Homer City Redevelopment LLC is redeveloping the 3,200 acre former Homer City Generating Station at 1750 Power Plant Road in Center and Blacklick Townships near Homer City, Indiana County, Pennsylvania into a natural gas powered AI data center campus with up to 4.5 gigawatts of generation capacity. The Indiana County Conservation District issued a PAG-02 general stormwater construction permit and a draft NPDES industrial waste amendment in 2026 as 1,800 tradespeople work on site. [4] Filings on the record specify disclosed capacity of 4.5 GW (the developer's figure). [2] The Homer City plant redevelopment is now being built by 1,800 contractors and tradespeople. [4]
Equivalent to ~3,735,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 216% of Hoover Dam nameplate capacity (2,080 MW).
Electric utility: Planned 4.5 GW on site natural gas combined cycle power plant.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Building count not yet itemized in public filings.
Location: 1750 Power Plant Road, Homer City, PA 15748.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Sources:
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
The AI data center boom is truly the greatest threat to a stable climate that we face today(October 22, 2026) inquirer.com (opens in a new tab)
Governor Shapiro stated his administration counted only five of more than 100 data center proposals statewide with permits to build, describing a Gold Rush atmosphere with developers bullying neighbors.(September 29, 2026) creators.com (opens in a new tab)
Mary Nelson, Erie resident, calls for local oversight and complete transparency on data center development(September 18, 2026) [5]
They're going to spend billions of dollars on rebuilding it. It's going to be the largest plant of its kind in the world, I believe. It's going to be great.(July 1, 2025) inquirer.com (opens in a new tab)
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Homer City Energy Campus Redevelopment.
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | 4.5 GW | the developer's figure [2] indianacountypa.gov | |
| Site Footprint (Acres) | 3,200 acres | 3,200 acres | what a permit allows [2] indianacountypa.gov |
| Data Hall Buildings | |||
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Chronological regulatory, corporate and permitting events on the record, newest first.
(content date)
The Homer City plant redevelopment is now being built by 1,800 contractors and tradespeople.
(source date; the content gives no date of its own)
Fifty three trucks hauling oversized loads will travel through Armstrong, Westmoreland, and Indiana counties over four months transporting large industrial pieces
· Status: being built (source date; the content gives no date of its own)
Homer City Energy Campus being transformed for data center innovation from brownfield
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
Every correction on the record is on the corrections page.
Verified data center records in Pennsylvania within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Amazon Web Services data center, Center Township Center Township, Indiana County | Less than 1 mi | Proposed | Amazon Web Services | |
| TECfusions Keystone Connect AI Data Center New Kensington, Westmoreland County | 27 mi | Running | TECfusions | 3 GW |
| Springdale Data Center Springdale, Allegheny County | 31 mi | Proposed | Allegheny DC Property Co. LLC | |
| H5 Data Centers Pittsburgh Pittsburgh, Allegheny County | 41 mi | Running | H5 Data Centers | 1 building |
| DataBank Pittsburgh Downtown (PIT1) Pittsburgh, Allegheny County | 43 mi | Running | DataBank | 4.5 MW |
| EdgeConneX Pittsburgh (PIT01) Pittsburgh, Allegheny County | 45 mi | Running | EdgeConneX | 1 building |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Homer City Redevelopment LLC is the developer, gis.dep.pa.gov (opens in a new tab). No construction contractor is named on the record yet.
Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.
Power: 4.5 GW (the developer's figure, indianacountypa.gov (opens in a new tab)). Water: not disclosed by any source on file.
It is being built, since September 4, 2026. The newest entry, September 4, 2026: The Homer City plant redevelopment is now being built by 1,800 contractors and tradespeople. [4]
Not disclosed by any source on file: how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, buildings, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.
7 sources on file.
This site is in the RFC West (RFCW) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Homer City Energy Campus Redevelopment. Last verified October 23, 2026. https://datacenterrecord.org/projects/homer-city-plant-redevelopment-pa. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Homer City Energy Campus Redevelopment