Data Center Record.

Reported Built from one source

Bow Data Center

Bow residents are divided over a possible data center, with debate centering on tax relief benefits versus environmental concerns. It is reported, as reported September 2, 2026.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 8 sources, 0 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
Not disclosed
Water
Not disclosed
Who leads it
Not disclosed
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Not disclosed
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Who is behind itA land record, a zoning application or a company's own announcement.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What happened

  1. (source date; the content gives no date of its own)

    Granite Shore Power, owners of closed Merrimack Station in Bow, filed request with Federal Energy Regulatory Commission to enter discussions with Eversource about making a connection to the power grid for a 350 megawatt project [5]

  2. (source date; the content gives no date of its own)

    A preliminary study will examine the viability of a potential 350 megawatt interconnection associated with Granite Shore Power related to the rumored Bow data center. [4]

  3. (source date; the content gives no date of its own)

    Data center would be located next to Merrimack Station power plant [3]

  4. (source date; the content gives no date of its own)

    Eversource has been in communication with a developer interested in building a data center in Bow [3]

  5. (source date; the content gives no date of its own)

    The project is proposed at the Merrimack Station, a coal fired power plant that ceased operations in September 2025 [2]

  6. (source date; the content gives no date of its own)

    Granite Shore Power is exploring a 350 megawatt data center project in Bow [2]

  7. (source date; the content gives no date of its own)

    Granite Shore Power owns the 345 acre Merrimack Plant site [1]

  8. (source date; the content gives no date of its own)

    Merrimack Station, a coal fired power plant, ceased operations in September 2025 and was due for retirement in 2028 [1]

2 earlier entries
  1. (source date; the content gives no date of its own)

    Eversource and Granite Shore Power filed an application to the Federal Energy Regulatory Committee for a viability study for an up to 350 megawatt interconnection at the Merrimack Station coal plant [1]

  2. · reported (source date; the content gives no date of its own)

    An unnamed town official in Bow confirmed there were high level discussions with a company about bringing a 350 megawatt data center to the town [1]

The full Bow Data Center timeline, in order

10 corrections to this record

Every correction, with its reason
  1. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  2. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  3. · the kind of source of a history entry

    Tier after resolution (2026-09-21). The source on file is spectrumnews1.com, the publisher's own page. The item reached the record through Google News: "data center" New Hampshire, which the record carries at tier 1, and the approve copied the feed's tier onto this row, from the wrapper https://news.google.com/rss/articles/CBMipgFBVV95cUxQSmxUM3ljc2lyVjE1d2lwc1BWWXh1MkFvdkUtNGUtcFRuQ2p5U05nRmlDYWVheEt3YUp0SFdWUGUwdWFRUXZldzVXSHZGekRwTmk1T1Z5QTZmRzBMc3JQMGttbG85TWVuVlVleU5hRlhEWVFoMTNzU3lsV1ZSTTJUd1VDdEZsaUNfZ0ZxSzFoSUhybElyc1ZlUlVONWx5RF9HYTNPQUln. The tier now comes from the outlet, which the record already carries at tier 4 on 2 rows of sources. DECISIONS section 7. The speaker, the claim, the date and the url are unchanged. The day's label corrections.

  4. · the kind of source of a history entry

    Tier after resolution (2026-09-21). The source on file is mainepublic.org, the publisher's own page. The item reached the record through Google News: "data center" Maine, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 1 row of monitoring_sources. DECISIONS section 7. The speaker, the claim, the date and the url are unchanged. The day's label corrections.

  5. · the kind of source of a history entry

    Tier after resolution (2026-09-21). The source on file is spectrumnews1.com, the publisher's own page. The item reached the record through Google News: "data center" New Hampshire, which the record carries at tier 1, and the approve copied the feed's tier onto this row, from the wrapper https://news.google.com/rss/articles/CBMipgFBVV95cUxQSmxUM3ljc2lyVjE1d2lwc1BWWXh1MkFvdkUtNGUtcFRuQ2p5U05nRmlDYWVheEt3YUp0SFdWUGUwdWFRUXZldzVXSHZGekRwTmk1T1Z5QTZmRzBMc3JQMGttbG85TWVuVlVleU5hRlhEWVFoMTNzU3lsV1ZSTTJUd1VDdEZsaUNfZ0ZxSzFoSUhybElyc1ZlUlVONWx5RF9HYTNPQUln. The tier now comes from the outlet, which the record already carries at tier 4 on 2 rows of sources. DECISIONS section 7. The speaker, the claim, the date and the url are unchanged. The day's label corrections.

  6. · the kind of source of a history entry

    Tier after resolution (2026-09-21). The source on file is spectrumnews1.com, the publisher's own page. The item reached the record through Google News: "data center" New Hampshire, which the record carries at tier 1, and the approve copied the feed's tier onto this row, from the wrapper https://news.google.com/rss/articles/CBMipgFBVV95cUxQSmxUM3ljc2lyVjE1d2lwc1BWWXh1MkFvdkUtNGUtcFRuQ2p5U05nRmlDYWVheEt3YUp0SFdWUGUwdWFRUXZldzVXSHZGekRwTmk1T1Z5QTZmRzBMc3JQMGttbG85TWVuVlVleU5hRlhEWVFoMTNzU3lsV1ZSTTJUd1VDdEZsaUNfZ0ZxSzFoSUhybElyc1ZlUlVONWx5RF9HYTNPQUln. The tier now comes from the outlet, which the record already carries at tier 4 on 2 rows of sources. DECISIONS section 7. The speaker, the claim, the date and the url are unchanged. The day's label corrections.

  7. · the kind of source of a history entry

    Tier after resolution (2026-09-21). The source on file is mainepublic.org, the publisher's own page. The item reached the record through Google News: "data center" Maine, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 1 row of monitoring_sources. DECISIONS section 7. The speaker, the claim, the date and the url are unchanged. The day's label corrections.

  8. · the kind of source of a history entry

    Tier after resolution (2026-09-21). The source on file is spectrumnews1.com, the publisher's own page. The item reached the record through Google News: "data center" New Hampshire, which the record carries at tier 1, and the approve copied the feed's tier onto this row, from the wrapper https://news.google.com/rss/articles/CBMipgFBVV95cUxQSmxUM3ljc2lyVjE1d2lwc1BWWXh1MkFvdkUtNGUtcFRuQ2p5U05nRmlDYWVheEt3YUp0SFdWUGUwdWFRUXZldzVXSHZGekRwTmk1T1Z5QTZmRzBMc3JQMGttbG85TWVuVlVleU5hRlhEWVFoMTNzU3lsV1ZSTTJUd1VDdEZsaUNfZ0ZxSzFoSUhybElyc1ZlUlVONWx5RF9HYTNPQUln. The tier now comes from the outlet, which the record already carries at tier 4 on 2 rows of sources. DECISIONS section 7. The speaker, the claim, the date and the url are unchanged. The day's label corrections.

  9. · the kind of source of a history entry

    Tier after resolution (2026-09-21). The source on file is mainepublic.org, the publisher's own page. The item reached the record through Google News: "data center" Maine, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 1 row of monitoring_sources. DECISIONS section 7. The speaker, the claim, the date and the url are unchanged. The day's label corrections.

  10. · the draft of a status history row

    Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.

Every correction on the record is on the corrections page.

What was said

Michael Vose, former chair of the N.H. House Science, Technology, & Energy Committee and sponsor of HB 672, argues that data centers should provide their own power under House Bill 672 rather than being subject to a state moratorium.
Michael Vose, former N.H. House Science, Technology, & Energy Committee chair · September 16, 2026 · paraphrased · UnionLeader.com local outlet
Eversource spokesman William Hinkle stated Eversource only delivers power, does not generate it, and does not develop data centers, and is obligated to respond to all proposals from developers
William Hinkle, Eversource spokesman · September 2, 2026 · paraphrased · InDepthNH.org local outlet

Every statement about data centers in New Hampshire, by speaker

9 more statements on this page

Sam Hayden, resident of Hopkinton, wrote that construction of hyperscale data center will be detriment to Bow and region because these facilities consume enormous amounts of electricity, provide few permanent jobs, require environmental costs and infrastructure, and risk higher rates

September 24, 2026, Concord Monitor · Concord Monitor local outlet · the record (Paraphrased; said in the source itself)

Pembroke resident

Beth Hamilton Karas stated that a data center at Merrimack Station would impact the region at large and downstream communities

September 23, 2026, Concord Monitor · Concord Monitor local outlet · the record (Paraphrased; said in the source itself)

Governor of New Hampshire

Governor Kelly Ayotte has proposed a statewide data center moratorium, citing insufficient state energy resources.

September 16, 2026, UnionLeader.com · UnionLeader.com local outlet · the record (Paraphrased; said in the source itself)

Executive Councilor, New Hampshire

Executive Councilor Karen Liot Hill called for immediate action on a moratorium, stating that waiting until July 2027 is too late

September 5, 2026, WKXL · WKXL local outlet · the record (Paraphrased; said in the source itself)

Governor of New Hampshire

Gov. Ayotte stated she wants to reduce energy prices and that data centers would raise energy costs

September 5, 2026, WKXL · WKXL local outlet · the record (Paraphrased; said in the source itself)

Selectboard Chair, Bow

Bow Selectboard Chair Kip McDaniel confirmed the town has been having talks with a private business interested in building a data center

September 2, 2026, InDepthNH.org · InDepthNH.org local outlet · the record (Paraphrased; said in the source itself)

Governor of New Hampshire

Gov. Kelly Ayotte said she will be introducing a moratorium against AI data centers in the state's next budget because we do not have the energy for it and she wants to bring electric prices down

September 2, 2026, InDepthNH.org · InDepthNH.org local outlet · the record (Paraphrased; said in the source itself)

Also reported by 1 source: WKXL local outlet

Democratic gubernatorial candidate for New Hampshire

Cinde Warmington, running in Democratic primary for governor, said on Day One she will issue an executive order placing a temporary moratorium on large scale data centers

September 2, 2026, InDepthNH.org · InDepthNH.org local outlet · the record (Paraphrased; said in the source itself)

Also reported by 1 source: WKXL local outlet

Executive Councilor, New Hampshire

Executive Councilor Liot Hill said waiting for a moratorium until the next state budget takes effect in July 2027 is too late and the Governor should use executive authority to put an immediate temporary moratorium in place

September 2, 2026, InDepthNH.org · InDepthNH.org local outlet · the record (Paraphrased; said in the source itself)

The site

Where in Merrimack County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 3 other published records in New Hampshire
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Bow, Merrimack County, New Hampshire
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building Bow Data Center?

Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.

How much power and water does Bow Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

What has Bow or Merrimack County decided about it?

No decision by Bow or Merrimack County about data centers is on the record. The Merrimack County page and the New Hampshire scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Politicians Pile On Calls for Moratorium as Data Centers Talks In Bow Confirmed - InDepthNH.org, InDepthNH.org, September 2, 2026, local outlet
  2. September 5, 2026 New England News Roundup - WKXL, WKXL, September 5, 2026, local outlet
  3. Rates and Rights: Don’t panic about that data center in Bow, Concord Monitor, September 10, 2026, local outlet
  4. Michael Vose & Glen Lyons: We have a better alternative to a data center moratorium - UnionLeader.com, UnionLeader.com, September 16, 2026, local outlet
  5. Letter: Voice your opposition to Bow data center, Concord Monitor, September 24, 2026, local outlet
  6. In New Hampshire, Democrats and Re­pub­licans fight over who is more anti-data center - Spectrum News, Spectrum News, September 8, 2026, local outlet
  7. Tax relief or environmental threat? Bow residents divided over possible data center - concordmonitor.com, concordmonitor.com, September 4, 2026, local outlet
  8. Ayotte opposes potential Bow data center, plans to propose statewide moratorium - mainepublic.org, mainepublic.org, September 2, 2026, local outlet

8 sources on file.

Cite this record

Data Center Record, "Bow Data Center", https://datacenterrecord.org/projects/bow-data-center-nh, last verified September 24, 2026.

Last verified , first recorded . Every correction is logged on the corrections page and under What happened.

Cite this page

Data Center Record, "Bow Data Center", https://datacenterrecord.org/projects/bow-data-center-nh. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
bow-data-center-nh
Status value
rumored
Stage
Proposed
Tier
skeleton
Tags
skeleton
Place id
us/nh/merrimack-county/bow
Coordinates
43.20667, -71.53806
Location precision
county
Location source
County seat (Concord), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location source number
Not disclosed
Location last verified
September 16, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-05
Last verified
2026-09-24