● Proposed Campus Reported June 3, 2026

Nottingham Data Center (unnamed developer)

Location Nottingham, Rockingham County, New Hampshire county centroid County level, the county seat

Overview, regulatory gates and specifications

A data center proposal in Nottingham was withdrawn by the developer amid widespread community opposition hours before opponents were to pack a town meeting, with a 12 month moratorium on data center construction subsequently heading to a town vote. [11] A feasibility study is planned in Bow for a hyperscale data center likely on the site of the former coal fired power plant owned by Granite Shore Power, LLC [17]

1. Land & Parcel
Location tracked
2. Local Zoning
Not yet on file
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
Not yet on file
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings
Not disclosed
Acreage not stated in public filings yet

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Parcel boundaries and municipal zoning tracked.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Thomas Moulton as stated by the source
[11] businessnhmagazine.com
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Kelly Ayotte

Kelly Ayotte

Governor, New Hampshire · New Hampshire

DID Recorded statement at New Hampshire Public Radio (September 9, 2026) [18]
SAID Governor Kelly Ayotte said she would propose a statewide moratorium on data centers in her next state budget (September 9, 2026) [18]

Kristen Lamb

Nottingham conservation committee and master plan update subcommittee member

DID Recorded statement at www.businessnhmagazine.com (June 3, 2026) [11]
SAID Kristen Lamb said residents want to move forward with a moratorium or make it explicit that data centers cannot be approved (June 3, 2026) [11]

Tom Moulton

Applicant · Nottingham Business Park

DID Recorded statement at Phone call (May 27, 2026)
SAID I kind of didn't expect this at all, to be honest with you (May 27, 2026) vnews.com (opens in a new tab)

Rudy P.

Resident · Nottingham community

DID Recorded statement at Planning board meeting (May 27, 2026)
SAID My neighbors, specifically, had to actually drill deeper, just to get water (May 27, 2026) vnews.com (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Thomas Moulton
UTILITIES
Electric utility: Not disclosed

View all 6 statements on the record in New Hampshire →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Nottingham Data Center (unnamed developer).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

May 22, 2026 Nottingham, NH Nottingham residents push back against proposed data center Nottingham Select Board 2 clips

WMUR TV report on Nottingham Select Board and community proceedings in Nottingham, NH: Nottingham residents push back against proposed data center (May 22, 2026).

  1. WMUR TV Broadcast Report Broadcast Report transcribed from local broadcast report
    "With the data center. Data centers are popping up throughout the country. They are physical facilities that essentially act like factories for the internet. The data centers are, I think, going to be a necessary evil. I don’t mean the word evil in the way I may say it, but a necessary part of our future life in our country. And we have to store data. The plans are still in their conceptual phase. But tom moulton, who is proposing it, says it could bring a lot of tax revenue to the area."
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "Every home here has a well, so a data center will use a lot of our water. And what will that mean for the quality of our water? Moulton says that shouldn’t be a concern. It would be a closed loop system, which means you would fill up this big tank of water. It would be like a radiator in your car, and it would just go through the system cool, and go right back in again. It would just cool the equipment that way. So you’re not taking water off the site."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    A feasibility study is planned in Bow for a hyperscale data center likely on the site of the former coal fired power plant owned by Granite Shore Power, LLC

    [17] nenc.news

  2. · Status: rumored Filing (source date; the content gives no date of its own)

    Moulton withdrew his application hours before the planning board meeting last Wednesday

    [11] businessnhmagazine.com

Every event in order

11 corrections to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  4. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  5. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  6. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  7. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  8. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  9. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  10. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  11. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in New Hampshire

Verified data center records in New Hampshire within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Liberty Mutual Data Center Portsmouth, Rockingham County ~15 mi Running Liberty Mutual Insurance
FirstLight Bedford Colocation Data Center (8 Commerce Drive) Bedford, Hillsborough County ~21 mi Running FirstLight Fiber
Bow Data Center (350 MW) Bow, Merrimack County ~28 mi Proposed
Bow Data Center Bow, Merrimack County ~28 mi Proposed

Blank cell: not disclosed by any source on file.

Common questions about Nottingham Data Center (unnamed developer)

Answered directly from the verified filings and local actions on this page.

Who is building Nottingham Data Center (unnamed developer)?

Thomas Moulton is the developer, businessnhmagazine.com (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Nottingham Data Center (unnamed developer) say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Nottingham Data Center (unnamed developer) stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Nottingham data center plan withdrawn. Seacoast businessman explains why. - Seacoastonline.com (opens in a new tab), Seacoastonline.com, May 27, 2026, news outlet
  2. Developer behind Nottingham data center donated to Kelly Ayotte - Granite Post News (opens in a new tab), Granite Post News, June 11, 2026, news outlet
  3. Entrepreneur faces backlash over Nottingham data center - Valley News (opens in a new tab), Valley News, May 28, 2026, news outlet
  4. Nottingham data center proposal withdrawn after backlash - New Hampshire Public Radio (opens in a new tab), New Hampshire Public Radio, May 27, 2026, local outlet
  5. Nottingham data center plan may be revived; town weighs 12‑month ban - Seacoastonline.com (opens in a new tab), Seacoastonline.com, June 29, 2026, news outlet
  6. New Hampshire can't wait on data center action: Warmington - Seacoastonline.com (opens in a new tab), Seacoastonline.com, June 23, 2026, news outlet
  7. Proposal for data center in Nottingham, New Hampshire, withdrawn after facing intense opposition - Data Center Dynamics (opens in a new tab), Data Center Dynamics, June 3, 2026, news outlet
  8. Nottingham data center proposal sparks controversy - vnews.com (opens in a new tab), vnews.com, June 6, 2026, news outlet
  9. Power-hungry data centers don’t fit New Hampshire realities - The Washington Post (opens in a new tab), The Washington Post, January 12, 2026, national outlet
  10. Nottingham's data center challenge a concern for all Granite Staters: Rafter - seacoastonline.com (opens in a new tab), seacoastonline.com, June 24, 2026, news outlet
  11. As Nottingham Continues to Address Backlash to Data Center Proposal, What Does NH Law Say? (opens in a new tab), www.businessnhmagazine.com, June 3, 2026, local outlet
  12. AI Data Center Paused Amid Uproar in Nottingham - InDepthNH.org (opens in a new tab), InDepthNH.org, May 27, 2026, local outlet
12 more sources
  1. Plans for data center in NH withdrawn amid widespread community opposition - NBC Boston (opens in a new tab), NBC Boston, May 27, 2026, local outlet
  2. New Hampshire data center developer withdraws plans hours before opponents were to pack town meeting - Business Insider (opens in a new tab), Business Insider, May 27, 2026, national outlet
  3. Data center proposal in Nottingham stirs controversy and statewide attention - New Hampshire Public Radio (opens in a new tab), New Hampshire Public Radio, May 26, 2026, local outlet
  4. Data center proposal in Nottingham faces pushback from some residents - WMUR (opens in a new tab), WMUR, May 22, 2026, local outlet
  5. Nottingham, NH voters overwhelmingly approve moratorium on data centers - nenc.news (opens in a new tab), nenc.news, September 9, 2026, news outlet
  6. Nottingham voters overwhelmingly approve moratorium on data centers - New Hampshire Public Radio (opens in a new tab), New Hampshire Public Radio, September 9, 2026, local outlet
  7. Proposal for data center in Nottingham withdrawn - WMUR (opens in a new tab), WMUR, May 28, 2026, local outlet
  8. Nottingham data center proposal withdrawn after backlash - nhbr.com (opens in a new tab), nhbr.com, June 5, 2026, news outlet
  9. Data Center Proposed for Nottingham Property - InDepthNH.org (opens in a new tab), InDepthNH.org, May 20, 2026, local outlet
  10. Developer may bring controversial data center proposal back to New Hampshire as town seeks moratorium - The Cool Down (opens in a new tab), The Cool Down, July 3, 2026, national outlet
  11. Nottingham’s 12-month moratorium on data center construction heads to a town vote - New Hampshire Public Radio (opens in a new tab), New Hampshire Public Radio, July 3, 2026, local outlet
  12. How a data center proposal ignited opposition in Nottingham and surrounding communities - New Hampshire Bulletin (opens in a new tab), New Hampshire Bulletin, May 29, 2026, local outlet

24 sources on file.

Regional grid context

This site is in the NPCC New England (NEWE) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Nottingham Data Center (unnamed developer)", https://datacenterrecord.org/projects/nottingham-data-center-unnamed-developer-nh, last verified September 25, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Nottingham Data Center (unnamed developer)", https://datacenterrecord.org/projects/nottingham-data-center-unnamed-developer-nh. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
42.97861, -71.07278
How the location is known
Location is the county seat; exact site not disclosed.
Location source
County seat (Brentwood), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location last verified
September 16, 2026
Published
September 5, 2026
Last verified
September 25, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Nottingham Data Center (unnamed developer) · 24 sources, 2 entries · basis and source tier on every row · verified September 25, 2026