A data center proposal in Nottingham was withdrawn by the developer amid widespread community opposition hours before opponents were to pack a town meeting, with a 12 month moratorium on data center construction subsequently heading to a town vote. [11] A feasibility study is planned in Bow for a hyperscale data center likely on the site of the former coal fired power plant owned by Granite Shore Power, LLC [17]
U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.
Utility interconnection queue filings monitored.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Parcel boundaries and municipal zoning tracked.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Connected government officials, corporate entities, utilities and local rules on the public record.
Governor Kelly Ayotte said she would propose a statewide moratorium on data centers in her next state budget(September 9, 2026) [18]
Kristen Lamb said residents want to move forward with a moratorium or make it explicit that data centers cannot be approved(June 3, 2026) [11]
I kind of didn't expect this at all, to be honest with you(May 27, 2026) vnews.com (opens in a new tab)
My neighbors, specifically, had to actually drill deeper, just to get water(May 27, 2026) vnews.com (opens in a new tab)
View all 6 statements on the record in New Hampshire →
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Nottingham Data Center (unnamed developer).
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | |||
| Data Hall Buildings | |||
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
WMUR TV report on Nottingham Select Board and community proceedings in Nottingham, NH: Nottingham residents push back against proposed data center (May 22, 2026).
"With the data center. Data centers are popping up throughout the country. They are physical facilities that essentially act like factories for the internet. The data centers are, I think, going to be a necessary evil. I don’t mean the word evil in the way I may say it, but a necessary part of our future life in our country. And we have to store data. The plans are still in their conceptual phase. But tom moulton, who is proposing it, says it could bring a lot of tax revenue to the area."
"Every home here has a well, so a data center will use a lot of our water. And what will that mean for the quality of our water? Moulton says that shouldn’t be a concern. It would be a closed loop system, which means you would fill up this big tank of water. It would be like a radiator in your car, and it would just go through the system cool, and go right back in again. It would just cool the equipment that way. So you’re not taking water off the site."
Using this data in a report? Support the record.
Chronological regulatory, corporate and permitting events on the record, newest first.
(source date; the content gives no date of its own)
A feasibility study is planned in Bow for a hyperscale data center likely on the site of the former coal fired power plant owned by Granite Shore Power, LLC
· Status: rumored Filing (source date; the content gives no date of its own)
Moulton withdrew his application hours before the planning board meeting last Wednesday
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
Every correction on the record is on the corrections page.
Verified data center records in New Hampshire within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Liberty Mutual Data Center Portsmouth, Rockingham County | ~15 mi | Running | Liberty Mutual Insurance | |
| FirstLight Bedford Colocation Data Center (8 Commerce Drive) Bedford, Hillsborough County | ~21 mi | Running | FirstLight Fiber | |
| Bow Data Center (350 MW) Bow, Merrimack County | ~28 mi | Proposed | ||
| Bow Data Center Bow, Merrimack County | ~28 mi | Proposed |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Thomas Moulton is the developer, businessnhmagazine.com (opens in a new tab). No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is reported, as reported June 3, 2026. The newest entry, reported September 9, 2026: A feasibility study is planned in Bow for a hyperscale data center likely on the site of the former coal fired power plant owned by Granite Shore Power, LLC [17].
24 sources on file.
This site is in the NPCC New England (NEWE) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Nottingham Data Center (unnamed developer). Last verified September 25, 2026. https://datacenterrecord.org/projects/nottingham-data-center-unnamed-developer-nh. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Nottingham Data Center (unnamed developer)
Data Center Record, "Nottingham Data Center (unnamed developer)", https://datacenterrecord.org/projects/nottingham-data-center-unnamed-developer-nh. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.