DXC Technology Services LLC / Cherokee Data Center

Tulsa, Tulsa County, OKDeveloper: DXC Technology Services LLCCensus GEOID 40143

Undisclosed in public filings
Power, Land, Buildings, Water

The EPA's facility registry lists DXC Technology Services LLC / Cherokee Data Center at 7400 N Lakewood Ave, Tulsa, OK 74117 in Tulsa, Oklahoma, with an air permit. It is not yet verified: a public source shows this site exists and names no stage for it, such as a permit on file or an operator's list that calls it in consideration; its current status has not been confirmed from a record.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 1 source, 1 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Not yet verified, ringed
  • data center
  • Smaller pins: 15 other published records in Oklahoma
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Who leads it
DXC Technology Services LLC as stated by the source
[1] echo.epa.gov
Undisclosed in public filings
Land, Buildings, Power it would draw, Water, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it DXC Technology Services LLC as stated by the source [1] echo.epa.gov (opens in a new tab) October 20, 2026
Who is constructing it
How much land
Buildings
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Tulsa County and Tulsa about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Broken Arrow City created a committee led by legal department to conduct comprehensive review of data center development focused on land use, environmental concerns, infrastructure, public safety and economic impacts newson6.com (opens in a new tab)
Broken Arrow Broken Arrow City Council approved a six month moratorium on data center applications or development in June 2026 newson6.com (opens in a new tab)

What happened

No dated entry is on the record yet.

The site

The pin is the site, as the EPA's facility record places it. Location from an EPA air permit.

The site map is at the top of the page.

Where
7400 N Lakewood Ave, Tulsa, OK 74117, Tulsa, Tulsa County, Oklahoma [1] echo.epa.gov (opens in a new tab)
How exactly it is located
Exact, the point of the EPA's facility record
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
By the straight line between two exact points.

USGS NAIP aerial view of DXC Technology Services LLC / Cherokee Data Center
LAT 36.26113 / LON -95.90698 Imagery: U.S. Geological Survey / USDA NAIP (Public Domain)

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building DXC Technology Services LLC / Cherokee Data Center?

DXC Technology Services LLC is the developer, echo.epa.gov (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does DXC Technology Services LLC / Cherokee Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does DXC Technology Services LLC / Cherokee Data Center stand today?

It is not yet verified: a public source shows this site exists and names no stage for it, such as a permit on file or an operator's list that calls it in consideration; its current status has not been confirmed from a record. No dated entry is on the record yet.

What has Tulsa or Tulsa County decided about it?

Broken Arrow: City created a committee led by legal department to conduct comprehensive review of data center development focused on land use, environmental concerns, infrastructure, public safety and economic impacts (reported August 24, 2026, newson6.com (opens in a new tab)); and Broken Arrow: Broken Arrow City Council approved a six month moratorium on data center applications or development in June 2026 (reported August 24, 2026, newson6.com (opens in a new tab)). 2 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. EPA ECHO detailed facility report: DXC Technology Services LLC / Cherokee Data Center (opens in a new tab), U.S. Environmental Protection Agency

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "DXC Technology Services LLC / Cherokee Data Center", https://datacenterrecord.org/projects/dxc-technology-services-llc-cherokee-data-center-tulsa-ok, last verified October 20, 2026. CSV · JSON
Cite this page

Data Center Record, "DXC Technology Services LLC / Cherokee Data Center", https://datacenterrecord.org/projects/dxc-technology-services-llc-cherokee-data-center-tulsa-ok. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Not yet verified
Tier
built from one source
Tags
Built from one source
Coordinates
36.26113, -95.90698
How the location is known
Location from an EPA facility record.
Location source
EPA ECHO facility record 110012160311: the registry placed its point by address matching house number, accurate to 30 m
Coordinate source
epa frs point
Location source number
[1]
Location last verified
October 20, 2026
EPA registry id
110012160311
Published
October 20, 2026
Last verified
October 20, 2026
Undisclosed in public filings
Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows