● Being Built Reported April 17, 2025

Homer City Energy Campus Redevelopment

Overview, regulatory gates and specifications

Homer City Redevelopment LLC is redeveloping the 3,200 acre former Homer City Generating Station at 1750 Power Plant Road in Center and Blacklick Townships near Homer City, Indiana County, Pennsylvania into a natural gas powered AI data center campus with up to 4.5 gigawatts of generation capacity. The Indiana County Conservation District issued a PAG-02 general stormwater construction permit and a draft NPDES industrial waste amendment in 2026 as 1,800 tradespeople work on site. [4] Filings on the record specify disclosed capacity of 4.5 GW (the developer's figure). [2] The Homer City plant redevelopment is now being built by 1,800 contractors and tradespeople. [4]

1. Land & Parcel
3,200 acres on file
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
4.5 GW disclosed
5. Air & Water Permits
Proposed, no permit applicat
What happens next: Campus is under construction; building inspections, utility energization and air permits are monitored.
Electricity Demand [2]
4.5 GW
the developer's figure

Equivalent to ~3,735,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 216% of Hoover Dam nameplate capacity (2,080 MW).

Electric utility: Planned 4.5 GW on site natural gas combined cycle power plant.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
3,200 acres
what a permit allows

Building count not yet itemized in public filings.

Location: 1750 Power Plant Road, Homer City, PA 15748.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
4.5 GW developer figure Equivalent to the continuous electricity demand of about 3,735,000 average U.S. homes based on U.S. Energy Information Administration residential consumption data, or about 2.2 times the 2,080 MW generating capacity of Hoover Dam. About 0.44 times New York City's summer peak demand in 2024.
[2] indianacountypa.gov
Water usage
Not disclosed
Land area
3,200 acres permitted
[2] indianacountypa.gov
Buildings
Not disclosed
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Homer City Redevelopment LLC as stated by the source
[1] gis.dep.pa.gov
Where its power comes from
Planned 4.5 GW on site natural gas combined cycle power plant as stated by the source
[2] indianacountypa.gov
State permit status
Proposed, no permit applications received the state's permit register, as of October 7, 2026, last verified October 23, 2026
[1] gis.dep.pa.gov
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Homer City Energy Campus Redevelopment, capacity: 4,500 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 4,500 ÷ 10,245 = 0.44 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Alex Bomstein

Advocate · Climate advocacy

DID Recorded statement at Article commentary (October 22, 2026)
SAID The AI data center boom is truly the greatest threat to a stable climate that we face today (October 22, 2026) inquirer.com (opens in a new tab)

Josh Shapiro

Governor of Pennsylvania · Commonwealth of Pennsylvania

DID Recorded statement at Creators Syndicate (September 29, 2026)
SAID Governor Shapiro stated his administration counted only five of more than 100 data center proposals statewide with permits to build, describing a Gold Rush atmosphere with developers bullying neighbors. (September 29, 2026) creators.com (opens in a new tab)

Mary Nelson

letter writer

DID Recorded statement at Erie Times-News (September 18, 2026) [5]
SAID Mary Nelson, Erie resident, calls for local oversight and complete transparency on data center development (September 18, 2026) [5]
Donald Trump

Donald Trump

President · Office of the President

DID Recorded statement at Public remarks (July 1, 2025)
SAID They're going to spend billions of dollars on rebuilding it. It's going to be the largest plant of its kind in the world, I believe. It's going to be great. (July 1, 2025) inquirer.com (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Homer City Redevelopment LLC
UTILITIES
Electric utility: Planned 4.5 GW on site natural gas combined cycle power plant

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Homer City Energy Campus Redevelopment.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 4.5 GW the developer's figure [2] indianacountypa.gov
Site Footprint (Acres) 3,200 acres 3,200 acres what a permit allows [2] indianacountypa.gov
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (content date)

    The Homer City plant redevelopment is now being built by 1,800 contractors and tradespeople.

    [4] post-gazette.com

  2. (source date; the content gives no date of its own)

    Fifty three trucks hauling oversized loads will travel through Armstrong, Westmoreland, and Indiana counties over four months transporting large industrial pieces

    [7] cbsnews.com

  3. · Status: being built (source date; the content gives no date of its own)

    Homer City Energy Campus being transformed for data center innovation from brownfield

    [3] datacenterfrontier.com

Every event in order

11 corrections to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Pennsylvania

Verified data center records in Pennsylvania within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Amazon Web Services data center, Center Township Center Township, Indiana County Less than 1 mi Proposed Amazon Web Services
TECfusions Keystone Connect AI Data Center New Kensington, Westmoreland County 27 mi Running TECfusions 3 GW
Springdale Data Center Springdale, Allegheny County 31 mi Proposed Allegheny DC Property Co. LLC
H5 Data Centers Pittsburgh Pittsburgh, Allegheny County 41 mi Running H5 Data Centers 1 building
DataBank Pittsburgh Downtown (PIT1) Pittsburgh, Allegheny County 43 mi Running DataBank 4.5 MW
EdgeConneX Pittsburgh (PIT01) Pittsburgh, Allegheny County 45 mi Running EdgeConneX 1 building

Blank cell: not disclosed by any source on file.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Capacity at full buildout

2 figures, 2 sources
Show each source's words
  • 4.5 GW, Tom's Hardware: AWS data center campus in Homer City Pennsylvania proposed 4.5 GW across 36 buildings without seeking tax incentives

Common questions about Homer City Energy Campus Redevelopment

Answered directly from the verified filings and local actions on this page.

Who is building Homer City Energy Campus Redevelopment?

Homer City Redevelopment LLC is the developer, gis.dep.pa.gov (opens in a new tab). No construction contractor is named on the record yet.

Who will use Homer City Energy Campus Redevelopment?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Homer City Energy Campus Redevelopment say it needs?

Power: 4.5 GW (the developer's figure, indianacountypa.gov (opens in a new tab)). Water: not disclosed by any source on file.

Where does Homer City Energy Campus Redevelopment stand today?
What is still unknown about Homer City Energy Campus Redevelopment?

Not disclosed by any source on file: how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, buildings, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Pennsylvania DEP Data Center Permit Tracker (opens in a new tab), Pennsylvania Department of Environmental Protection, October 7, 2026
  2. Indiana County Tax Assessment and Conservation District PAG-02 Stormwater Permit Records (1750 Power Plant Road, Homer City) (opens in a new tab), Indiana County Tax Assessment Office, September 11, 2026

Reporting

  1. Pennsylvania's Homer City Energy Campus: A Brownfield Transformed for Data Center Innovation - datacenterfrontier.com (opens in a new tab), datacenterfrontier.com, April 17, 2025, trade press
  2. Homer City plant’s redevelopment now fueled by 1,800 contractors and tradespeople (opens in a new tab), Pittsburgh Post-Gazette, September 4, 2026, local outlet
  3. Regulate data centers, shale energy to protect people, planet | Letter - Erie Times-News (opens in a new tab), Erie Times-News, September 18, 2026, news outlet
  4. DEP To Hold Oct. 14 Meeting/Hearing On Major Amendment To Water Quality Permit For Homer City Data Center/Power Plant Complex In Indiana County; Stormwater Permit Issued - PA Environment Digest Blog (opens in a new tab), PA Environment Digest Blog, September 11, 2026, local outlet
  5. 53 trucks hauling oversized loads to move through Armstrong, Westmoreland and Indiana counties - CBS News (opens in a new tab), CBS News, September 2, 2026, national outlet

7 sources on file.

Regional grid context

This site is in the RFC West (RFCW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Homer City Energy Campus Redevelopment", https://datacenterrecord.org/projects/homer-city-plant-redevelopment-pa, last verified October 23, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Homer City Energy Campus Redevelopment", https://datacenterrecord.org/projects/homer-city-plant-redevelopment-pa. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Being built
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
40.51278, -79.19611
How the location is known
Location from the county parcel record.
Location source
PA DEP Data Center Permit Tracker and Indiana County Tax Assessment parcel for the former Homer City Generating Station at 1750 Power Plant Road, Homer City, PA 15748.
Coordinate source
PA DEP Data Center Permit Tracker and Indiana County parcel at 1750 Power Plant Road
Location last verified
October 23, 2026
How capacity was disclosed
the developer's figure
How acreage was disclosed
what a permit allows
Capacity, if disclosed
4.5 GW, the developer's figure
Published
September 4, 2026
Last verified
October 23, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, Interconnection, Rating of the county's rows

Researcher view · Homer City Energy Campus Redevelopment · 7 sources, 3 entries · basis and source tier on every row · verified October 23, 2026