Census GEOID: 27037 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 5 reporting sources

● Proposed Campus Recorded August 10, 2026 · 4 Buildings

Q'Levr Inver Grove Heights Data Center Campus

Street address Rich Valley Boulevard and 117th Street East, Inver Grove Heights, MN 55077, Dakota County verified address Exact, at the address [1] cbsnews.com

Overview, regulatory gates and specifications

Q'Levr filed environmental review plans for a 4 building data center campus along Rich Valley Boulevard in Inver Grove Heights, Dakota County, Minnesota. [1] Site plan application scheduled for consideration later in September 2026 [2]

1. Land & Parcel
Parcel located
2. Local Zoning
Not yet on file
3. Tax & EDA Deal
Incentive review
4. Utility Grid Queue
Not yet on file
5. Air & Water Permits
Not yet on file
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
4 buildings
agency filing

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: Rich Valley Boulevard and 117th Street East, Inver Grove Heights, MN 55077.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
4 buildings operator page
[1] cbsnews.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Q'Levr as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Jason Kuboushek

City Attorney

DID Recorded statement at The Mighty 790 KFGO (September 15, 2026) [1]
SAID City attorney Jason Kuboushek estimates legal risk to city at minimum $20 million, potentially $150 million (September 15, 2026) [1]

Tony Scales

Council Member

DID Recorded statement at MPR News (September 15, 2026) [2]
SAID Tony Scales, Council Member, votes for exemption after supporting initial moratorium (September 15, 2026) [2]

QLevr LLC

legal team

DID Recorded statement at The Mighty 790 KFGO (September 15, 2026) [1]
SAID QLevr LLC threatens lawsuit claiming up to $150 million in damages (September 15, 2026) [1]

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Q'Levr
UTILITIES
Electric utility: Not disclosed

View all 4 statements on the record in Minnesota →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Q'Levr Inver Grove Heights Data Center Campus.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 4 buildings agency filing [1] cbsnews.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

September 29, 2026 Farmington, MN Farmington residents share concerns about proposed data center Farmington City Council 3 clips

The Farmington City Council held a special meeting on September 29, 2026 to review municipal data center zoning ordinances, noise limits, and water usage conditions following community pushback and litigation over the Tract hyperscale campus.

  1. WCCO - CBS Minnesota Broadcast Report Broadcast Report transcribed from local broadcast report
    "proposed 2 and a.5 million square foot data center is playing out. That's about the size of Terminal One at MSP airport. The scale of the project is so big that the term data center doesn't even apply. It is being called a hyperscale data center. As Jonah Kaplan reports, the case could set a precedent for nearly a dozen other projects across Minnesota."
  2. WCCO - CBS Minnesota Broadcast Report Broadcast Report transcribed from local broadcast report
    "remote computer servers in buildings called data centers. Tracked a Denver based development company wants to build a massive technology park to house servers in this space. An abandoned golf course in Farmington and the open fields next to it. Land that was once planned for a new school. You're literally in your backyard. Yep. There's three flags out there at 250 ft from our house. That's or from the property line. That's where the"
  3. Resident public comment Resident Public Comment transcribed from local broadcast report
    "Yep. I don't even have to get to the data center being here. For SHler's neighbors, the issues go deeper. The city of Farmington approved the project after annexing the land from Castle Rock Township and reszoning it. But Castle Rock residents, including Shhatler, sued because they claim the annexing agreement prohibits the city from changing the zoning without their consent if it's not adjacent. Kathy Johnson and Mo Fashami also live"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. Filing (source date; the content gives no date of its own)

    Site plan application scheduled for consideration later in September 2026

    [2] mprnews.org

  2. · Status: proposed (source date; the content gives no date of its own)

    Council to vote on major site plan on September 28, 2026

    [1] cbsnews.com

  3. · Status: stalled or cancelled (content date)

    A data center project in Inver Grove Heights is subject to a lawsuit that could cost taxpayers millions, and a moratorium on data centers was delayed at a contentious city meeting.

    [1] cbsnews.com

Every event in order

3 corrections to this record

Every correction, with its reason
  1. · Site acreage

    The site read 55,000 acres. The source's figure was 55,000 square feet, a floor area, and the approval wrote it as acres. Returned to not disclosed, as it was before.

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Minnesota

Verified data center records in Minnesota within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Meta Rosemount Data Center Campus Rosemount, Dakota County 10 mi Running Meta 150 MW
DataBank Eagan Data Center (MSP2) Eagan, Dakota County 16 mi Running DataBank 14 MW
Tract Farmington Technology Park Farmington, Dakota County 16 mi Proposed Tract 8 buildings
Oppidan Apple Valley Data Center Campus Apple Valley, Dakota County 17 mi Proposed Oppidan Investment Company 3 buildings
Iron Gate Data Centers Eagan Eagan, Dakota County 17 mi Running Iron Gate Data Centers 6 MW
H5 Data Centers Twin Cities (Energy Park) St. Paul, Ramsey County 22 mi Running H5 Data Centers 6 MW

Blank cell: not disclosed by any source on file.

Common questions about Q'Levr Inver Grove Heights Data Center Campus

Answered directly from the verified filings and local actions on this page.

Who is building Q'Levr Inver Grove Heights Data Center Campus?

Q'Levr is the developer. No construction contractor is named on the record yet.

How much power and water does Q'Levr Inver Grove Heights Data Center Campus say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Q'Levr Inver Grove Heights Data Center Campus stand today?

It is proposed, as reported September 15, 2026. The newest entry, reported September 15, 2026: Site plan application scheduled for consideration later in September 2026 [2].

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Inver Grove Heights City Council approves moratorium carve out for proposed data center - The Mighty 790 KFGO (opens in a new tab), The Mighty 790 KFGO, September 15, 2026, national outlet
  2. Inver Grove Heights exempts data center project from city moratorium - MPR News (opens in a new tab), MPR News, September 15, 2026, local outlet
  3. Inver Grove Heights meeting erupts into shouts after data center moratorium delayed - MPR News (opens in a new tab), MPR News, June 23, 2026, local outlet
  4. Inver Grove Heights City Council Approves Moratorium Carve-Out For Proposed Data Center - Patch (opens in a new tab), Patch, September 15, 2026, local outlet
  5. Data center lawsuit could cost Inver Grove Heights taxpayers millions; path to avoid it moves forward - kstp.com (opens in a new tab), kstp.com, August 10, 2026, local outlet

5 sources on file.

Regional grid context

This site is in the MRO West (MROW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Q'Levr Inver Grove Heights Data Center Campus", https://datacenterrecord.org/projects/inver-grove-heights-data-center-mn, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Q'Levr Inver Grove Heights Data Center Campus", https://datacenterrecord.org/projects/inver-grove-heights-data-center-mn. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
44.73525, -92.85265
How the location is known
Location from the site's street address.
Location source
https://www.ighmn.gov/
Coordinate source
City of Inver Grove Heights AUAR parcel
Location last verified
September 16, 2026
Published
September 5, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Q'Levr Inver Grove Heights Data Center Campus · 5 sources, 3 entries · basis and source tier on every row · verified November 6, 2026