Google lists a data center at Armstrong County, Texas and says it is being built. [11] Filings on the record specify a 110 acre site footprint, 6 planned or operational buildings. [14] first buildings expected to be turned over to Google in early 2027 [12]
U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.
Electric utility territory: Goodnight 1 (265.5 MW operational) and Goodnight 2 (265.5 MW under construction) wind farms.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
6 planned or operational data hall buildings.
Location: 9921 Lima Road, Claude, TX 79019.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Google Armstrong County data center.
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | 110 acres | 110 acres | what a permit allows [14] crusoe.ai |
| Data Hall Buildings | 6 buildings | 6 data center buildings permitted under EPA ECHO FRS 110072160729 and Armstrong County Chapter 312 Tax Abatement Agreement (adopted November 12, 2024) for GN DC1, LLC (Project Goodnight / Project Llano) [2] echo.epa.gov | |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Chronological regulatory, corporate and permitting events on the record, newest first.
(source date; the content gives no date of its own)
Construction underway on six building Claude data center hosted by Google and Crusoe.
(source date; the content gives no date of its own)
Google committed to 50 permanent jobs once operational
(source date; the content gives no date of its own)
primary power source will be the nearby Goodnight 1 and 2 wind farms, with ERCOT grid as backup
(source date; the content gives no date of its own)
water recirculates for a period of about 15 years
(source date; the content gives no date of its own)
closed loop cooling system allowing water to continuously circulate
(source date; the content gives no date of its own)
construction expected to wrap up by the end of 2027
(source date; the content gives no date of its own)
first buildings expected to be turned over to Google in early 2027
(source date; the content gives no date of its own)
six building data center campus
(source date; the content gives no date of its own)
Data center project under construction in Claude off Lima Road
· being built (content date)
Groundbreaking was in June 2025 with more than 5,500 skilled laborers on site daily
Read on September 14, 2026 (the day the page was read; it gives no date of its own)
Google lists Google Armstrong County data center at Armstrong County, Texas on its own page of data center locations, read September 14, 2026.
· Building count (Not disclosed to 6 buildings)
Updated to 6 permitted buildings on 110 acres at 9921 Lima Road, Claude per EPA ECHO FRS 110072160729 and Armstrong County Chapter 312 Tax Abatement Agreement for GN DC1, LLC.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier: newschannel10.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.
Every correction on the record is on the corrections page.
Verified data center records in Texas within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Google Pampa data center Pampa, Gray County | 43 mi | Being built | 1 building | |
| QTS Hall County Turkey, Hall County | 48 mi | Being built | QTS Data Centers | 1 building |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Crusoe is the developer, crusoe.ai (opens in a new tab). No construction contractor is named on the record yet.
The named tenant is Google. No promise to the community is on the record.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is being built, since June 1, 2025. The newest entry, reported September 23, 2026: Construction underway on six building Claude data center hosted by Google and Crusoe. [15]
Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.
Official operator or facility campus page verified in 50 state website discovery pass.
15 sources on file.
This site is in the ERCOT All (ERCT) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Google Armstrong County data center. Last verified November 9, 2026. https://datacenterrecord.org/projects/google-armstrong-county-data-center-tx. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Google Armstrong County data center
Data Center Record, "Google Armstrong County data center", https://datacenterrecord.org/projects/google-armstrong-county-data-center-tx. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.