Amazon Web Services withdrew its proposal for a 4 building, 500 MW nuclear colocated data center campus adjacent to the Calvert Cliffs Clean Energy Center in Lusby, Calvert County, Maryland, in August 2026 prior to the Calvert County Board of County Commissioners enacting a 6 month moratorium. [4] Governor Wes Moore's position on data centers evolved as an Amazon project surged ahead in Maryland. [4]
Equivalent to ~415,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 24% of Hoover Dam nameplate capacity (2,080 MW).
Grid interconnection and utility service tracked on file.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 1650 Calvert Cliffs Parkway, Lusby, MD 20657.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Sources:
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Amazon Web Services Calvert Cliffs Data Center Proposal.
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | 500 MW | the developer's figure [4] yahoo.com | |
| Site Footprint (Acres) | |||
| Data Hall Buildings | 4 buildings | zoning filing [4] yahoo.com | |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Official recording of Calvert County Board of County Commissioners in Prince Frederick, MD: Calvert County Informational Session: Understanding Data Centers 101 College of Southern Maryland (April 28, 2026).
"Welcome to our first informational session on data centers and we're calling it 101. My name's Linda Turner. I serve as the county administrator for Calvert County. And we appreciate you seeing so many people here this evening. The Board of County Commissioners have directed us to host Can you hear? Sure. Sure. Can you hear now? Okay, very good. The Board of County Commissioners have"
"This is so that we send information out to residents and we're providing you up to date info. I'd like to thank Dr. Wilson, Tommy Bateman and the College of Southern Maryland for generously hosting us this evening. We truly appreciate their support in providing us the space and the time here this evening. I also want to recognize Michelle So Shultz from Congressman Hoyer's office sitting over here. Thank you for being"
"We chose to hold tonight's session because we want to keep the community informed and engaged. Please take a moment to review the handout that you picked up at the door. It outlines a lot of the requirements for public engagement and highlights and other opportunities for you to voice your concerns and support in the future. Throughout this session, I ask that you remain seated and refrain from calling"
Using this data in a report? Support the record.
Chronological regulatory, corporate and permitting events on the record, newest first.
· Status: being built (source date; the content gives no date of its own)
Amazon Web Services is developing more than 777,000 square feet of data center space across four buildings at Quantum Frederick campus near Adamstown
· Status: proposed (content date)
Governor Wes Moore's position on data centers evolved as an Amazon project surged ahead in Maryland.
(source date; the content gives no date of its own)
Amazon withdrew plans to build three data centers near Calvert Cliffs Nuclear Plant in Lusby
Filing (source date; the content gives no date of its own)
Amazon submitted site plans in May 2026 to Calvert County for a sprawling campus of seven facilities near the nuclear plant
(source date; the content gives no date of its own)
Amazon withdrew its plan on August 4, 2026
(source date; the content gives no date of its own)
Calvert County residents discovered Amazon's data center plan and county officials had not announced it
(source date; the content gives no date of its own)
Amazon posted a job listing for a construction manager in Lusby in late February, revealing plans for a large data center campus at Calvert Cliffs nuclear power plant
Filing (source date; the content gives no date of its own)
AWS withdrew the application as of August 4, 2026
(source date; the content gives no date of its own)
Proposal called for three campuses across 200 acres with eight data center buildings and up to 500 MW capacity supplied by Constellation Energy
Filing (source date; the content gives no date of its own)
AWS submitted initial application on May 18 for a development adjacent to Calvert Cliffs Nuclear Power Plant
(content date)
Amazon Web Services withdrew from its planned data center campus next to the Calvert Cliffs nuclear plant in Calvert County, Maryland.
(content date)
AWS withdrew its application on August 4, 2026 for a proposed data center campus adjacent to Calvert Cliffs Nuclear Power Plant, comprising three campuses across 200 acres with eight buildings and up to 500 MW of capacity.
· cancelled (content date)
Amazon/AWS planned a data center campus adjacent to the Calvert Cliffs nuclear plant in Calvert County, Maryland, but withdrew from the project amid community and political opposition.
the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
Tier after resolution (September 21, 2026). The source on file is thebanner.com, the publisher's own page. The item reached the record through Google News: "data center" Maryland, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 1 row of sources. The speaker, the claim, the date and the url are unchanged.
Tier after resolution (September 21, 2026). The source on file is thebanner.com, the publisher's own page. The item reached the record through Google News: "data center" Maryland, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 1 row of sources. The speaker, the claim, the date and the url are unchanged.
Every correction on the record is on the corrections page.
Verified data center records in Maryland within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Lerner Enterprises Landover Mall Data Center Campus Proposal Landover, Prince George's County | 41 mi | Proposed | Lerner Enterprises | 200 MW |
| AiNET Beltsville Data Center Campus Beltsville, Prince George's County | 49 mi | Running | AiNET | 20 MW |
| AiNET Glen Burnie CyberNAP Data Center (MD-790R) Glen Burnie, Anne Arundel County | 50 mi | Running | AiNET | 12 MW |
| Atlantech Online Silver Spring Data Center Silver Spring, Montgomery County | 50 mi | Running | Atlantech Online | 3 MW |
| AiNET Laurel Data Center (WDC11) Laurel, Prince George's County | 51 mi | Running | AiNET | 6 MW |
| Centersquare Silver Spring Data Center (DCA1 / Prosperity Drive) Silver Spring, Montgomery County | 52 mi | Running | Centersquare | 16 MW |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Amazon Web Services is the developer. No construction contractor is named on the record yet.
Power: 500 MW (the developer's figure, yahoo.com (opens in a new tab)). Water: not disclosed by any source on file.
It is cancelled; the date it reached that stage is not sourced, only the day a page was read. The newest entry, reported September 2, 2026: Amazon Web Services is developing more than 777,000 square feet of data center space across four buildings at Quantum Frederick campus near Adamstown [9].
15 sources on file.
This site is in the RFC East (RFCE) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Amazon Web Services Calvert Cliffs Data Center Proposal. Last verified November 6, 2026. https://datacenterrecord.org/projects/amazon-aws-data-center-campus-at-calvert-cliffs-md. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Amazon Web Services Calvert Cliffs Data Center Proposal
Data Center Record, "Amazon Web Services Calvert Cliffs Data Center Proposal", https://datacenterrecord.org/projects/amazon-aws-data-center-campus-at-calvert-cliffs-md. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.