● Running Reported December 15, 2022 · 2 Buildings

Meta Temple Data Center

Street address 4200 NW Loop 363, Synergy Park, Temple, TX 76504, Bell County verified address Exact, at the address [3] U.S. Census Bureau TIGERweb city centroid, public domain

Overview, regulatory gates and specifications

Meta lists a data center at Temple, Texas among the sites it operates. [1] Filings on the record specify a 393 acre site footprint, 2 planned or operational buildings, closed loop liquid cooling. [1] Meta lists Meta Temple Data Center at Temple, Texas on its own page of data center locations, read September 14, 2026. [1]

1. Land & Parcel
393 acres on file
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
EPA ECHO Facility Registry R
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand
Not disclosed
No MW figure in public filings yet

U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.

Utility interconnection queue filings monitored.

Cooling & Water [2]
Closed loop liquid
water

Cooling system: Closed loop liquid (water). Closed loop chillers recirculate fluid rather than evaporating continuous potable water.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
393 acres
measured

2 planned or operational data hall buildings.

Location: 4200 NW Loop 363, Synergy Park, Temple, TX 76504.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
393 acres assessor parcel
bellcad.org (opens in a new tab)
Buildings
2 buildings assessor parcel
[1] datacenters.atmeta.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2022 (4 years)
Who leads it
Meta attributed via corporate HQ or property filing
[1] datacenters.atmeta.com
How it is cooled
Closed loop liquid as stated by the source
[2] datacenters.atmeta.com
Cooling fluid
water as stated by the source
[2] datacenters.atmeta.com
Permitted legal entity
Sprig LLC (Meta Platforms, Inc.) what a permit allows
[3] echo.epa.gov
State air permit registration
FRS 110072189269, TXR1535YA state air permit register
State permit status
EPA ECHO Facility Registry Record FRS 110072189269 and TCEQ Construction Stormwater General Permit TXR1535YA for AUS04 Data Center at 4200 NW Loop 363, Temple, TX 76504 and City of Temple Chapter 380 Agreement (Sprig LLC) the state's permit register, last verified November 9, 2026
[3] echo.epa.gov
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Meta · Applicant / Shell LLC: Sprig LLC
UTILITIES
Electric utility: Not disclosed · Cooling / Water: water

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Meta Temple Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres) 393 acres 393 acres measured
Data Hall Buildings 2 buildings 2 2 operational data center buildings at 4200 NW Loop 363 in Temple Synergy Park per Meta Temple campus specification and Bell County Appraisal District parcel records [1] datacenters.atmeta.com
Cooling & Water System Closed loop liquid water Company / permit specification [2] datacenters.atmeta.com
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

September 3, 2026 Temple, TX Temple City Council Regular Meeting Temple City Council 3 clips

Temple City Council reviewed a land swap agreement with Rowan Data Center releasing contracted acreage for expansion of the Temple municipal landfill alongside updated noise and setback standards for data center developments.

  1. Brynn Myers, City Manager, City of Temple Board & Planning Staff transcribed from the official recording
    "identified as the only viable landfill expansion site for our community. Rowan had this property under contract and was prepared to buy it for a data center location. they were they agreed to work with the city and allowed the city to take over the purchase of that property from the private property owner. So the city of Temple purchased that property"
  2. Temple Municipal Planning Staff Board & Planning Staff transcribed from the official recording
    "use regulations that are so restrictive that they function as a de facto ban. So what have you done here in Temple? You have you have introduced the following protections for data center developments. these data center developments specifically through planned development conditions for Rowan. and tonight you will hear a request from city staff to consider"
  3. Temple City Council Member Elected Official transcribed from the official recording
    "water loss due to evaporation. there's really limited land acquisition and environ environmental disruption when using an ASR system because you're using the natural underground geology for storage. Whereas with the reservoir that can include significant land acquisition and environmental disruption because you're using large portions of surface land in order to create"
Said and filed

Said and filed

Statements and filings, side by side

Earlier and later statements State of Texas / San Marcos & Corpus Christi Hearing Record → Project Dossier: meta-temple-data-center-tx →
Power & Grid Water Zoning
Column A · Dated Statement
Greg Abbott & State Sen. Paul Bettencourt Governor of Texas & Chair, Texas Senate Local Government Committee
Venue: Texas State Capitol & ERCOT Economic Recruitment Record
"Advanced state recruitment of hyperscale artificial intelligence data centers and state legislation preempting local municipal regulatory restrictions on commercial and energy infrastructure."
City of San Marcos
Column B · Subsequent Recorded Position
Governor Greg Abbott Endorsement of Statewide Audit of Data Center Grid & Water Impacts
Texas Executive Data Center Impact Audit · August 25, 2026
Agency or Venue: Office of the Texas Governor & KUT 90.5 Austin (NPR)
"Following municipal rezoning denials such as San Marcos City Council's rejection of the 375 megawatt Highlander SM1 campus and drought testimony in Corpus Christi, Governor Greg Abbott endorsed a formal state audit of data center development impacts on ERCOT grid reliability and water supplies."

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: running Moratorium (source date; the content gives no date of its own)

    Meta put construction pause on $800 million Temple data center.

    [5] kcentv.com

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Meta lists Meta Temple Data Center at Temple, Texas on its own page of data center locations, read September 14, 2026.

    [1] datacenters.atmeta.com

1 correction to this record

Every correction, with its reason
  1. · Project summary

    the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word

Every correction on the record is on the corrections page.

Nearest data centers in Texas

Verified data center records in Texas within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
DataBank Waco data center Waco, McLennan County 32 mi Running DataBank 1 building
Google Pflugerville Data Center Pflugerville, Travis County 50 mi Running Google 1 building
DataBank Austin data center Austin, Travis County 53 mi Running DataBank 1 building

Blank cell: not disclosed by any source on file.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Project footprint

1 figure, 1 source
Show each source's words
  • 50 acres, The Killeen Daily Herald: Aycock property could potentially be a site for a 50 acre data center

Common questions about Meta Temple Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Meta Temple Data Center?

Meta is the developer, datacenters.atmeta.com (opens in a new tab). No construction contractor is named on the record yet.

Who will use Meta Temple Data Center?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Meta Temple Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Meta Temple Data Center stand today?

It is running, as reported December 15, 2022. The newest entry, reported December 15, 2022: Meta put construction pause on $800 million Temple data center. [5]

What is still unknown about Meta Temple Data Center?

Not disclosed by any source on file: how much power it needs, how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, where its power comes from, grid connection. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Meta: Our U.S. data center fleet (opens in a new tab), Meta, September 14, 2026
  2. Meta Data Centers: Temple, we are online! (opens in a new tab), Meta
  3. US EPA ECHO Detailed Facility Report 110072189269 (AUS04 Data Center, NPDES TXR1535YA, 4200 NW Loop 363, Temple, TX) (opens in a new tab), U.S. Environmental Protection Agency, November 9, 2026

Reporting

  1. Meta project expected to resume in late 2023 - Temple Daily Telegram (opens in a new tab), Temple Daily Telegram, June 24, 2023, news outlet
  2. Meta puts construction pause on $800M Temple data center - kcentv.com (opens in a new tab), kcentv.com, December 15, 2022, local outlet

5 sources on file.

Regional grid context

This site is in the ERCOT All (ERCT) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Meta Temple Data Center", https://datacenterrecord.org/projects/meta-temple-data-center-tx, last verified November 9, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Meta Temple Data Center", https://datacenterrecord.org/projects/meta-temple-data-center-tx. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
31.1445, -97.3985
How the location is known
Location from the site's street address.
Location source
U.S. Census Bureau TIGERweb city centroid, public domain
Coordinate source
US EPA ECHO FRS and municipal parcel records
Location last verified
November 6, 2026
Cooling
Closed loop liquid
How acreage was disclosed
measured
Published
September 14, 2026
Last verified
November 9, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, How capacity was disclosed, How water was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Meta Temple Data Center · 5 sources, 2 entries · basis and source tier on every row · verified November 9, 2026