Meta Rosemount Data Center Campus

Street address 14701 Blaine Avenue, Rosemount, MN 55068, Dakota County verified address Exact, at the address [2] EPA ECHO detailed facility report: Jimnist LLC

Overview, regulatory gates and specifications

Meta operates a hyperscale data center campus at 14701 Blaine Avenue in the UMore Park corridor in Rosemount, Dakota County, Minnesota. [1] Filings on the record specify disclosed capacity of 150 MW (the developer's figure), 4 planned or operational buildings. [2] Meta lists Meta Rosemount Data Center at Rosemount, Minnesota on its own page of data center locations, read September 14, 2026. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
EPA air permit on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [2]
150 MW
the developer's figure

Equivalent to ~124,500 U.S. homes (U.S. EIA 830 homes/MW baseline) · 7.2% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
4 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 14701 Blaine Avenue, Rosemount, MN 55068.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
150 MW developer figure Equivalent to the continuous electricity demand of about 124,500 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 1 percent of New York City's summer peak demand in 2024.
[2] echo.epa.gov
Water usage
Not disclosed
Land area
Not disclosed
Buildings
4 buildings operator page
[1] datacenters.atmeta.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2025 (1 year)
Who leads it
Meta as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Meta Rosemount Data Center Campus, capacity: 150 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 150 ÷ 10,245 = 0.01 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Erin Maye Quade

Minnesota state senator · Minnesota

DID Recorded statement at Duluth News Tribune (September 25, 2026)
SAID Sen. Erin Maye Quade said the federal Ratepayer Protection Act is a great first start but does not account for heat islands, water, noise or light pollution (September 25, 2026) inforum.com (opens in a new tab)

Lisa Demuth

Republican gubernatorial candidate · Minnesota

DID Recorded statement at Pioneer Press (September 14, 2026)
SAID Lisa Demuth said she will sign legislation to ban non disclosure agreements with data centers (September 14, 2026) twincities.com (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Meta
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Meta Rosemount Data Center Campus.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 150 MW 150 MW the developer's figure [2] echo.epa.gov
Site Footprint (Acres)
Data Hall Buildings 4 buildings 4 operator page [1] datacenters.atmeta.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

2025 to 2026 hearings
September 29, 2026 Farmington, MN Farmington residents share concerns about proposed data center Farmington City Council 3 clips

The Farmington City Council held a special meeting on September 29, 2026 to review municipal data center zoning ordinances, noise limits, and water usage conditions following community pushback and litigation over the Tract hyperscale campus.

  1. WCCO - CBS Minnesota Broadcast Report Broadcast Report transcribed from local broadcast report
    "proposed 2 and a.5 million square foot data center is playing out. That's about the size of Terminal One at MSP airport. The scale of the project is so big that the term data center doesn't even apply. It is being called a hyperscale data center. As Jonah Kaplan reports, the case could set a precedent for nearly a dozen other projects across Minnesota."
  2. WCCO - CBS Minnesota Broadcast Report Broadcast Report transcribed from local broadcast report
    "remote computer servers in buildings called data centers. Tracked a Denver based development company wants to build a massive technology park to house servers in this space. An abandoned golf course in Farmington and the open fields next to it. Land that was once planned for a new school. You're literally in your backyard. Yep. There's three flags out there at 250 ft from our house. That's or from the property line. That's where the"
  3. Resident public comment Resident Public Comment transcribed from local broadcast report
    "Yep. I don't even have to get to the data center being here. For SHler's neighbors, the issues go deeper. The city of Farmington approved the project after annexing the land from Castle Rock Township and reszoning it. But Castle Rock residents, including Shhatler, sued because they claim the annexing agreement prohibits the city from changing the zoning without their consent if it's not adjacent. Kathy Johnson and Mo Fashami also live"
2019 to 2024 hearings
March 14, 2024 Rosemount, MN Meta to build data center on former University of Minnesota land Rosemount City Council 2 clips

WCCO - CBS Minnesota report on Rosemount City Council and community proceedings in Rosemount, MN: Meta to build data center on former University of Minnesota land (March 14, 2024).

  1. WCCO - CBS Minnesota Broadcast Report Broadcast Report transcribed from local broadcast report
    "City suburb, meta, facebook's company, is coming to Rosemount planning to build a data center along county road 42 that is just east of Dakota County technical college. Wcco's kristen mitchell was at the announcement this morning and has more . Hi, kirsten. Reporter: officials are calling this $800 million investment a significant win for Rosemount and the broader community. This plot of land"
  2. Resident public comment Resident Public Comment transcribed from local broadcast report
    "Grow businesses. This project has been under wraps for years, even had a coding called project bigfoot had some community members express concerns about the secrecy of this project as well as the data center's impact on noise, environment, and electrical usage. Experts say they looked at other data centers and are working with excel to make sure"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (content date)

    Meta deployed AI designed sustainable concrete at its data center construction site in Rosemount, Minnesota

    [4] engineering.fb.com

  2. · Status: running (source date; the content gives no date of its own)

    Meta confirmed $700 million Minnesota data center project

    [3] datacenterdynamics.com

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Meta lists Meta Rosemount Data Center at Rosemount, Minnesota on its own page of data center locations, read September 14, 2026.

    [1] datacenters.atmeta.com

Nearest data centers in Minnesota

Verified data center records in Minnesota within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Oppidan Apple Valley Data Center Campus Apple Valley, Dakota County 7 mi Proposed Oppidan Investment Company 3 buildings
Tract Farmington Technology Park Farmington, Dakota County 8 mi Proposed Tract 8 buildings
DataBank Eagan Data Center (MSP2) Eagan, Dakota County 8 mi Running DataBank 14 MW
Iron Gate Data Centers Eagan Eagan, Dakota County 9 mi Running Iron Gate Data Centers 6 MW
Q'Levr Inver Grove Heights Data Center Campus Inver Grove Heights, Dakota County 10 mi Proposed Q'Levr 4 buildings
DataBank Twin Cities Edina Data Center (MSP1) Minneapolis, Hennepin County 16 mi Running DataBank 15 MW

Blank cell: not disclosed by any source on file.

Common questions about Meta Rosemount Data Center Campus

Answered directly from the verified filings and local actions on this page.

Who is building Meta Rosemount Data Center Campus?

Meta is the developer. No construction contractor is named on the record yet.

How much power and water does Meta Rosemount Data Center Campus say it needs?

Power: 150 MW (the developer's figure, echo.epa.gov (opens in a new tab)). Water: not disclosed by any source on file.

Where does Meta Rosemount Data Center Campus stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Meta: Our U.S. data center fleet (opens in a new tab), Meta, September 14, 2026
  2. EPA ECHO detailed facility report: Jimnist LLC (opens in a new tab), U.S. Environmental Protection Agency

Reporting

  1. Meta confirms it is behind $700 million Minnesota data center project - Data Center Dynamics (opens in a new tab), Data Center Dynamics, September 4, 2023, trade press
  2. Using AI to make lower carbon, faster curing concrete - Engineering at Meta (opens in a new tab), Engineering at Meta, July 16, 2025, social media

4 sources on file.

Regional grid context

This site is in the MRO West (MROW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Meta Rosemount Data Center Campus", https://datacenterrecord.org/projects/meta-rosemount-data-center-mn, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Meta Rosemount Data Center Campus", https://datacenterrecord.org/projects/meta-rosemount-data-center-mn. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
44.73429, -93.054972
How the location is known
Location from the site's street address.
Location source
https://datacenters.atmeta.com/
Coordinate source
MPCA permit and Meta Rosemount campus specification
Location source number
[2]
Location last verified
October 4, 2026
EPA registry id
110071654357
How capacity was disclosed
the developer's figure
Capacity, if disclosed
150 MW, the developer's figure
Published
September 14, 2026
Last verified
November 6, 2026
Not disclosed
Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Meta Rosemount Data Center Campus · 4 sources, 3 entries · basis and source tier on every row · verified November 6, 2026