Google Salix Data Center

Google is considering a data center in Salix, Iowa and created a public website to provide information and updates to the community about the potential project. It is reported, as reported September 3, 2026.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 7 sources, 0 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
Not disclosed
Water
Not disclosed
Who leads it
Google
as stated by the source
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Google as stated by the source September 17, 2026
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Woodbury County and Salix about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Salix Moratorium vote on data center consideration failed in Salix, Iowa reutersconnect.com
Salix Salix, IA city leaders discussed a data center ordinance and future conversations with Google. kttc.com
Salix Salix city leaders discussed data center ordinance and future conversations with Google 1011now.com
Salix Salix City Council voted down a proposed 12 month moratorium on data centers on August 20, 2026 ktiv.com

What happened

  1. (source date; the content gives no date of its own)

    Local leaders in Norwalk approved a development agreement for a $12 billion data center project. [4]

  2. (source date; the content gives no date of its own)

    Death threats sidelined a planned city council meeting in Salix where local leaders were set to discuss a proposed Google data center. [4]

  3. · Status: rumored (source date; the content gives no date of its own)

    Google announced a website for Salix residents to learn about a potential data center, stating it is in early review process with no final decision made [6]

The full Google Salix Data Center timeline, in order

5 corrections to this record

Every correction, with its reason
  1. · the speaker role of a statements row

    Speaker read again from the statement's source line, "Mayor Kevin Nelson, Salix": the title in front of the name (Mayor) is the role, not part of the name. The old and new text.

  2. · the speaker of a statements row

    Speaker read again from the statement's source line, "Mayor Kevin Nelson, Salix": the title in front of the name (Mayor) is the role, not part of the name. The old and new text.

  3. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  4. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  5. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

Every correction on the record is on the corrections page.

What was said

The Winnebago Tribal Council has approved a resolution opposing hyperscale data centers on or near its reservation
Margaret Scott, Winnebago Tribal Council member · September 30, 2026 · paraphrased · Kiowa County Press local outlet
Republican candidate Zach Lahn calls for a statewide pause on data center construction.
Zach Lahn, Republican gubernatorial candidate · September 10, 2026 · paraphrased · Muscatine Journal local outlet

Every statement about data centers in Iowa, by speaker

5 more statements on this page

Democratic gubernatorial candidate

Democratic candidate Rob Sand issued a standalone policy plan laying out his vision for data centers, calling for transparency, union jobs and setback requirements.

September 10, 2026, Muscatine Journal · Muscatine Journal local outlet · the record (Paraphrased; said in the source itself)

Democratic gubernatorial candidate

Sand stated Iowans have been getting a raw deal from data centers.

September 10, 2026, Muscatine Journal · Muscatine Journal local outlet · the record (Paraphrased; said in the source itself)

Salix City Council member

City Council Member Gene Monk voted for a one year moratorium to allow time for community research before making a decision

August 20, 2026, KTIV · KTIV local outlet · the record (Paraphrased; said in the source itself)

Mayor, Salix

Mayor Kevin Nelson confirmed that no moratorium was legally in place following the July meeting, and the moratorium failed to pass at both the July and August 20 meetings

August 20, 2026, KTIV · KTIV local outlet · the record (Paraphrased; said in the source itself)

Salix City Council

The moratorium would have suspended all communication with Google as the tech giant explores constructing a data center on land in Salix

August 20, 2026, KTIV · KTIV local outlet · the record (Paraphrased; said in the source itself)

The site

Where in Woodbury County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 12 other published records in Iowa
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Salix, Woodbury County, Iowa
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building Google Salix Data Center?

Google is the developer. No construction contractor is named on the record yet.

How much power and water does Google Salix Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Google Salix Data Center stand today?

It is reported, as reported September 3, 2026. The newest entry, reported September 10, 2026: Local leaders in Norwalk approved a development agreement for a $12 billion data center project. [4]

What has Salix or Woodbury County decided about it?

Salix: Moratorium vote on data center consideration failed in Salix, Iowa (reported September 16, 2026, source); and Salix: Salix, IA city leaders discussed a data center ordinance and future conversations with Google. (reported September 10, 2026, source). 4 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. GOOGLE HOPES TO WORK WITH SALIX ON DATA CENTER DEVELOPMENT PROPOSAL - KSCJ 1360, KSCJ 1360, August 5, 2026, query feed
  2. Google creates website to provide info, updates on possible Salix data center - siouxcityjournal.com, siouxcityjournal.com, September 3, 2026, local outlet
  3. Google debuts website encouraging Salix residents to learn about data centers - kcau9.com, kcau9.com, September 3, 2026, local outlet
  4. Iowa data center debate looms in governor race. Where Sand, Lahn stand - Muscatine Journal, Muscatine Journal, September 10, 2026, local outlet
  5. Google to shift data center plans from rural Linn County to Palo - Corridor Business Journal, Corridor Business Journal, March 4, 2026, local outlet
  6. Google debuts website encouraging Salix residents to learn about data centers, www.yahoo.com, September 3, 2026, local outlet
  7. Google is considering a data center in Salix, IA - KTIV, KTIV, August 3, 2026, local outlet

7 sources on file.

Cite this record

Data Center Record, "Google Salix Data Center", https://datacenterrecord.org/projects/google-salix-data-center-ia, last verified September 17, 2026.

Last verified , first recorded . Every correction is logged on the corrections page and under What happened.

Cite this page

Data Center Record, "Google Salix Data Center", https://datacenterrecord.org/projects/google-salix-data-center-ia. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
google-salix-data-center-ia
Status value
rumored
Stage
Proposed
Tier
skeleton
Tags
skeleton
Place id
us/ia/woodbury-county/salix
Coordinates
42.49806, -96.39556
Location precision
county
Location source
County seat (Sioux City), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location source number
Not disclosed
Location last verified
September 16, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-05
Last verified
2026-09-17