Bow Data Center (350 MW), in order

What happened with this project, oldest first: the stages it reached, what the county and its cities decided, and every dated step on the record. Each entry links its source.

3 events, April 2026 to September 1, 2026. Also on the record, under the month each belongs to: 11 statements and 6 lines that are not events of their own. The facts, newest first: the record; the place: New Hampshire.

A plain date is the day it happened, as the source states it, or as the line's own sentence states it ("voted on July 6"), which is where the line sits even when it was filed later. "Reported" and a date is the day a source published a line that carries no date of its own. Those lines, and lines that describe rather than report an act, sit under their month rather than on the timeline, with what was said and the figures other sources gave. Every timeline on the site reads its lines by this one rule. How dates are read.

Stages

  1. reported

Now: reported. A stage is the record's status after the entry that set it (the definitions).

2026 3 events

  1. (the month its own sentence names; no day is given; filed under Sep 1, 2026)

    Entry

    Granite Shore Power filed request with Federal Energy Regulatory Commission in April 2026 to enter discussions with Eversource about connecting 350 megawatt project to power grid [2]

  2. (the month its own sentence names; no day is given; filed under Sep 2, 2026)

    Entry

    Public Service of New Hampshire, subsidiary of Eversource Energy, filed viability assessment with Granite Shore Power LLC in April 2026 [5]

  3. (source date; the content gives no date of its own)

    reported

    FERC filing shows Granite Shore Power requested viability study for data center project at Merrimack Station site in Bow, filed in April 2026 [1]

  4. Also in September 2026: 11 statements and 6 lines that are not events of their own
    1. (source date; the content gives no date of its own)

      Entry

      Data center would use Merrimack River for cooling water source [2]

    2. (source date; the content gives no date of its own)

      Entry

      Town official confirmed high level discussions between company and Bow about bringing data center to town [2]

    3. (source date; the content gives no date of its own)

      Entry

      Merrimack Station is former coal fired power plant that closed in September 2025 [2]

    4. (said in the source itself)

      Statement · Donald Kreis, New Hampshire Consumer Advocate

      New Hampshire Consumer Advocate Donald Kreis reported developer considering data center project of up to 200 MW for Bow New Hampshire Bulletin local outlet

    5. (said in the source itself)

      Statement · Kelly Ayotte, Governor of New Hampshire

      New Hampshire Governor Kelly Ayotte stated I support a moratorium on data center construction in New Hampshire because too many unknowns surround these facilities New Hampshire Bulletin local outlet

    6. (said in the source itself)

      Statement · Kip McDaniel, Bow Select Board Chairman

      Bow Select Board Chairman Kip McDaniel said data centers can be valued very highly and that in a property tax based state that can be hugely beneficial New Hampshire Bulletin local outlet

    7. (said in the source itself)

      Statement · William Hinkle, Eversource Energy spokesperson

      Eversource Energy spokesperson William Hinkle said the utility is concerned about possible effects of large load data center developments on the grid New Hampshire Bulletin local outlet

    8. (source date; the content gives no date of its own)

      Entry

      Merrimack Station coal fired power plant in Bow set to cease operations in 2028 [5]

    9. (source date; the content gives no date of its own)

      Entry

      Granite Shore Power filed request for 350 megawatt facility interconnection to power grid [5]

    10. (said in the source itself)

      Statement · Donald Kreis, New Hampshire Consumer Advocate

      New Hampshire Consumer Advocate Donald Kreis posted that Eversource had been talking with a data center developer considering Bow location WMUR local outlet

    11. (said in the source itself)

      Statement · William Hinkle, Eversource spokesman

      William Hinkle, Eversource spokesman, said Eversource is obligated by law to respond to all developer proposals and has no role in determining whether projects are allowed to interconnect if they receive required approvals WMUR local outlet

    12. (said in the source itself)

      Statement · Kelly Ayotte, Governor of New Hampshire

      Governor Kelly Ayotte stated in response to Bow proposal that she will advocate for towns to decide what is best for them but thinks it is best to institute a moratorium because too many unknowns surround data centers New Hampshire Bulletin local outlet

    13. (said in the source itself)

      Statement · Granite Shore Power

      Granite Shore Power said no decisions have been made about redevelopment use of nearly 400 acre property WMUR local outlet

    14. (said in the source itself)

      Statement · Kelly Ayotte, Governor

      Governor Kelly Ayotte told News 9 on Wednesday that she will include a data center moratorium in upcoming budget in House Bill 2 WMUR local outlet

    15. (said in the source itself)

      Statement · Kelly Ayotte, Governor of New Hampshire

      New Hampshire Governor Kelly Ayotte stated she supports a moratorium on data center construction in New Hampshire. The Boston Globe local outlet

    16. (source date; the content gives no date of its own)

      Entry

      Granite Shore Power filed a request with the Federal Energy Regulatory Commission to discuss connecting a 350 megawatt project to the regional power grid. [3]

    17. (said in the source itself)

      Statement · Sharon Carson, Senate President

      Senate President Sharon Carson said that the Senate would explore legislation to protect New Hampshire taxpayers from data center development costs. Concord Monitor local outlet

On the timeline: a stage change; an entry that reports an act on the day the source or its own sentence gives; and a decision, a published scorecard event on a row at or under the record's county, that reports an act. Under the months: a statement that names this record, a figure another source gave about it, matched by place and developer, an entry dated only by the day its source was published, and an entry or a decision that describes rather than reports an act. Each is on the record in its own right and keeps its own link.

For researchers
Slug
bow-data-center-350-mw-nh
Status value
rumored
Events on the timeline
3
Under the months
17
Stage changes
1
Decisions
0
Statements
11
Figures
0
Entries and decisions under the months
6