● Proposed Campus Announced September 28, 2026 · Amazon Web Services

Amazon Sunbury data center campus

Location Sunbury, Delaware County, Ohio city centroid Town level, the center of the city

Overview, regulatory gates and specifications

Amazon Web Services proposed a large scale data center campus in the Sunbury Business and Technology Park, about 1,300 acres in all, near Sunbury; residents submitted 450 petition signatures to place a voter referendum on the rezoning ordinance. [2]

Verified Site & Permit Summary
Verified address
Sunbury, Delaware County, Ohio city centroid
Operator / developer
Amazon Web Services
Permit / registry ID
10TV on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Amazon Web Services as stated by the source
[3] delawaresource.com
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Amazon Web Services · Parent: Amazon
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Amazon Sunbury data center campus.

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Delaware County and Sunbury about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Sunbury Sunbury voters approved the citizen initiated charter amendment adding Article XI Section 11.05 to prohibit construction of a data center above 25 megawatts on November 3, 2026, voting 2,400 in favor (59.67 percent) to 1,622 against (40.33 percent). ballotpedia.org (opens in a new tab)
Sunbury Sunbury voters voted on a citizen initiated charter amendment on November 3, 2026 adding Article XI Section 11.05 to prohibit construction of a data center above 25 megawatts. delawaresource.com (opens in a new tab)

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

Nearest data centers in Ohio

Verified data center records in Ohio within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Centersquare Columbus data center Delaware County ~9 mi Running Centersquare 1 building
Cologix Columbus Columbus, Franklin County ~11 mi Running Cologix 4 buildings
Edged New Albany data center New Albany, Franklin County ~12 mi Running Edged 24 MW
Vantage New Albany New Albany, Franklin County ~13 mi Running Vantage Data Centers 2 buildings
Microsoft New Albany datacenter New Albany, Franklin County ~13 mi Running Microsoft 1 building
QTS Data Centers New Albany New Albany, Franklin County ~13 mi Being built QTS Data Centers 4 buildings

Blank cell: not disclosed by any source on file.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Project footprint

1 figure, 1 source
1,300 acres Government

City of Sunbury, Feb 24, 2026

Show each source's words
  • 1,300 acres, City of Sunbury: Site area: the Sunbury Business and Technology Park, where Amazon Web Services is siting a data center campus, Sunbury, Delaware County, Ohio

Common questions about Amazon Sunbury data center campus

Answered directly from the verified filings and local actions on this page.

Who is building Amazon Sunbury data center campus?

Amazon Web Services is the developer, delawaresource.com (opens in a new tab). No construction contractor is named on the record yet.

Who will use Amazon Sunbury data center campus?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Amazon Sunbury data center campus say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Amazon Sunbury data center campus stand today?

It is proposed; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Sunbury or Delaware County decided about it?

Sunbury: Sunbury voters approved the citizen initiated charter amendment adding Article XI Section 11.05 to prohibit construction of a data center above 25 megawatts on November 3, 2026, voting 2,400 in favor (59.67 percent) to 1,622 against (40.33 percent), ballotpedia.org (opens in a new tab); and Sunbury: Sunbury voters voted on a citizen initiated charter amendment on November 3, 2026 adding Article XI Section 11.05 to prohibit construction of a data center above 25 megawatts, delawaresource.com (opens in a new tab). 2 events are on the county's rows; a rule about the area is not a decision about this record.

What is still unknown about Amazon Sunbury data center campus?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, buildings, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Sunbury Business and Technology Park: frequently asked questions (opens in a new tab), City of Sunbury, February 24, 2026, local outlet
  2. Sunbury residents push to let voters decide on proposed Amazon data center - 10TV (opens in a new tab), 10TV, July 6, 2026, national outlet
  3. Sunbury City Council approves ordinance that could leave data centers in hands of voters - Delaware Source (opens in a new tab), Delaware Source, July 15, 2026, local outlet

3 sources on file.

Regional grid context

This site is in the RFC West (RFCW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Amazon Sunbury data center campus", https://datacenterrecord.org/projects/amazon-sunbury-data-center-campus-oh, last verified October 31, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Amazon Sunbury data center campus", https://datacenterrecord.org/projects/amazon-sunbury-data-center-campus-oh. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
40.2494, -82.8802
How the location is known
Location is the city center; exact site not disclosed.
Coordinate source
City of Sunbury, Delaware County, Ohio (Census Gazetteer)
Published
September 28, 2026
Last verified
October 31, 2026
Not disclosed
Location source, Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Amazon Sunbury data center campus · 3 sources, 0 entries, 2 decisions nearby · basis and source tier on every row · verified October 31, 2026

Download CSV JSON