Census GEOID: 33013 Location Precision: county centroid Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 8 reporting sources

● Proposed Campus Reported September 2, 2026

Bow Data Center

Location Bow, Merrimack County, New Hampshire county centroid County level, the county seat

Overview, regulatory gates and specifications

Bow residents are divided over a possible data center, with debate centering on tax relief benefits versus environmental concerns. [1] Granite Shore Power, owners of closed Merrimack Station in Bow, filed request with Federal Energy Regulatory Commission to enter discussions with Eversource about making a connection to the power grid for a 350 megawatt project [5]

Verified Site & Permit Summary
Verified address
Bow, Merrimack County, New Hampshire county centroid
Operator / developer
Not disclosed in filing
Permit / registry ID
InDepthNH.org on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
Not disclosed
Capital investment
Not disclosed
Not disclosed
Who leads it, Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Sam H.

resident of Hopkinton

DID Recorded statement at Concord Monitor (September 24, 2026) [5]
SAID Sam H., resident of Hopkinton, wrote that construction of hyperscale data center will be detriment to Bow and region because these facilities consume enormous amounts of electricity, provide few permanent jobs, require environmental costs and infrastructure, and risk higher rates (September 24, 2026) [5]

Beth H.

Pembroke resident

DID Recorded statement at Concord Monitor (September 23, 2026)
SAID Beth H. stated that a data center at Merrimack Station would impact the region at large and downstream communities (September 23, 2026) concordmonitor.com (opens in a new tab)

Michael Vose

former N.H. House Science, Technology, & Energy Committee chair

DID Recorded statement at UnionLeader.com (September 16, 2026) [4]
SAID Michael Vose, former chair of the N.H. House Science, Technology, & Energy Committee and sponsor of HB 672, argues that data centers should provide their own power under House Bill 672 rather than being subject to a state moratorium. (September 16, 2026) [4]
Kelly Ayotte

Kelly Ayotte

Governor of New Hampshire · New Hampshire

DID Recorded statement at UnionLeader.com (September 16, 2026) [4]
SAID Governor Kelly Ayotte has proposed a statewide data center moratorium, citing insufficient state energy resources. (September 16, 2026) [4]

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Not disclosed
UTILITIES
Electric utility: Not disclosed

View all 12 statements on the record in New Hampshire →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Bow Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Who is behind it A land record, a zoning application or a company's own announcement.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. Filing (source date; the content gives no date of its own)

    Granite Shore Power, owners of closed Merrimack Station in Bow, filed request with Federal Energy Regulatory Commission to enter discussions with Eversource about making a connection to the power grid for a 350 megawatt project

    [5] concordmonitor.com

  2. (source date; the content gives no date of its own)

    A preliminary study will examine the viability of a potential 350 megawatt interconnection associated with Granite Shore Power related to the rumored Bow data center.

    [4] unionleader.com

  3. (source date; the content gives no date of its own)

    Data center would be located next to Merrimack Station power plant

    [3] concordmonitor.com

  4. (source date; the content gives no date of its own)

    Eversource has been in communication with a developer interested in building a data center in Bow

    [3] concordmonitor.com

  5. (source date; the content gives no date of its own)

    The project is proposed at the Merrimack Station, a coal fired power plant that ceased operations in September 2025

    [2] nhtalkradio.com

  6. (source date; the content gives no date of its own)

    Granite Shore Power is exploring a 350 megawatt data center project in Bow

    [2] nhtalkradio.com

  7. (source date; the content gives no date of its own)

    Granite Shore Power owns the 345 acre Merrimack Plant site

    [1] indepthnh.org

  8. (source date; the content gives no date of its own)

    Merrimack Station, a coal fired power plant, ceased operations in September 2025 and was due for retirement in 2028

    [1] indepthnh.org

2 earlier entries
  1. Filing (source date; the content gives no date of its own)

    Eversource and Granite Shore Power filed an application to the Federal Energy Regulatory Committee for a viability study for an up to 350 megawatt interconnection at the Merrimack Station coal plant

    [1] indepthnh.org

  2. · reported (source date; the content gives no date of its own)

    An unnamed town official in Bow confirmed there were high level discussions with a company about bringing a 350 megawatt data center to the town

    [1] indepthnh.org

Every event in order

16 corrections to this record

Every correction, with its reason
  1. · Citation

    Cites the later report of the same claim by the same speaker (said again on September 5, 2026; the record's rules, October 10, 2026).

  2. · Citation

    Cites the later report of the same claim by the same speaker (said again on September 5, 2026; the record's rules, October 10, 2026).

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  4. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  5. · Source tier

    Tier after resolution (September 21, 2026). The source on file is mainepublic.org, the publisher's own page. The item reached the record through Google News: "data center" Maine, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 1 row of monitoring_sources. The speaker, the claim, the date and the url are unchanged.

  6. · Source tier

    Tier after resolution (September 21, 2026). The source on file is mainepublic.org, the publisher's own page. The item reached the record through Google News: "data center" Maine, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 1 row of monitoring_sources. The speaker, the claim, the date and the url are unchanged.

  7. · Source tier

    Tier after resolution (September 21, 2026). The source on file is mainepublic.org, the publisher's own page. The item reached the record through Google News: "data center" Maine, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 1 row of monitoring_sources. The speaker, the claim, the date and the url are unchanged.

Every correction on the record is on the corrections page.

Nearest data centers in New Hampshire

Verified data center records in New Hampshire within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Bow Data Center (350 MW) Bow, Merrimack County Less than 1 mi Proposed
FirstLight Bedford Colocation Data Center (8 Commerce Drive) Bedford, Hillsborough County ~18 mi Running FirstLight Fiber
Nottingham Data Center (unnamed developer) Nottingham, Rockingham County ~28 mi Proposed Thomas Moulton
Liberty Mutual Data Center Portsmouth, Rockingham County ~39 mi Running Liberty Mutual Insurance
Dartmouth College Data Center Lebanon, Grafton County ~47 mi Running Dartmouth College

Blank cell: not disclosed by any source on file.

Common questions about Bow Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Bow Data Center?

Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.

How much power and water does Bow Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Bow Data Center stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Politicians Pile On Calls for Moratorium as Data Centers Talks In Bow Confirmed - InDepthNH.org (opens in a new tab), InDepthNH.org, September 2, 2026, local outlet
  2. September 5, 2026 New England News Roundup - WKXL (opens in a new tab), WKXL, September 5, 2026, news outlet
  3. Rates and Rights: Don’t panic about that data center in Bow (opens in a new tab), Concord Monitor, September 10, 2026, local outlet
  4. Michael Vose & Glen Lyons: We have a better alternative to a data center moratorium - UnionLeader.com (opens in a new tab), UnionLeader.com, September 16, 2026, local outlet
  5. Letter: Voice your opposition to Bow data center (opens in a new tab), Concord Monitor, September 24, 2026, local outlet
  6. In New Hampshire, Democrats and Re­pub­licans fight over who is more anti-data center - Spectrum News (opens in a new tab), Spectrum News, September 8, 2026, local outlet
  7. Tax relief or environmental threat? Bow residents divided over possible data center - concordmonitor.com (opens in a new tab), concordmonitor.com, September 4, 2026, local outlet
  8. Ayotte opposes potential Bow data center, plans to propose statewide moratorium - mainepublic.org (opens in a new tab), mainepublic.org, September 2, 2026, local outlet

8 sources on file.

Regional grid context

This site is in the NPCC New England (NEWE) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Bow Data Center", https://datacenterrecord.org/projects/bow-data-center-nh, last verified September 24, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Bow Data Center", https://datacenterrecord.org/projects/bow-data-center-nh. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
43.20667, -71.53806
How the location is known
Location is the county seat; exact site not disclosed.
Location source
County seat (Concord), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location last verified
September 16, 2026
Published
September 5, 2026
Last verified
September 24, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows