Data Center Record.

Proposed Built from one source

Tract Farmington Technology Park

Farmington, Dakota County, MNDeveloper: TractCensus GEOID 27037

Stage
Proposed
Buildings
8 buildings
agency filing, verified October 27, 2026
Undisclosed in public filings
Power, Land, Water

Tract filed an Alternative Urban Areawide Review and master plan for a 670 acre, 8 building hyperscale data center park in Farmington, Dakota County, Minnesota. It is proposed, since January 8, 2025.

How much power it needs, how much water it would use and who would use it have not been disclosed.

1 hearing on the record, 2026

Last verified · 1 source, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Proposed, ringed
  • data center
  • Smaller pins: 26 other published records in Minnesota
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Buildings
8 buildings agency filing, verified October 27, 2026
Who leads it
Tract as stated by the source
Undisclosed in public filings
Land, Power it would draw, Water, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Tract as stated by the source October 27, 2026
Who is constructing it
How much land
Buildings 8 buildings agency filing, verified October 27, 2026 farmingtonmn.gov (opens in a new tab) October 27, 2026
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Dakota County and Farmington about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Inver Grove Heights restrictive QLevr filed lawsuit in Dakota County District Court in July 2026 mprnews.org (opens in a new tab)
Inver Grove Heights restrictive One year moratorium approved in June 2026 mprnews.org (opens in a new tab)
Inver Grove Heights restrictive Proposed 55,000 square foot data center on Carmen Avenue East exempted from one year moratorium on September 15, 2026 mprnews.org (opens in a new tab)
Inver Grove Heights restrictive One year moratorium on data center construction approved in June 2026 cbsnews.com (opens in a new tab)
Inver Grove Heights restrictive City Council approves moratorium carve out for QLevr LLC data center on Carmen Avenue East on September 15, 2026 cbsnews.com (opens in a new tab)
Inver Grove Heights restrictive Inver Grove Heights made an exception to their moratorium on data centers to avoid multi million dollar lawsuit audacy.com (opens in a new tab)
3 earlier decisions on the county's rows
DateWhoDecisionSource
Inver Grove Heights restrictive City council voted 3-1 to approve QLevr LLC's project carving it out of the moratorium cbsnews.com (opens in a new tab)
Inver Grove Heights restrictive Inver Grove Heights passed a pause on data centers cbsnews.com (opens in a new tab)
Inver Grove Heights restrictive Inver Grove Heights held a data center vote kare11.com (opens in a new tab)
September 29, 2026 Farmington, MN Farmington residents share concerns about proposed data center Farmington City Council 3clips

The Farmington City Council held a special meeting on September 29, 2026 to review municipal data center zoning ordinances, noise limits, and water usage conditions following community pushback and litigation over the Tract hyperscale campus.

  1. Farmington City Council Applicant and Economic Development Presentation Developer Representative transcribed from the official recording
    "proposed 2 and a.5 million square foot data center is playing out. That's about the size of Terminal One at MSP airport. The scale of the project is so big that the term data center doesn't even apply. It is being called a hyperscale data center. As Jonah Kaplan reports, the case could set a precedent for nearly a dozen other projects across Minnesota."
  2. Farmington City Council Official Deliberation Elected Official transcribed from the official recording
    "remote computer servers in buildings called data centers. Tracked a Denver based development company wants to build a massive technology park to house servers in this space. An abandoned golf course in Farmington and the open fields next to it. Land that was once planned for a new school. >> You're literally in your backyard. >> Yep. There's three flags out there at 250 ft from our house. That's or from the property line. That's where the"
  3. Resident public comment Resident Public Comment transcribed from the official recording
    ">> Yep. I don't even have to get to the data center being here. For SHler's neighbors, the issues go deeper. The city of Farmington approved the project after annexing the land from Castle Rock Township and reszoning it. But Castle Rock residents, including Shhatler, sued because they claim the annexing agreement prohibits the city from changing the zoning without their consent >> if it's not adjacent. >> Kathy Johnson and Mo Fashami also live"
Said and filed

Said and filed

Statements and filings, side by side

Zoning Noise Water Litigation
Column A · Dated Statement
Tract Capital Management & Farmington City Council Majority Developer & Municipal Governing Body
Venue: Farmington Alternative Urban Areawide Review Approval
"Approved the environmental review and initial zoning pathway for the multi billion dollar Tract hyperscale data center campus, asserting existing conditions protected nearby homes."
Column B · Primary Government Record
Dakota County Environmental Litigation & Farmington Special Council Session on Data Center Ordinances
Farmington City Council Special Session (Sept 29, 2026)
Agency or Venue: Farmington City Council & Dakota County District Court
"Following resident litigation challenging the environmental review and groundwater draw, the Farmington City Council convened a special session on September 29, 2026 to overhaul municipal data center noise, setback, and zoning ordinances."
Farmington City Council Special Session

What happened

  1. · Status: proposed (content date)

    Tract plans a second Minnesota data center park outside Minneapolis with estimated water usage of nearly 2.4 million gallons daily at peak use.

    farmingtonmn.gov (opens in a new tab) query feed

The full Tract Farmington Technology Park timeline, in order

The site

The pin is the site's address.

The site map is at the top of the page.

Where
225th Street West and State Highway 3, Farmington, MN 55024, Farmington, Dakota County, Minnesota [source] (opens in a new tab)
How exactly it is located
Exact, at the address
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center

USGS NAIP aerial view of Tract Farmington Technology Park
LAT 44.65916 / LON -93.16870 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is Tract Farmington Technology Park?

The record has one measure of its size: 8 buildings (agency filing, verified October 27, 2026, farmingtonmn.gov (opens in a new tab)). Its power capacity is not disclosed.

Who is building Tract Farmington Technology Park?

Tract is the developer. No construction contractor is named on the record yet.

How much power and water does Tract Farmington Technology Park say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Tract Farmington Technology Park stand today?

It is proposed, since January 8, 2025. The newest entry, January 8, 2025: Tract plans a second Minnesota data center park outside Minneapolis with estimated water usage of nearly 2.4 million gallons daily at peak use.

What has Farmington or Dakota County decided about it?

Inver Grove Heights (rated restrictive): QLevr filed lawsuit in Dakota County District Court in July 2026 (reported September 15, 2026, mprnews.org (opens in a new tab)); and Inver Grove Heights: One year moratorium approved in June 2026 (reported September 15, 2026, mprnews.org (opens in a new tab)). 9 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Minnesota Data Center Debate Turns to Water Consumption - GovTech (opens in a new tab), GovTech, April 11, 2025, query feed

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Tract Farmington Technology Park", https://datacenterrecord.org/projects/tract-farmington-data-center-park-mn, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Tract Farmington Technology Park", https://datacenterrecord.org/projects/tract-farmington-data-center-park-mn. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
44.65916, -93.1687
How the location is known
Location from the site's street address.
Location source
https://www.farmingtonmn.gov/
Coordinate source
City of Farmington AUAR filing parcel
Rating of the county's rows
Restrictive
Published
October 21, 2026
Last verified
October 27, 2026
Undisclosed in public filings
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed

Researcher view · Tract Farmington Technology Park · 1 source, 1 entry, 9 decisions nearby · basis and source tier on every row · verified October 27, 2026