Google Bridgeport data center
Google's data center campus in Bridgeport, Jackson County, Alabama, operating since 2019 on a site of more than 600 acres. It is reported, since January 1, 2019.
How much power it needs, how much water it would use and who would use it have not been disclosed.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Land
- Not disclosed
- Power it would draw
- Not disclosed
- Water
- Not disclosed
- Who leads it
- as stated by the source
- Who would use it
- Not disclosed
- Jobs once it runs
- Not disclosed
- Tax each year
- Not disclosed
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | Not disclosed | |||
| How much water it would use | Not disclosed | |||
| How loud it would be | Not disclosed | |||
| Jobs once it runs | Not disclosed | |||
| Tax it would pay each year | Not disclosed |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | as stated by the source | October 4, 2026 | ||
| Who is constructing it | Not disclosed | |||
| How much land | Not disclosed | |||
| Where its power comes from | Not disclosed | |||
| Grid connection | Not disclosed | |||
| How it is cooled | Not disclosed |
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Water useA state water right filing or a water supply agreement.
- Who would use itA lease announcement or a tenant named in a filing.
- Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
- Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.
What happened
-
(source date; the content gives no date of its own)
The data center began operating in 2019 [3]
-
(source date; the content gives no date of its own)
Less than a quarter of the campus property has been developed so far [3]
-
· Status: rumored (content date)
Google's Bridgeport, Alabama data center began operating in 2019 (the video names the year only); corrects the entry dated 2026-06-19, which carried the video's upload date [3]
The full Google Bridgeport data center timeline, in order
13 corrections to this record
Every correction, with its reason
-
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
-
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier: video is tier 5 (the editor, 2026-09-23). The link did not change. The day's label corrections.
-
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier: video is tier 5 (the editor, 2026-09-23). The link did not change. The day's label corrections.
-
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier: video is tier 5 (the editor, 2026-09-23). The link did not change. The day's label corrections.
-
· the summary of a status history row
The note "(Entry dated by the video's upload date; see the correction.)" appended by the date correction of 2026-09-08 belongs in this log, not in the event sentence; the date basis of the row already says the date is the source's. The sentence is restored to the event only (2026-09-13). The old and new text.
-
· the summary of a status history row
The note "(Entry dated by the video's upload date; see the correction.)" appended by the date correction of 2026-09-08 belongs in this log, not in the event sentence; the date basis of the row already says the date is the source's. The sentence is restored to the event only (2026-09-13). The old and new text.
-
· the date basis of a reference figures row
Date basis recorded (2026-09-08, /methodology#dates): the row's date is the video's upload date, the source's own date, because the content gives no date of its own. The old and new text.
-
· the date basis of a reference figures row
Date basis recorded (2026-09-08, /methodology#dates): the row's date is the video's upload date, the source's own date, because the content gives no date of its own. The old and new text.
-
· the date basis of a reference figures row
Date basis recorded (2026-09-08, /methodology#dates): the row's date is the video's upload date, the source's own date, because the content gives no date of its own. The old and new text.
-
· the date basis of a status history row
Date basis recorded (2026-09-08, /methodology#dates): the row's date is the video's upload date, the source's own date, because the content gives no date of its own. The old and new text.
-
· the date basis of a status history row
Date basis recorded (2026-09-08, /methodology#dates): the row's date is the video's upload date, the source's own date, because the content gives no date of its own. The old and new text.
-
· the summary of a status history row
Dated by the video's upload date (ABC News, 2026-06-19), which is the source date; the corrected entry dated 2019-01-01 carries the year the video gives. The old and new text.
-
· the summary of a status history row
Dated by the video's upload date (ABC News, 2026-06-19), which is the source date; the content says so far, no other date. The old and new text.
Every correction on the record is on the corrections page.
The site
The pin is the site, as the EPA's facility record places it. Location from an EPA hazardous waste record.
Tap a pin for the data center, the parcel for its record
- This record: Proposed, ringed
- data center
- Smaller pins: 9 other published records in Alabama
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
- Where
- 48809 Alabama Hwy 277, Bridgeport, AL 35740, Bridgeport, Jackson County, Alabama [source]
- How exactly it is located
- Exact, the point of the EPA's facility record
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- Meta Huntsville Data Center, 52 mi
Questions about this project
4 questions answered from the record
Who is building Google Bridgeport data center?
-
Google is the developer. No construction contractor is named on the record yet.
How much power and water does Google Bridgeport data center say it needs?
-
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
Where does Google Bridgeport data center stand today?
-
It is reported, since January 1, 2019. The newest entry, reported June 19, 2026: The data center began operating in 2019 [3].
What has Bridgeport or Jackson County decided about it?
-
No decision by Bridgeport or Jackson County about data centers is on the record. The Jackson County page and the Alabama scorecard list every rated row the day a person publishes one.
Sources
Primary documents
- EPA ECHO detailed facility report: Google LLC, U.S. Environmental Protection Agency
- Google: Data center locations, Google, September 14, 2026
Reporting
- Inside Google's AI data centers, YouTube, June 19, 2026, video
3 sources on file.
Cite this record
Data Center Record, "Google Bridgeport data center", https://datacenterrecord.org/projects/google-bridgeport-data-center-al, last verified October 4, 2026.
Cite this page
Data Center Record, "Google Bridgeport data center", https://datacenterrecord.org/projects/google-bridgeport-data-center-al. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.
For researchers
- Slug
- google-bridgeport-data-center-al
- Status value
- rumored
- Stage
- Proposed
- Tier
- skeleton
- Tags
- skeleton
- Place id
- us/al/jackson-county/bridgeport
- Coordinates
- 34.930645, -85.731149
- Location precision
- permit_point
- Location source
- https://echo.epa.gov/detailed-facility-report?fid=110070571480
- Coordinate source
- https://echo.epa.gov/detailed-facility-report?fid=110070571480
- Location source number
- [1]
- Location last verified
- October 4, 2026
- EPA registry id
- 110070571480
- Use type values
- not_disclosed
- Tenancy value
- not_disclosed
- Cooling type value
- not_disclosed
- Capacity basis
- not_disclosed
- Water basis
- not_disclosed, gallons_per_day
- Acreage basis
- Not disclosed
- Interconnection value
- not_disclosed
- Capacity, if disclosed
- Not disclosed
- Rating of the county's rows
- Not disclosed
- Published
- 2026-09-08
- Last verified
- 2026-10-04