Cologix lists 7 data centers at Columbus, Ohio among the sites it operates. [3] Filings on the record specify 4 planned or operational buildings. [3] Cologix lists Cologix COL1, Cologix COL2, Cologix COL3, Cologix COL4, Cologix COL5, Cologix COL7, Cologix COL8 at Columbus, Ohio on its own page of data center locations, read September 14, 2026. [1]
U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.
Utility interconnection queue filings monitored.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 535 Scherers Court, Columbus, OH 43085.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Cologix Columbus.
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | |||
| Data Hall Buildings | 4 buildings | 4 | operator page |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Columbus City Council President Shannon Hardin convened a public hearing on March 11, 2026 examining how hyperscale data centers across Central Ohio affect Columbus municipal water supply, electric grid capacity, and local taxpayers.
"The goal of the hearing was to develop the city's strategy on how to address the challenges that come with these developments. Although most of the data centers located across central Ohio are not built within the city of Columbus, City council President Shannon Hardin said Columbus residents and service providers still bear the responsibility of supplying the electricity. and water they require, he noted that data centers use millions of gallons of water each day."
"Data centers for me are a test of if we can get that balance right. 83% of data centers in Virginia use the same or less water than an average office building. some even use less than a typical household. Large data centers may require up to 5 million gallons of water per day. That compares to, to the water needs of a city of about 50,000 residents, about the size of the city of Dublin. Now,"
Using this data in a report? Support the record.
Columbus and Franklin County municipal tax abatement and utility infrastructure record for the $7.8 billion Central Ohio hyperscale data center expansion (June 26, 2023).
"possible location could be New Albany in January the company paid nearly 117 million dollars for Parcels on Beach Road Northwest near the Intel site since 2015 AWS has invested 6.3 billion dollars in Ohio supporting an average of more than 3 500 full time equivalent jobs annually we'll certainly have more on that major announcement tonight on"
Using this data in a report? Support the record.
Hilliard City Council public hearing on resident opposition and school board revenue sharing for Amazon Web Services Community Reinvestment Area property tax abatements (May 8, 2023).
"it would be one of the top reasons to leave is this fuel cell and data centers. The AEP managed fuel cell plant will use natural gas to help produce energy, putting in a pipeline that will produce multiple gaseous chemicals as a byproduct. But the concern goes beyond just pollution. Like, will that cause problems with gas or emissions or explosions or ruin the food we're eating? The Ohio EPA has signed off on the project, while concern has expanded to"
"fight the best we can, appeal the EPA decision, which was still in the appealable period, and file what we can and really examine the process that was done. Data center plans originally enticing to the city, now it's different. When Amazon first came, they were a good business partner. They're in our schools, they've got the lab, but they've gotten away from that. With the project originally up to a review, citing a state statute, AEP removed city oversight site requirements, proceeding"
"with approval just from the state. A city councilor telling me that's to avoid community accountability. Yeah, they saw it coming. They saw the fact that they could the planning and zoning commission even saw it that hey, this isn't been vetted. While the project is set to begin construction in January, appeals have been put in by city and community members, saying the future will look the same for both the city and its community. Honestly, we are going to"
Using this data in a report? Support the record.
Chronological regulatory, corporate and permitting events on the record, newest first.
No dated entry is on the record yet.
Read on September 14, 2026 (the day the page was read; it gives no date of its own)
Cologix lists Cologix COL1, Cologix COL2, Cologix COL3, Cologix COL4, Cologix COL5, Cologix COL7, Cologix COL8 at Columbus, Ohio on its own page of data center locations, read September 14, 2026.
Verified data center records in Ohio within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Centersquare Columbus data center Delaware County | 4 mi | Running | Centersquare | 1 building |
| Expedient Columbus - Upper Arlington Upper Arlington, Franklin County | 6 mi | Running | Expedient | 1 building |
| Expedient Columbus - Dublin Dublin, Franklin County | 8 mi | Running | Expedient | 1 building |
| QTS Data Centers New Albany New Albany, Franklin County | 11 mi | Being built | QTS Data Centers | 4 buildings |
| Amazon Sunbury data center campus Sunbury, Delaware County | ~11 mi | Proposed | Amazon Web Services | |
| Edged New Albany data center New Albany, Franklin County | 12 mi | Running | Edged | 24 MW |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Cologix is the developer. No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
Official developer campus overview or project specification page.
18 sources on file.
This site is in the RFC West (RFCW) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Cologix Columbus. Last verified October 25, 2026. https://datacenterrecord.org/projects/cologix-columbus-oh. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about Cologix Columbus
Data Center Record, "Cologix Columbus", https://datacenterrecord.org/projects/cologix-columbus-oh. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.