Data Center Record.

Proposed Reviewed in depth

4-3 Salem Township Data Center

Salem Township, Luzerne County, PADeveloper: 4-3 Glen Brook GroupCensus GEOID 42079

Stage
Proposed
Power
3.5 GW
the developer's figure
Land
4,466 acres
what a permit allows
Undisclosed in public filings
Buildings, Water

The 4-3 Glen Brook Group proposed a 39 building data center campus spanning 4,466 acres across 279 properties in Salem Township, Luzerne County, Pennsylvania, with projected power demand of 3.5 to 4 gigawatts. In August 2026, a Luzerne County Court of Common Pleas judge ordered Salem Township to redo its July 23, 2026 zoning hearing after residents were locked out of the municipal building. It is proposed; the record holds no sourced date for when it reached that stage.

How much water it would use and who would use it have not been disclosed.

Last verified · 3 sources, 2 primary · Reviewed by a person, every entry sourced. · How to read this page

  • This record: Proposed, ringed
  • data center
  • Smaller pins: 78 other published records in Pennsylvania
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
4,466 acres what a permit allows
[2] luzernecounty.org
Power it would draw
3.5 GW the developer's figure About 0.34 times New York City's summer peak demand in 2024.
[2] luzernecounty.org
Who leads it
4-3 Glen Brook Group as stated by the source
[1] gis.dep.pa.gov
State permit status
Proposed, no permit applications received the state's permit register, as of October 7, 2026, last verified October 23, 2026
[1] gis.dep.pa.gov
Undisclosed in public filings
Buildings, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. 4-3 Salem Township Data Center, capacity: 3,500 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 3,500 ÷ 10,245 = 0.34 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 3.5 GW the developer's figure [2] luzernecounty.org (opens in a new tab) October 23, 2026
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it 4-3 Glen Brook Group as stated by the source [1] gis.dep.pa.gov (opens in a new tab) October 23, 2026
Who is constructing it
How much land 4,466 acres what a permit allows [2] luzernecounty.org (opens in a new tab) October 23, 2026
Buildings
Where its power comes from
Grid connection
How it is cooled
State permit status Proposed, no permit applications received the state's permit register, as of October 7, 2026, last verified October 23, 2026 [1] gis.dep.pa.gov (opens in a new tab) October 23, 2026

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Luzerne County and Salem Township about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Hazle Township Hazle Township enacted a municipal moratorium on the data center project theguardian.com (opens in a new tab)
Hazle Township Hazle Township's government rejected the data center project on zoning grounds and placed a temporary moratorium on data center construction breitbart.com (opens in a new tab)
Salem Township DEP published notice inviting comments on NPDES Water Quality Permit for Amazon Data Services ADS Berwick Data Center in Salem Township, Luzerne County paenvironmentdaily.blogspot.com (opens in a new tab)
Luzerne County Plains Township to host hearing on AI data center zoning map changes to accommodate data centers on September 22 in Luzerne County paenvironmentdaily.blogspot.com (opens in a new tab)
Salem Township Planning Commission voted Thursday to recommend township supervisors approve expansion of data center overlay district for third project despite court stay order thecentersquare.com (opens in a new tab)
Salem Township Salem Township Board of Supervisors scheduled to meet Wednesday to decide on data center overlay zone expansion timesleader.com (opens in a new tab)
2 earlier decisions on the county's rows
DateWhoDecisionSource
Hazle Township Hazle Township supervisors passed a 180 day freeze on new data center applications on June 8, 2026, pausing Project Hazelnut while officials rewrite zoning rules thecooldown.com (opens in a new tab)
Hazle Township Hazle Township Supervisors voted 3-0 on November 14, 2025 to deny land development approval for Project Hazelnut standardspeaker.com (opens in a new tab)

What happened

  1. · Status: permitting (content date)

    A proposed third data center campus in Salem Township encompassing 279 properties and 4,466 acres is undergoing a zoning hearing process that a Luzerne County judge ordered to be redone after residents were locked out of the July 23, 2026 meeting.

    [3] citizensvoice.com

  2. · Status: proposed (content date)

    The 4-3 Glen Brook Group announced a data center campus in Salem Township encompassing approximately 4,000 acres with a 39 building campus and potential power demand of 3.5 to 4 gigawatts.

    timesleader.com (opens in a new tab) local outlet

The full 4-3 Salem Township Data Center timeline, in order

  • Read on October 7, 2026 (the day the page was read; it gives no date of its own)

    The Pennsylvania DEP's Data Center Permit Tracker lists the project as proposed, with no permit applications received, as of October 7, 2026.

    [1] gis.dep.pa.gov

The site

The pin is the site. The shaded outline is the parcel, from the county's own parcel record.

The site map is at the top of the page.

Where
Salem Boulevard & Moores Hill Road, Salem Township, PA 18603, Salem Township, Luzerne County, Pennsylvania [2] luzernecounty.org (opens in a new tab)
How exactly it is located
Exact, on the parcel
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center

USGS NAIP aerial view of 4-3 Salem Township Data Center
LAT 41.08140 / LON -76.19703 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is 4-3 Salem Township Data Center?

The record has 2 measures of its size: 3.5 GW (the developer's figure, luzernecounty.org (opens in a new tab)) and 4,466 acres (what a permit allows, luzernecounty.org (opens in a new tab)). Each figure names who gave it and links to the source.

Who is building 4-3 Salem Township Data Center?

4-3 Glen Brook Group is the developer, gis.dep.pa.gov (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does 4-3 Salem Township Data Center say it needs?

Power: 3.5 GW (the developer's figure, luzernecounty.org (opens in a new tab)). Water: not disclosed by any source on file.

Where does 4-3 Salem Township Data Center stand today?

It is proposed; the date it reached that stage is not sourced, only the day a page was read. The newest entry, August 25, 2026: A proposed third data center campus in Salem Township encompassing 279 properties and 4,466 acres is undergoing a zoning hearing process that a Luzerne County judge ordered to be redone after residents were locked out of the July 23, 2026 meeting. [3]

What has Salem Township or Luzerne County decided about it?

Hazle Township: Hazle Township enacted a municipal moratorium on the data center project (reported October 19, 2026, theguardian.com (opens in a new tab)); and Hazle Township: Hazle Township's government rejected the data center project on zoning grounds and placed a temporary moratorium on data center construction (reported September 29, 2026, breitbart.com (opens in a new tab)). 8 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Pennsylvania DEP Data Center Permit Tracker (opens in a new tab), Pennsylvania Department of Environmental Protection, October 7, 2026
  2. Luzerne County Assessment and Salem Township Zoning Hearing Docket (4-3 Glen Brook Group Campus) (opens in a new tab), Luzerne County Assessment Office, August 25, 2026

Reporting

  1. Judge: Salem Twp. broke law, must redo data center hearing - The Citizens' Voice (opens in a new tab), The Citizens' Voice, August 25, 2026, query feed

3 sources on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "4-3 Salem Township Data Center", https://datacenterrecord.org/projects/4-3-salem-township-data-center-pa, last verified October 23, 2026. CSV · JSON
Cite this page

Data Center Record, "4-3 Salem Township Data Center", https://datacenterrecord.org/projects/4-3-salem-township-data-center-pa. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
41.081402, -76.197027
How the location is known
Location from the county parcel record.
Location source
PA DEP Data Center Permit Tracker and Luzerne County parcel records in Salem Township, PA 18603.
Coordinate source
PA DEP Data Center Permit Tracker point in Salem Township
Location last verified
October 23, 2026
How capacity was disclosed
the developer's figure
How acreage was disclosed
what a permit allows
Capacity, if disclosed
3.5 GW, the developer's figure
Published
October 13, 2026
Last verified
October 23, 2026
Undisclosed in public filings
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, Interconnection, Rating of the county's rows

Researcher view · 4-3 Salem Township Data Center · 3 sources, 3 entries, 8 decisions nearby · basis and source tier on every row · verified October 23, 2026

Download CSV JSON