{
  "license": "CC BY 4.0",
  "license_url": "https://creativecommons.org/licenses/by/4.0/",
  "attribution": "Data: Data Center Record, datacenterrecord.org, CC BY 4.0. Link to the specific record page where possible.",
  "source": "https://datacenterrecord.org/projects/google-armstrong-county-data-center-tx",
  "retrieved_at": "2026-10-07T17:49:59.207Z",
  "count": 1,
  "projects": [
    {
      "slug": "google-armstrong-county-data-center-tx",
      "name": "Google Armstrong County data center",
      "summary": "Google lists a data center at Armstrong County, Texas and says it is being built.",
      "state": "TX",
      "city": null,
      "county": "Armstrong County",
      "status": "under_construction",
      "developer": "Crusoe",
      "capacity_mw": null,
      "latitude": 35.1075,
      "longitude": -101.364,
      "location_precision": "county",
      "location_source": "County seat (Claude), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-06",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.crusoe.ai/resources/newsroom/crusoe-developing-data-center-campus-in-armstrong-county-texas",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": "Goodnight 1 (265.5 MW operational) and Goodnight 2 (265.5 MW under construction) wind farms",
      "power_source_url": "https://www.crusoe.ai/resources/newsroom/crusoe-developing-data-center-campus-in-armstrong-county-texas",
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "record_url": "https://datacenterrecord.org/projects/google-armstrong-county-data-center-tx",
      "sources": [
        {
          "title": "‘We've proudly called Texas home for 15 years’, says Google CEO Sundar Pichai announcing $40 billion inve - The Times of India",
          "url": "https://timesofindia.indiatimes.com/technology/tech-news/weve-proudly-called-texas-home-for-15-years-says-google-ceo-sundar-pichai-announcing-40-billion-investment-in-texas/articleshow/125340570.cms",
          "publisher": "The Times of India",
          "date": "2025-11-19",
          "source_tier": 1
        },
        {
          "title": "Google taps Texas for $40B AI investment to run through 2027 - dallasnews.com",
          "url": "https://www.dallasnews.com/business/technology/2025/11/14/google-taps-texas-for-40b-ai-investment-to-run-through-2027/",
          "publisher": "dallasnews.com",
          "date": "2025-11-14",
          "source_tier": 1
        },
        {
          "title": "Google to invest $40 billion in Texas through 2027 - cnbc.com",
          "url": "https://www.cnbc.com/2025/11/14/google-to-invest-40-billion-in-texas-through-2027.html",
          "publisher": "cnbc.com",
          "date": "2025-11-14",
          "source_tier": 1
        },
        {
          "title": "Google plans to invest $40 billion towards building data centers in Texas - Engadget",
          "url": "https://www.engadget.com/big-tech/google-plans-to-invest-40-billion-towards-building-data-centers-in-texas-183056066.html",
          "publisher": "Engadget",
          "date": "2025-11-16",
          "source_tier": 1
        },
        {
          "title": "Google unveils $40 billion investment in Texas, with expansion in Ellis County - WFAA",
          "url": "https://www.wfaa.com/article/money/business/google-40-billion-investment-in-texas-ellis-county/287-0bf6e355-b350-4c46-b706-6745e7cb7358",
          "publisher": "WFAA",
          "date": "2025-11-14",
          "source_tier": 1
        },
        {
          "title": "Google Announces $40 Billion Texas Data Center Investment to Expand Cloud and AI Infrastructure - MLQ.ai",
          "url": "https://mlq.ai/news/google-announces-40-billion-texas-data-center-investment-to-expand-cloud-and-ai-infrastructure/",
          "publisher": "MLQ.ai",
          "date": "2025-11-15",
          "source_tier": 1
        },
        {
          "title": "Google is spending $40 billion to build 3 new data centers in Texas - Fast Company",
          "url": "https://www.fastcompany.com/91446624/google-data-center-texas-greg-abbott-sundar-pichai",
          "publisher": "Fast Company",
          "date": "2025-11-21",
          "source_tier": 1
        },
        {
          "title": "Google Earmarks $40B for Texas Digital Development - CommercialSearch",
          "url": "https://www.commercialsearch.com/news/google-earmarks-40b-for-texas-digital-development/",
          "publisher": "CommercialSearch",
          "date": "2025-11-19",
          "source_tier": 1
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Google commits $40B to 3 new data centers, infrastructure in Texas through 2027 - Community Impact",
          "url": "https://communityimpact.com/mckinney/austin/google-commits-40b-to-3-new-data-centers-infrastructure-in-texas-through-2027/",
          "publisher": "Community Impact",
          "date": "2025-11-14",
          "source_tier": 4
        },
        {
          "title": "Construction underway on six building Claude data center - NewsChannel 10",
          "url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "publisher": "NewsChannel 10",
          "date": "2026-09-23",
          "source_tier": 4
        },
        {
          "title": "Crusoe Develops Google AI Data Center Campus in Armstrong County, TX - Crusoe",
          "url": "https://www.crusoe.ai/resources/newsroom/crusoe-developing-data-center-campus-in-armstrong-county-texas",
          "publisher": "Crusoe",
          "date": "2026-09-28",
          "source_tier": 4
        },
        {
          "title": "Photos: Construction underway on six building Claude data center - NewsChannel 10",
          "url": "https://www.newschannel10.com/gallery/2026/09/23/photos-construction-underway-six-building-claude-data-center/",
          "publisher": "NewsChannel 10",
          "date": "2026-09-23",
          "source_tier": 4
        },
        {
          "title": "Crusoe, Google to host community open house about Claude data center project - KFDA | NewsChannel 10 | Amarillo Texas",
          "url": "https://www.newschannel10.com/2026/09/13/crusoe-google-host-community-open-house-about-claude-data-center-project/",
          "publisher": "KFDA | NewsChannel 10 | Amarillo Texas",
          "date": "2026-09-13",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [
          "Google"
        ],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": "https://www.crusoe.ai/resources/newsroom/crusoe-developing-data-center-campus-in-armstrong-county-texas"
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "Google committed to 50 permanent jobs once operational",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "Construction underway on six building Claude data center hosted by Google and Crusoe.",
          "source_url": "https://www.newschannel10.com/gallery/2026/09/23/photos-construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "six building data center campus",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "first buildings expected to be turned over to Google in early 2027",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "construction expected to wrap up by the end of 2027",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "closed loop cooling system allowing water to continuously circulate",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "water recirculates for a period of about 15 years",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "primary power source will be the nearby Goodnight 1 and 2 wind farms, with ERCOT grid as backup",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Armstrong County data center at Armstrong County, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-13",
          "summary": "Data center project under construction in Claude off Lima Road",
          "source_url": "https://www.newschannel10.com/2026/09/13/crusoe-google-host-community-open-house-about-claude-data-center-project/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-06-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-28",
          "summary": "Groundbreaking was in June 2025 with more than 5,500 skilled laborers on site daily",
          "source_url": "https://www.crusoe.ai/resources/newsroom/crusoe-developing-data-center-campus-in-armstrong-county-texas",
          "source_tier": 4
        }
      ]
    }
  ]
}
