Data Center Record.
Census GEOID: 33013 Location Precision: county centroid Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 5 reporting sources

● Proposed Campus Reported September 1, 2026

Bow Data Center (350 MW)

Location Bow, Merrimack County, New Hampshire county centroid County level, the county seat

Overview, regulatory gates and specifications

An unnamed company asked Eversource to assess a potential 350 MW data center facility in Bow, and Bow is reported to be in talks to become the site of a new hyperscale data center. [1] Granite Shore Power filed a request with the Federal Energy Regulatory Commission to discuss connecting a 350 megawatt project to the regional power grid. [3]

Verified Site & Permit Summary
Verified address
Bow, Merrimack County, New Hampshire county centroid
Operator / developer
Not disclosed in filing
Permit / registry ID
New Hampshire Bulletin on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
Not disclosed
Capital investment
Not disclosed
Not disclosed
Who leads it, Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Kelly Ayotte

Kelly Ayotte

Governor of New Hampshire · New Hampshire

DID Recorded statement at Vermont Public (September 23, 2026)
SAID Gov. Kelly Ayotte said she was against the plan for a data center in Bow and planned to propose a statewide data center construction moratorium in her 2027 budget. (September 23, 2026) nhpr.org (opens in a new tab)

Sharon Carson

Senate President

DID Recorded statement at Concord Monitor (September 23, 2026) [3]
SAID Senate President Sharon Carson said that the Senate would explore legislation to protect New Hampshire taxpayers from data center development costs. (September 23, 2026) [3]

William Hinkle

Eversource spokesman

DID Recorded statement at WMUR (September 2, 2026) [5]
SAID William Hinkle, Eversource spokesman, said Eversource is obligated by law to respond to all developer proposals and has no role in determining whether projects are allowed to interconnect if they receive required approvals (September 2, 2026) [5]

Granite Shore Power

Public Record Speaker

DID Recorded statement at WMUR (September 2, 2026) [5]
SAID Granite Shore Power said no decisions have been made about redevelopment use of nearly 400 acre property (September 2, 2026) [5]

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Not disclosed
UTILITIES
Electric utility: Not disclosed

View all 10 statements on the record in New Hampshire →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Bow Data Center (350 MW).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 350 MW Disclosed filing [1] newhampshirebulletin.com
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Who is behind it A land record, a zoning application or a company's own announcement.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. Filing (source date; the content gives no date of its own)

    Granite Shore Power filed a request with the Federal Energy Regulatory Commission to discuss connecting a 350 megawatt project to the regional power grid.

    [3] concordmonitor.com

  2. (source date; the content gives no date of its own)

    Merrimack Station coal fired power plant in Bow set to cease operations in 2028

    [5] wmur.com

  3. Filing (source date; the content gives no date of its own)

    Granite Shore Power filed request for 350 megawatt facility interconnection to power grid

    [5] wmur.com

  4. Filing (source date; the content gives no date of its own)

    Public Service of New Hampshire, subsidiary of Eversource Energy, filed viability assessment with Granite Shore Power LLC in April 2026

    [5] wmur.com

  5. (source date; the content gives no date of its own)

    Data center would use Merrimack River for cooling water source

    [2] nhpr.org

  6. (source date; the content gives no date of its own)

    Town official confirmed high level discussions between company and Bow about bringing data center to town

    [2] nhpr.org

  7. (source date; the content gives no date of its own)

    Merrimack Station is former coal fired power plant that closed in September 2025

    [2] nhpr.org

  8. Filing (source date; the content gives no date of its own)

    Granite Shore Power filed request with Federal Energy Regulatory Commission in April 2026 to enter discussions with Eversource about connecting 350 megawatt project to power grid

    [2] nhpr.org

1 earlier entry
  1. · reported Filing (source date; the content gives no date of its own)

    FERC filing shows Granite Shore Power requested viability study for data center project at Merrimack Station site in Bow, filed in April 2026

    [1] newhampshirebulletin.com

Every event in order

12 corrections to this record

Every correction, with its reason
  1. · Citation

    Cites the later report of the same claim by the same speaker (said again on September 2, 2026; the record's rules, October 10, 2026).

  2. · Citation

    Cites the later report of the same claim by the same speaker (said again on September 2, 2026; the record's rules, October 10, 2026).

  3. · Speaker role

    Speaker read again from the statement's source line, "Governor Kelly Ayotte": the title in front of the name (Governor) is the role, not part of the name.

  4. · Speaker

    Speaker read again from the statement's source line, "Governor Kelly Ayotte": the title in front of the name (Governor) is the role, not part of the name.

  5. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  6. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  7. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in New Hampshire

Verified data center records in New Hampshire within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Bow Data Center Bow, Merrimack County Less than 1 mi Proposed
FirstLight Bedford Colocation Data Center (8 Commerce Drive) Bedford, Hillsborough County ~18 mi Running FirstLight Fiber
Nottingham Data Center (unnamed developer) Nottingham, Rockingham County ~28 mi Proposed Thomas Moulton
Liberty Mutual Data Center Portsmouth, Rockingham County ~39 mi Running Liberty Mutual Insurance
Dartmouth College Data Center Lebanon, Grafton County ~47 mi Running Dartmouth College

Blank cell: not disclosed by any source on file.

Common questions about Bow Data Center (350 MW)

Answered directly from the verified filings and local actions on this page.

Who is building Bow Data Center (350 MW)?

Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.

How much power and water does Bow Data Center (350 MW) say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Bow Data Center (350 MW) stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Possible hyperscale data center eyed for Bow - New Hampshire Bulletin (opens in a new tab), New Hampshire Bulletin, September 1, 2026, local outlet
  2. Bow in talks to become site of new data center - concordmonitor.com (opens in a new tab), concordmonitor.com, September 1, 2026, local outlet
  3. ‘Please, do not allow this to happen’: Residents call for proactive steps to prevent data center in Bow (opens in a new tab), Concord Monitor, September 23, 2026, local outlet
  4. Tax relief or environmental threat? Bow residents divided over possible data center - concordmonitor.com (opens in a new tab), concordmonitor.com, September 4, 2026, local outlet
  5. Company asks Eversource to assess potential 350 MW facility in Bow - WMUR (opens in a new tab), WMUR, September 2, 2026, local outlet

5 sources on file.

Regional grid context

This site is in the NPCC New England (NEWE) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Bow Data Center (350 MW)", https://datacenterrecord.org/projects/bow-data-center-350-mw-nh, last verified September 25, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Bow Data Center (350 MW)", https://datacenterrecord.org/projects/bow-data-center-350-mw-nh. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
43.20667, -71.53806
How the location is known
Location is the county seat; exact site not disclosed.
Location source
County seat (Concord), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location last verified
September 16, 2026
Capacity, if disclosed
350 MW, not disclosed
Published
September 5, 2026
Last verified
September 25, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Bow Data Center (350 MW) · 5 sources, 9 entries · basis and source tier on every row · verified September 25, 2026

Download CSV JSON