Nottingham conservation committee and master plan update subcommittee member
Kristen Lamb expressed concerns about water quality impacts, increased electricity bills and noise pollution from the data center
A data center proposal in Nottingham was withdrawn by the developer amid widespread community opposition hours before opponents were to pack a town meeting, with a 12 month moratorium on data center construction subsequently heading to a town vote. It is reported, as reported June 3, 2026.
How much power it needs, how much water it would use and who would use it have not been disclosed.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
Each figure as its source gave it. The number in brackets is its place in the source list.
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | Not disclosed | |||
| How much water it would use | Not disclosed | |||
| How loud it would be | Not disclosed | |||
| Jobs once it runs | Not disclosed | |||
| Tax it would pay each year | Not disclosed |
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | Thomas Moulton | as stated by the source | [11] businessnhmagazine.com | September 25, 2026 |
| Who is constructing it | Not disclosed | |||
| How much land | Not disclosed | |||
| Where its power comes from | Not disclosed | |||
| Grid connection | Not disclosed | |||
| How it is cooled | Not disclosed |
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
The record adds each the day a source gives it. Why these documents.
Acts of Rockingham County and Nottingham about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Nottingham | Nottingham residents voted in favor of a 12 month moratorium on data center development with 1,335 votes in favor to 143 against | nenc.news | |
| Nottingham | The vote was 1,335 in favor, to 143 against | ctpublic.org | |
| Nottingham | Nottingham residents voted in favor of a 12 month moratorium on any data center development within town limits | ctpublic.org | |
| Nottingham | Nottingham held a town vote on 12 month moratorium on data center construction by 2026-07-03 | nhpr.org | |
| Nottingham | The planning board's workshop meeting will be held at 7 p.m. on June 3 at the town office building | businessnhmagazine.com |
(source date; the content gives no date of its own)
A feasibility study is planned in Bow for a hyperscale data center likely on the site of the former coal fired power plant owned by Granite Shore Power, LLC [17]
· Status: rumored (source date; the content gives no date of its own)
Moulton withdrew his application hours before the planning board meeting last Wednesday [11]
The full Nottingham Data Center (unnamed developer) timeline, in order
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
Every correction on the record is on the corrections page.
Governor Kelly Ayotte proposed a statewide moratorium on data centers in next state budget
Kristen Lamb said residents want to move forward with a moratorium or make it explicit that data centers cannot be approved
Every statement about data centers in New Hampshire, by speaker
Nottingham conservation committee and master plan update subcommittee member
Kristen Lamb expressed concerns about water quality impacts, increased electricity bills and noise pollution from the data center
Where in Rockingham County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.
Tap a pin for the data center, the parcel for its record
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
Thomas Moulton is the developer, source. No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is reported, as reported June 3, 2026. The newest entry, reported September 9, 2026: A feasibility study is planned in Bow for a hyperscale data center likely on the site of the former coal fired power plant owned by Granite Shore Power, LLC [17].
Nottingham (rated restrictive): Nottingham residents voted in favor of a 12 month moratorium on data center development with 1,335 votes in favor to 143 against (reported September 9, 2026, source); and Nottingham: The vote was 1,335 in favor, to 143 against (reported September 9, 2026, source). 5 events are on the county's rows; a rule about the area is not a decision about this record.
24 sources on file.
Data Center Record, "Nottingham Data Center (unnamed developer)", https://datacenterrecord.org/projects/nottingham-data-center-unnamed-developer-nh, last verified September 25, 2026.
Data Center Record, "Nottingham Data Center (unnamed developer)", https://datacenterrecord.org/projects/nottingham-data-center-unnamed-developer-nh. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.