Data Center Record.

Being built Reviewed in depth

Amazon Luzerne Data Center (Susquehanna Campus)

Salem Township, Luzerne County, PADeveloper: Amazon Web ServicesCensus GEOID 42079

Stage
Being built
Land
1,200 acres
what a permit allows
Undisclosed in public filings
Power, Buildings, Water

Amazon Web Services is constructing a hyperscale data center campus acquired from Talen Energy (Cumulus Data) on 1,200 acres adjacent to the Susquehanna Steam Electric Station at 500 Salem Boulevard in Salem Township, Luzerne County, Pennsylvania. Phase 1 has completed Pennsylvania DEP review with all 4 permits issued, while Phase 2 has 4 permits under review (3 issued, 1 pending). It is being built, as reported September 1, 2026.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 4 sources, 3 primary · Reviewed by a person, every entry sourced. · How to read this page

  • This record: Being built, ringed
  • data center
  • Smaller pins: 78 other published records in Pennsylvania
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
1,200 acres what a permit allows
[1] gis.dep.pa.gov
Who leads it
Amazon Web Services as stated by the source
[1] gis.dep.pa.gov
Where its power comes from
Colocated nuclear power from Talen Energy Susquehanna Steam Electric Station under PJM interconnection filings as stated by the source
[3] ferc.gov
State permit status
Phase 1: DEP review complete; Phase 2: permits under review the state's permit register, as of October 7, 2026, last verified October 23, 2026
[1] gis.dep.pa.gov
Undisclosed in public filings
Buildings, Power it would draw, Water, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Amazon Web Services as stated by the source [1] gis.dep.pa.gov (opens in a new tab) October 23, 2026
Who is constructing it
How much land 1,200 acres what a permit allows [1] gis.dep.pa.gov (opens in a new tab) October 23, 2026
Buildings
Where its power comes from Colocated nuclear power from Talen Energy Susquehanna Steam Electric Station under PJM interconnection filings as stated by the source [3] ferc.gov (opens in a new tab) October 23, 2026
Grid connection
How it is cooled
State permit status Phase 1: DEP review complete; Phase 2: permits under review the state's permit register, as of October 7, 2026, last verified October 23, 2026 [1] gis.dep.pa.gov (opens in a new tab) October 23, 2026

Jobs once it runs, also reported: 1,000 jobs, 2026 (Times Leader (opens in a new tab): Amazon project expected to support approximately 1,000 permanent high skilled tech jobs) .

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Luzerne County and Salem Township about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Hazle Township Hazle Township enacted a municipal moratorium on the data center project theguardian.com (opens in a new tab)
Hazle Township Hazle Township's government rejected the data center project on zoning grounds and placed a temporary moratorium on data center construction breitbart.com (opens in a new tab)
Salem Township DEP published notice inviting comments on NPDES Water Quality Permit for Amazon Data Services ADS Berwick Data Center in Salem Township, Luzerne County paenvironmentdaily.blogspot.com (opens in a new tab)
Luzerne County Plains Township to host hearing on AI data center zoning map changes to accommodate data centers on September 22 in Luzerne County paenvironmentdaily.blogspot.com (opens in a new tab)
Salem Township Planning Commission voted Thursday to recommend township supervisors approve expansion of data center overlay district for third project despite court stay order thecentersquare.com (opens in a new tab)
Salem Township Salem Township Board of Supervisors scheduled to meet Wednesday to decide on data center overlay zone expansion timesleader.com (opens in a new tab)
2 earlier decisions on the county's rows
DateWhoDecisionSource
Hazle Township Hazle Township supervisors passed a 180 day freeze on new data center applications on June 8, 2026, pausing Project Hazelnut while officials rewrite zoning rules thecooldown.com (opens in a new tab)
Hazle Township Hazle Township Supervisors voted 3-0 on November 14, 2025 to deny land development approval for Project Hazelnut standardspeaker.com (opens in a new tab)

What happened

  1. · Status: being built (source date; the content gives no date of its own)

    Amazon's data center project in Salem Township is in construction.

    [4] thecentersquare.com

  2. · Status: permitting (content date)

    The Pennsylvania DEP received the project's first permit application on June 11, 2024; its tracker lists Phase 1 as DEP review complete and Phase 2 as permits under review (45 permits: 36 issued, 5 pending, 4 not yet submitted).

    [1] gis.dep.pa.gov

The full Amazon Luzerne Data Center (Susquehanna Campus) timeline, in order

What was said

Hayes says data center impacts can reach beyond the companies building the facilities, potentially affecting neighbors and taxpayers through electricity costs and the availability of public water.
Benjamin Hayes, Watershed Sciences and Engineering · October 14, 2026 · paraphrased · WITF (opens in a new tab) local outlet
King says Pennsylvania's energy resources and location near major East Coast cities make it appealing to companies developing AI data centers, and the rapid expansion of AI is contributing to growing energy demand.
Brian R. King, Bucknell University · October 14, 2026 · paraphrased · WITF (opens in a new tab) local outlet

Every statement about data centers in Pennsylvania, by speaker

3 more on this page, one per speaker and claim; 5 statements in all

Dr. Benjamin Hayes, program director of Watershed Sciences and Engineering, says many large data centers use water to cool their equipment.

WITF (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: WITF (opens in a new tab).

Brian R. King, an associate professor of computer science at Bucknell University, says data centers house powerful computers used to train and operate AI models, relying on graphics processing units that require substantial amounts of electricity.

WITF (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: WITF (opens in a new tab).

Hayes argues that communities need to consider how multiple data center projects could affect the same watershed or power supply, rather than evaluating each proposal in isolation.

Watershed Sciences and Engineering WITF (opens in a new tab) local outlet project record
Context & source notes

Provenance: Paraphrased; said in the source itself.

Primary source: WITF (opens in a new tab).

The site

The pin is the site, as the EPA's facility record places it. Location from an EPA facility record.

The site map is at the top of the page.

Where
500 Salem Boulevard, Berwick (Salem Township), PA 18603, Salem Township, Luzerne County, Pennsylvania [1] gis.dep.pa.gov (opens in a new tab)
How exactly it is located
Exact, the point of the EPA's facility record
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center

USGS NAIP aerial view of Amazon Luzerne Data Center (Susquehanna Campus)
LAT 41.10928 / LON -76.14361 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, the record's own or the document's first, each with who gave it, its date and its basis.

Permanent jobs

1 figure, 1 source
Show each source's words
  • 1,000 jobs, Times Leader: Amazon project expected to support approximately 1,000 permanent high skilled tech jobs

Questions about this project

7 questions answered from the record

Answered from the rows on this page.

How big is Amazon Luzerne Data Center (Susquehanna Campus)?

The record has one measure of its size: 1,200 acres (what a permit allows, gis.dep.pa.gov (opens in a new tab)). Its power capacity is not disclosed.

Who is building Amazon Luzerne Data Center (Susquehanna Campus)?

Amazon Web Services is the developer, gis.dep.pa.gov (opens in a new tab). No construction contractor is named on the record yet.

Who will use Amazon Luzerne Data Center (Susquehanna Campus)?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Amazon Luzerne Data Center (Susquehanna Campus) say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Amazon Luzerne Data Center (Susquehanna Campus) stand today?

It is being built, as reported September 1, 2026. The newest entry, reported September 1, 2026: Amazon's data center project in Salem Township is in construction. [4]

What has Salem Township or Luzerne County decided about it?

Hazle Township: Hazle Township enacted a municipal moratorium on the data center project (reported October 19, 2026, theguardian.com (opens in a new tab)); and Hazle Township: Hazle Township's government rejected the data center project on zoning grounds and placed a temporary moratorium on data center construction (reported September 29, 2026, breitbart.com (opens in a new tab)). 8 events are on the county's rows; a rule about the area is not a decision about this record.

What is still unknown about Amazon Luzerne Data Center (Susquehanna Campus)?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, buildings, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Pennsylvania DEP Data Center Permit Tracker: Salem Township Data Center Development (Amazon Web Services) - Phase 1 (opens in a new tab), Pennsylvania Department of Environmental Protection, October 7, 2026
  2. Susquehanna River Basin Commission Docket No. 20250912: Susquehanna Steam Electric Station Colocated Data Center Campus Water Approval (opens in a new tab), Susquehanna River Basin Commission, September 12, 2025
  3. FERC Docket No. ER24-2172: PJM Interconnection Service Agreement for Susquehanna Nuclear and Cumulus / Amazon Data Center Campus (opens in a new tab), Federal Energy Regulatory Commission, November 1, 2024

Reporting

  1. Local Planning Commission vote violates court order on data center measure - The Center Square (opens in a new tab), The Center Square, September 1, 2026, national outlet

4 sources on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Amazon Luzerne Data Center (Susquehanna Campus)", https://datacenterrecord.org/projects/amazon-luzerne-data-center-pa, last verified October 23, 2026. CSV · JSON
Cite this page

Data Center Record, "Amazon Luzerne Data Center (Susquehanna Campus)", https://datacenterrecord.org/projects/amazon-luzerne-data-center-pa. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
41.109278, -76.143611
How the location is known
Location from an EPA facility record.
Location source
PA DEP Data Center Permit Tracker point and Luzerne County parcel adjacent to the Susquehanna Steam Electric Station in Salem Township, PA 18603.
Coordinate source
PA DEP Data Center Permit Tracker permit coordinates in Salem Township
Location source number
[1]
Location last verified
October 23, 2026
How acreage was disclosed
what a permit allows
Published
October 1, 2026
Last verified
October 23, 2026
Undisclosed in public filings
EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Amazon Luzerne Data Center (Susquehanna Campus) · 4 sources, 2 entries, 8 decisions nearby · basis and source tier on every row · verified October 23, 2026

Download CSV JSON