Proposed four building data center campus on 315 acres at 1615 East County Road 200 North and adjacent parcels on the northeast side of Kokomo, Howard County, Indiana, with $1 billion to $3 billion in stated capital investment, closed loop non evaporative cooling, 0% local property tax abatement and $44 million to $55 million in projected annual property tax revenue. [1] Filings on the record specify disclosed capacity of 1 GW (the developer's figure). [1] Kokomo Mayor Tyler Moore and Digital Realty confirmed plans for the Digital Realty Kokomo Campus on 476 acres at Industrial Park North near U.S. 31 and County Road 400 North, comprising 3 buildings totaling about 3 million square feet and about 1,000 MW of IT capacity, with closed loop air cooled chillers, no property tax abatement and full completion targeted for 2033. [4]
Equivalent to ~830,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 48% of Hoover Dam nameplate capacity (2,080 MW).
Electric utility: Duke Energy Indiana (about 1,500 MW full campus draw for 1,000 MW IT capacity).
Cooling system: Closed loop liquid (Closed loop, air cooled chiller system recirculating water; Indiana American Water system). Closed loop chillers recirculate fluid rather than evaporating continuous potable water.
0% property tax abatement ($44M to $55M/yr projected property tax revenue; $1B to $3B capex).
3 planned or operational data hall buildings.
Location: Industrial Park North near US 31 and County Road 400 North, Kokomo, Howard County, IN 46901.
Permanent operational headcount not yet disclosed on the record.
0% property tax abatement ($44M to $55M/yr projected property tax revenue; $1B to $3B capex).
Sources:
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
At a time when SEA 1 has put local governments across Indiana under tremendous budget pressure, this investment puts Kokomo in the driver's seat.(October 5, 2026) [4]
Whether we argue that the setbacks are far enough, 10 times farther is better than where we are today, and we can always adjust this in the future.(September 14, 2026) [6]
I prefer to see these projects come forward individually for both annexation and rezoning, so they would come before this council one at a time. Once they're out of here, and you guys all know this, they'll never come back before us unless there's an abatement.(March 9, 2026) [5]
View all 4 statements on the record in Indiana →
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Digital Realty Kokomo Campus.
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | 1 GW | the developer's figure [1] digitalrealty.com | |
| Site Footprint (Acres) | 476 acres | 476 acres | the developer's figure [4] inkfreenews.com |
| Data Hall Buildings | 3 buildings | company [4] inkfreenews.com | |
| Cooling & Water System | Closed loop liquid | Closed loop, air cooled chiller system recirculating water; Indiana American Water system | Company / permit specification [4] inkfreenews.com |
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue | 0% abatement ($1B to $3B capex) | City of Kokomo TIF announcement [4] inkfreenews.com |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Chronological regulatory, corporate and permitting events on the record, newest first.
(content date)
Kokomo Mayor Tyler Moore and Digital Realty confirmed plans for the Digital Realty Kokomo Campus on 476 acres at Industrial Park North near U.S. 31 and County Road 400 North, comprising 3 buildings totaling about 3 million square feet and about 1,000 MW of IT capacity, with closed loop air cooled chillers, no property tax abatement and full completion targeted for 2033.
Moratorium adopted (content date)
The Howard County Board of Commissioners adopted Ordinance No. 2026 BCCO 33 establishing a one year moratorium on data centers in unincorporated Howard County, while the annexed Industrial Park North site remained under City of Kokomo jurisdiction.
(content date)
The Kokomo Common Council data center zoning ordinance (September 14, 2026) adding Section 6.75 DC 01 Data Center Standards passed with one dissenting vote (Councilmember Bob Stephenson); reported as 8 to 1 by the Kokomo Lantern and 7 to 1 by WRTV, setting a 350 foot separation from existing residences, a 200 foot setback from residential districts, a 50 dBA residential property line sound limit and a master site plan requirement.
· Status: proposed (content date)
Proposed: the city is considering a data center ordinance or code amendment, with no application in a project's name on file yet.
· Status: permitting (content date)
Eleven residents spoke against the proposed data center zoning ordinance during public comment before the Kokomo Common Council, citing utility use and quality of life impacts.
(content date)
The Kokomo Common Council advanced a municipal data center zoning ordinance on first reading by a 6 to 2 vote after declining a proposed moratorium.
wishtv.com (opens in a new tab) local outlet
· Status: proposed (content date)
The Kokomo Common Council voted 8 to 1 (with Councilmember Bob Stephenson dissenting) to annex and rezone roughly 700 acres on the northeast side of Kokomo near U.S. 31 and County Road 400 North for Industrial Park North.
Replaced internal reference in status_history summary with plain reader prose.
Replace editorializing phrase 'despite public opposition' with attributed public comment facts from the hearing record.
Align duplicate March 9, 2026 annexation entry 5343 with entry 5352 so historyRows deduplicates them.
Align duplicate September 14, 2026 ordinance entry 5345 with entry 5351 so historyRows deduplicates them.
Use Kokomo Common Council data center zoning ordinance (September 14, 2026) label per source verification.
Use Howard County Board of Commissioners one year data center moratorium (September 2026) label per source verification.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
Every correction on the record is on the corrections page.
Verified data center records in Indiana within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| DataOne Frankfort data center Frankfort, Clinton County | 29 mi | Proposed | DataOne | 4 buildings |
| Meta Lebanon data center Lebanon, Boone County | 39 mi | Being built | Meta | 1 GW |
| Expedient Indianapolis Data Center (Carmel) Carmel, Hamilton County | 40 mi | Running | Expedient | 4 MW |
| Metrobloks Indianapolis Data Center Indianapolis, Marion County | 51 mi | Proposed | Metrobloks | 45 MW |
| Lifeline Data Centers Indianapolis Eastgate Indianapolis, Marion County | 53 mi | Running | Lifeline Data Centers | 10 MW |
| DC Blox Irvington data center campus Indianapolis, Marion County | 54 mi | Proposed | DC Blox | 60 MW |
Blank cell: not disclosed by any source on file.
| Building | Address | Status | Source |
|---|---|---|---|
| Building 1 | Industrial Park North (North 50 East and County Road 450 North, near US 31), Kokomo, Howard County, IN 46901 | proposed | insideindianabusiness.com (opens in a new tab) |
| Building 2 | Industrial Park North (North 50 East and County Road 450 North, near US 31), Kokomo, Howard County, IN 46901 | proposed | insideindianabusiness.com (opens in a new tab) |
| Building 3 | Industrial Park North (North 50 East and County Road 450 North, near US 31), Kokomo, Howard County, IN 46901 | proposed | insideindianabusiness.com (opens in a new tab) |
Blank cell: not disclosed by any source on file.
3 buildings named on this site (how buildings are counted).
Answered directly from the verified filings and local actions on this page.
Digital Realty is the developer, digitalrealty.com (opens in a new tab). No construction contractor is named on the record yet.
Power: 1 GW (the developer's figure, digitalrealty.com (opens in a new tab)). Water: not disclosed by any source on file.
It is proposed, since August 31, 2026. The newest entry, October 5, 2026: Kokomo Mayor Tyler Moore and Digital Realty confirmed plans for the Digital Realty Kokomo Campus on 476 acres at Industrial Park North near U.S. 31 and County Road 400 North, comprising 3 buildings totaling about 3 million square feet and about 1,000 MW of IT capacity, with closed loop air cooled chillers, no property tax abatement and full completion targeted for 2033. [4]
Official Digital Realty project page for the Industrial Park North campus in Kokomo, Indiana.
7 sources on file.
This site is in the RFC West (RFCW) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Digital Realty Kokomo Campus. Last verified November 7, 2026. https://datacenterrecord.org/projects/kokomo-data-center-in. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Digital Realty Kokomo Campus
Data Center Record, "Digital Realty Kokomo Campus", https://datacenterrecord.org/projects/kokomo-data-center-in. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.