - Data Center Dynamics (opens in a new tab), Data Center Dynamics, August 24, 2026, trade press
  2. Sphere 3D (NASDAQ: ANY) shifts cash from bitcoin mining into new AI data center plans (opens in a new tab), www.stocktitan.net, September 12, 2026, national outlet

2 sources on file.

Regional grid context

This site is in the SERC Tennessee Valley (SRTV) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Sphere 3D Hopkinsville Data Center", https://datacenterrecord.org/projects/sphere-3d-hopkinsville-data-center-ky, last verified September 17, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Sphere 3D Hopkinsville Data Center", https://datacenterrecord.org/projects/sphere-3d-hopkinsville-data-center-ky. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
36.85444, -87.48861
How the location is known
Location is the county seat; exact site not disclosed.
Location source
County seat (Hopkinsville), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location last verified
September 16, 2026
Capacity, if disclosed
50 MW, not disclosed
Published
September 5, 2026
Last verified
September 17, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Sphere 3D Hopkinsville Data Center · 2 sources, 1 entry · basis and source tier on every row · verified September 17, 2026

Download CSV JSON