Meta Huntsville Data Center

Street address 5400 Prosperity DR NW, Huntsville, AL 35810, Madison County permit coordinates Exact, the point of the EPA's facility record [2] EPA ECHO detailed facility report: Starbelt, North Huntsville

Overview, regulatory gates and specifications

Meta lists a data center at Huntsville, Alabama among the sites it operates. [3] Meta lists Meta Huntsville Data Center at Huntsville, Alabama on its own page of data center locations, read September 14, 2026. [1]

Verified Site & Permit Summary
Verified address
5400 Prosperity DR NW, Huntsville, AL 35810, Madison County permit coordinates
Operator / developer
Meta
Permit / registry ID
Huntsville Business Journal on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2021 (5 years)
Who leads it
Meta as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Sam Givhan

State Senator · Alabama State Senate

DID Recorded statement at AL.com interview (October 28, 2026)
SAID We have limited energy here in the Tennessee Valley and, particularly in challenging times, I want that limited energy to be utilized to run plants, such as Eli Lilly, that provide high paying jobs for our citizens and not simply running super computers with limited associated maintenance jobs. (October 28, 2026) alreporter.com (opens in a new tab)

Doug Jones

Democratic candidate for Alabama governor · Alabama

DID Recorded statement at WAFF (October 12, 2026)
SAID Doug Jones called for stronger regulations on data centers, including limits on tax incentives and requirements to address their power and water use. (October 12, 2026) waff.com (opens in a new tab)

Jennie Robinson

Huntsville City Council President

DID Recorded statement at Huntsville Business Journal (September 23, 2026) [3]
SAID Jennie Robinson, Huntsville City Council President, said the one hyperscale data center in Huntsville is plenty and future proposals should be evaluated under formal city policy (September 23, 2026) [3]

Bill Kling

District 4 City Council Member

DID Recorded statement at Huntsville Business Journal (September 23, 2026) [3]
SAID Bill Kling, District 4 City Council Member, stated he is opposed to any additional data centers coming into Huntsville and the city should not give them inducements (September 23, 2026) [3]

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Meta
UTILITIES
Electric utility: Not disclosed

View all 9 statements on the record in Alabama →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Meta Huntsville Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Meta lists Meta Huntsville Data Center at Huntsville, Alabama on its own page of data center locations, read September 14, 2026.

    [1] datacenters.atmeta.com

1 correction to this record

Every correction, with its reason
  1. · Power capacity (3.5 MW to not disclosed)

    The capacity read 3.5 MW. The source's figure was 3.5 million square feet, a floor area, not a capacity, and the approval of September 25, 2026 wrote the number as megawatts. Returned to not disclosed, as it was before.

Every correction on the record is on the corrections page.

Nearest data centers in Alabama

Verified data center records in Alabama within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Google Bridgeport data center Bridgeport, Jackson County 52 mi Proposed Google

Blank cell: not disclosed by any source on file.

Common questions about Meta Huntsville Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Meta Huntsville Data Center?

Meta is the developer. No construction contractor is named on the record yet.

How much power and water does Meta Huntsville Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Meta Huntsville Data Center stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Meta: Our U.S. data center fleet (opens in a new tab), Meta, September 14, 2026
  2. EPA ECHO detailed facility report: Starbelt, North Huntsville (opens in a new tab), U.S. Environmental Protection Agency

Reporting

  1. Are More Data Centers Coming To North Alabama? What Local Leaders Are Saying - Huntsville Business Journal (opens in a new tab), Huntsville Business Journal, September 23, 2026, news outlet

3 sources on file.

Regional grid context

This site is in the SERC South (SRSO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Meta Huntsville Data Center", https://datacenterrecord.org/projects/meta-huntsville-data-center-al, last verified October 4, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Meta Huntsville Data Center", https://datacenterrecord.org/projects/meta-huntsville-data-center-al. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
34.84103, -86.63394
How the location is known
Location from an EPA facility record.
Location source
https://echo.epa.gov/detailed-facility-report?fid=110070255546
Coordinate source
https://echo.epa.gov/detailed-facility-report?fid=110070255546
Location source number
[2]
Location last verified
October 4, 2026
EPA registry id
110070255546
Published
September 14, 2026
Last verified
October 4, 2026
Not disclosed
Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Meta Huntsville Data Center · 3 sources, 1 entry · basis and source tier on every row · verified October 4, 2026

Download CSV JSON