      "slug": "google-bridgeport-data-center-al",
      "name": "Google Bridgeport data center",
      "summary": "Google's data center campus in Bridgeport, Jackson County, Alabama, operating since 2019 on a site of more than 600 acres.",
      "state": "AL",
      "city": "Bridgeport",
      "county": "Jackson County",
      "status": "rumored",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 34.930645,
      "longitude": -85.731149,
      "location_precision": "permit_point",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110070571480",
      "location_verified_at": "2026-10-04",
      "coordinate_source": "https://echo.epa.gov/detailed-facility-report?fid=110070571480",
      "location_last_verified": "2026-10-04",
      "site_address": "48809 Alabama Hwy 277, Bridgeport, AL 35740",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070571480",
      "published": "2026-09-08",
      "last_verified": "2026-10-04",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "record_url": "https://datacenterrecord.org/projects/google-bridgeport-data-center-al",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Google LLC",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070571480",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Inside Google's AI data centers",
          "url": "https://www.youtube.com/watch?v=TfW5pWpsHAo",
          "publisher": "YouTube",
          "date": "2026-06-19",
          "source_tier": 5
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-06-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-19",
          "summary": "The data center began operating in 2019",
          "source_url": "https://www.youtube.com/watch?v=TfW5pWpsHAo",
          "source_tier": 5
        },
        {
          "status": "rumored",
          "effective_at": "2026-06-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-19",
          "summary": "Less than a quarter of the campus property has been developed so far",
          "source_url": "https://www.youtube.com/watch?v=TfW5pWpsHAo",
          "source_tier": 5
        },
        {
          "status": "rumored",
          "effective_at": "2019-01-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-19",
          "summary": "Google's Bridgeport, Alabama data center began operating in 2019 (the video names the year only); corrects the entry dated 2026-06-19, which carried the video's upload date",
          "source_url": "https://www.youtube.com/watch?v=TfW5pWpsHAo",
          "source_tier": 5
        }
      ]
    }
  ]
}