Census GEOID: 48011 Location Precision: permit coordinates Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 2 primary and 13 reporting sources

● Being Built Recorded June 1, 2025 · 6 Buildings

Google Armstrong County data center

Street address 9921 Lima Road, Claude, TX 79019, Armstrong County permit coordinates Exact, the point of the EPA's facility record [2] EPA ECHO detailed facility report: Goodnight Power Plant Project Claude TX

Overview, regulatory gates and specifications

Google lists a data center at Armstrong County, Texas and says it is being built. [11] Filings on the record specify a 110 acre site footprint, 6 planned or operational buildings. [14] first buildings expected to be turned over to Google in early 2027 [12]

1. Land & Parcel
110 acres on file
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Goodnight 1 (265.5 MW operational) and Goodnight 2 (265.5 MW under construction) wind farms
5. Air & Water Permits
EPA ECHO Facility Registry R
What happens next: Campus is under construction; building inspections, utility energization and air permits are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Electric utility territory: Goodnight 1 (265.5 MW operational) and Goodnight 2 (265.5 MW under construction) wind farms.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [14]
110 acres
what a permit allows

6 planned or operational data hall buildings.

Location: 9921 Lima Road, Claude, TX 79019.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed Reported by others: 600,000 gallons per day (NewsChannel 10 (opens in a new tab)); 275,000 gallons per day (NewsChannel 10 (opens in a new tab)). Their figure, not the record's.
Land area
110 acres permitted
[14] crusoe.ai
Buildings
6 buildings permitted
[2] echo.epa.gov
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Crusoe attributed via corporate HQ or property filing
[14] crusoe.ai
Who would use it
Google as the source names them
[14] crusoe.ai
Where its power comes from
Goodnight 1 (265.5 MW operational) and Goodnight 2 (265.5 MW under construction) wind farms as stated by the source
[14] crusoe.ai
Permitted legal entity
GN DC1, LLC (Crusoe Energy Systems LLC / Google LLC) what a permit allows
[2] echo.epa.gov
State air permit registration
FRS 110072160729, TXR1529XT state air permit register
State permit status
EPA ECHO Facility Registry Record FRS 110072160729 and TCEQ Construction Stormwater General Permit TXR1529XT (9921 Lima Road, Claude, TX 79019) and Armstrong County Chapter 312 Tax Abatement Agreement (GN DC1, LLC, adopted November 12, 2024) the state's permit register, last verified November 9, 2026
[2] echo.epa.gov
Official project website
datacenters.google (opens in a new tab) verified October 28, 2026
datacenters.google (opens in a new tab)
Archived promotional websites
datacenters.google (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Crusoe · Applicant / Shell LLC: GN DC1, LLC
UTILITIES
Electric utility: Goodnight 1 (265.5 MW operational) and Goodnight 2 (265.5 MW under construction) wind farms

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Google Armstrong County data center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres) 110 acres 110 acres what a permit allows [14] crusoe.ai
Data Hall Buildings 6 buildings 6 data center buildings permitted under EPA ECHO FRS 110072160729 and Armstrong County Chapter 312 Tax Abatement Agreement (adopted November 12, 2024) for GN DC1, LLC (Project Goodnight / Project Llano) [2] echo.epa.gov
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    Construction underway on six building Claude data center hosted by Google and Crusoe.

    [15] newschannel10.com

  2. (source date; the content gives no date of its own)

    Google committed to 50 permanent jobs once operational

    [12] newschannel10.com

  3. (source date; the content gives no date of its own)

    primary power source will be the nearby Goodnight 1 and 2 wind farms, with ERCOT grid as backup

    [12] newschannel10.com

  4. (source date; the content gives no date of its own)

    water recirculates for a period of about 15 years

    [12] newschannel10.com

  5. (source date; the content gives no date of its own)

    closed loop cooling system allowing water to continuously circulate

    [12] newschannel10.com

  6. (source date; the content gives no date of its own)

    construction expected to wrap up by the end of 2027

    [12] newschannel10.com

  7. (source date; the content gives no date of its own)

    first buildings expected to be turned over to Google in early 2027

    [12] newschannel10.com

  8. (source date; the content gives no date of its own)

    six building data center campus

    [12] newschannel10.com

2 earlier entries
  1. (source date; the content gives no date of its own)

    Data center project under construction in Claude off Lima Road

    [13] newschannel10.com

  2. · being built (content date)

    Groundbreaking was in June 2025 with more than 5,500 skilled laborers on site daily

    [14] crusoe.ai

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Google lists Google Armstrong County data center at Armstrong County, Texas on its own page of data center locations, read September 14, 2026.

    [1] datacenters.google

3 corrections to this record

Every correction, with its reason
  1. · Building count (Not disclosed to 6 buildings)

    Updated to 6 permitted buildings on 110 acres at 9921 Lima Road, Claude per EPA ECHO FRS 110072160729 and Armstrong County Chapter 312 Tax Abatement Agreement for GN DC1, LLC.

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier: newschannel10.com is a news outlet (tiered by kind, the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Texas

Verified data center records in Texas within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Google Pampa data center Pampa, Gray County 43 mi Being built Google 1 building
QTS Hall County Turkey, Hall County 48 mi Being built QTS Data Centers 1 building

Blank cell: not disclosed by any source on file.

Comparisons

3 metrics with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Permanent jobs

1 figure, 1 source
7,500 employees Reported

NewsChannel 10, Sep 23, 2026

Show each source's words
  • 7,500 employees, NewsChannel 10: more than 7,500 employees and craft workers currently working at the site

Water a day

2 figures, 1 source
600,000 gallons per day Reported

NewsChannel 10, Sep 23, 2026

275,000 gallons per day Reported

NewsChannel 10, Sep 23, 2026

Show each source's words
  • 600,000 gallons per day, NewsChannel 10: water use averages about 600,000 gallons per day during early earthwork and concrete foundation work
  • 275,000 gallons per day, NewsChannel 10: water use expected to decline to about 275,000 gallons per day as buildings are enclosed

Tax each year

1 figure, 1 source
850,000,000 USD Reported

NewsChannel 10, Sep 23, 2026

Show each source's words
  • 850,000,000 USD, NewsChannel 10: Project Llano could generate more than $850 million in local tax revenue over the life of the project, averaging about $28 million per year

Common questions about Google Armstrong County data center

Answered directly from the verified filings and local actions on this page.

Who is building Google Armstrong County data center?

Crusoe is the developer, crusoe.ai (opens in a new tab). No construction contractor is named on the record yet.

Who will use Google Armstrong County data center?

The named tenant is Google. No promise to the community is on the record.

How much power and water does Google Armstrong County data center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Google Armstrong County data center stand today?

It is being built, since June 1, 2025. The newest entry, reported September 23, 2026: Construction underway on six building Claude data center hosted by Google and Crusoe. [15]

What is still unknown about Google Armstrong County data center?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Google: Data center locations (opens in a new tab), Google, September 14, 2026
  2. EPA ECHO detailed facility report: Goodnight Power Plant Project Claude TX (opens in a new tab), U.S. Environmental Protection Agency

Reporting

  1. ‘We've proudly called Texas home for 15 years’, says Google CEO Sundar Pichai announcing $40 billion inve - The Times of India (opens in a new tab), The Times of India, November 19, 2025, international outlet
  2. Google taps Texas for $40B AI investment to run through 2027 - dallasnews.com (opens in a new tab), dallasnews.com, November 14, 2025, local outlet
  3. Google to invest $40 billion in Texas through 2027 - cnbc.com (opens in a new tab), cnbc.com, November 14, 2025, national outlet
  4. Google plans to invest $40 billion towards building data centers in Texas - Engadget (opens in a new tab), Engadget, November 16, 2025, news outlet
  5. Google unveils $40 billion investment in Texas, with expansion in Ellis County - WFAA (opens in a new tab), WFAA, November 14, 2025, local outlet
  6. Google Announces $40 Billion Texas Data Center Investment to Expand Cloud and AI Infrastructure - MLQ.ai (opens in a new tab), MLQ.ai, November 15, 2025, news outlet
  7. Google is spending $40 billion to build 3 new data centers in Texas - Fast Company (opens in a new tab), Fast Company, November 21, 2025, national outlet
  8. Google Earmarks $40B for Texas Digital Development - CommercialSearch (opens in a new tab), CommercialSearch, November 19, 2025, news outlet
  9. Google commits $40B to 3 new data centers, infrastructure in Texas through 2027 - Community Impact (opens in a new tab), Community Impact, November 14, 2025, local outlet
  10. Construction underway on six building Claude data center - NewsChannel 10 (opens in a new tab), NewsChannel 10, September 23, 2026, local outlet
  11. Crusoe, Google to host community open house about Claude data center project - KFDA | NewsChannel 10 | Amarillo Texas (opens in a new tab), KFDA | NewsChannel 10 | Amarillo Texas, September 13, 2026, local outlet
  12. Crusoe Develops Google AI Data Center Campus in Armstrong County, TX - Crusoe (opens in a new tab), Crusoe, September 28, 2026, news outlet
1 more source
  1. Photos: Construction underway on six building Claude data center - NewsChannel 10 (opens in a new tab), NewsChannel 10, September 23, 2026, local outlet

15 sources on file.

Regional grid context

This site is in the ERCOT All (ERCT) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Google Armstrong County data center", https://datacenterrecord.org/projects/google-armstrong-county-data-center-tx, last verified November 9, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Google Armstrong County data center", https://datacenterrecord.org/projects/google-armstrong-county-data-center-tx. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
35.016961, -101.319614
How the location is known
Location from an EPA facility record.
Location source
EPA ECHO Detailed Facility Report (FRS ID 110072160729) for Goodnight Power Plant Project at 9921 Lima Road, Claude, Armstrong County, Texas.
Coordinate source
EPA ECHO FRS ID 110072160729
Location last verified
September 16, 2026
How acreage was disclosed
what a permit allows
Published
September 14, 2026
Last verified
November 9, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Google Armstrong County data center · 15 sources, 11 entries · basis and source tier on every row · verified November 9, 2026

Download CSV JSON