● Stalled or Cancelled Recorded August 4, 2026 · 4 Buildings

Amazon Web Services Calvert Cliffs Data Center Proposal

Street address 1650 Calvert Cliffs Parkway, Lusby, MD 20657, Calvert County verified address Exact, at the address [4] yahoo.com

Overview, regulatory gates and specifications

Amazon Web Services withdrew its proposal for a 4 building, 500 MW nuclear colocated data center campus adjacent to the Calvert Cliffs Clean Energy Center in Lusby, Calvert County, Maryland, in August 2026 prior to the Calvert County Board of County Commissioners enacting a 6 month moratorium. [4] Governor Wes Moore's position on data centers evolved as an Amazon project surged ahead in Maryland. [4]

1. Land & Parcel
Parcel located
2. Local Zoning
Not yet on file
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
500 MW disclosed
5. Air & Water Permits
Not yet on file
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand [4]
500 MW
the developer's figure

Equivalent to ~415,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 24% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [4]
4 buildings
zoning filing

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 1650 Calvert Cliffs Parkway, Lusby, MD 20657.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
500 MW developer figure Equivalent to the continuous electricity demand of about 415,000 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 5 percent of New York City's summer peak demand in 2024.
[4] yahoo.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
4 buildings operator page
[4] yahoo.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Amazon Web Services as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Amazon Web Services Calvert Cliffs Data Center Proposal, capacity: 500 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 500 ÷ 10,245 = 0.05 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Amazon Web Services · Parent: Amazon
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Amazon Web Services Calvert Cliffs Data Center Proposal.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 500 MW the developer's figure [4] yahoo.com
Site Footprint (Acres)
Data Hall Buildings 4 buildings zoning filing [4] yahoo.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

April 28, 2026 Prince Frederick, MD Calvert County Informational Session: Understanding Data Centers 101 College of Southern Maryland Calvert County Board of County Commissioners 3 clips

Official recording of Calvert County Board of County Commissioners in Prince Frederick, MD: Calvert County Informational Session: Understanding Data Centers 101 College of Southern Maryland (April 28, 2026).

  1. Calvert County Board of Commissioners Officials and Speakers Elected Official transcribed from the official recording
    "Welcome to our first informational session on data centers and we're calling it 101. My name's Linda Turner. I serve as the county administrator for Calvert County. And we appreciate you seeing so many people here this evening. The Board of County Commissioners have directed us to host Can you hear? Sure. Sure. Can you hear now? Okay, very good. The Board of County Commissioners have"
  2. Resident public comment Resident Public Comment transcribed from the official recording
    "This is so that we send information out to residents and we're providing you up to date info. I'd like to thank Dr. Wilson, Tommy Bateman and the College of Southern Maryland for generously hosting us this evening. We truly appreciate their support in providing us the space and the time here this evening. I also want to recognize Michelle So Shultz from Congressman Hoyer's office sitting over here. Thank you for being"
  3. Calvert County Board of Commissioners Member Elected Official transcribed from the official recording
    "We chose to hold tonight's session because we want to keep the community informed and engaged. Please take a moment to review the handout that you picked up at the door. It outlines a lot of the requirements for public engagement and highlights and other opportunities for you to voice your concerns and support in the future. Throughout this session, I ask that you remain seated and refrain from calling"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: being built (source date; the content gives no date of its own)

    Amazon Web Services is developing more than 777,000 square feet of data center space across four buildings at Quantum Frederick campus near Adamstown

    [9] foxbaltimore.com

  2. · Status: proposed (content date)

    Governor Wes Moore's position on data centers evolved as an Amazon project surged ahead in Maryland.

    [4] yahoo.com

  3. (source date; the content gives no date of its own)

    Amazon withdrew plans to build three data centers near Calvert Cliffs Nuclear Plant in Lusby

    [6] fox5dc.com

  4. Filing (source date; the content gives no date of its own)

    Amazon submitted site plans in May 2026 to Calvert County for a sprawling campus of seven facilities near the nuclear plant

    [7] thebanner.com

  5. (source date; the content gives no date of its own)

    Amazon withdrew its plan on August 4, 2026

    [7] thebanner.com

  6. (source date; the content gives no date of its own)

    Calvert County residents discovered Amazon's data center plan and county officials had not announced it

    [7] thebanner.com

  7. (source date; the content gives no date of its own)

    Amazon posted a job listing for a construction manager in Lusby in late February, revealing plans for a large data center campus at Calvert Cliffs nuclear power plant

    [7] thebanner.com

  8. Filing (source date; the content gives no date of its own)

    AWS withdrew the application as of August 4, 2026

    [1] datacenterknowledge.com

5 earlier entries
  1. (source date; the content gives no date of its own)

    Proposal called for three campuses across 200 acres with eight data center buildings and up to 500 MW capacity supplied by Constellation Energy

    [1] datacenterknowledge.com

  2. Filing (source date; the content gives no date of its own)

    AWS submitted initial application on May 18 for a development adjacent to Calvert Cliffs Nuclear Power Plant

    [1] datacenterknowledge.com

  3. (content date)

    Amazon Web Services withdrew from its planned data center campus next to the Calvert Cliffs nuclear plant in Calvert County, Maryland.

    [4] yahoo.com

  4. (content date)

    AWS withdrew its application on August 4, 2026 for a proposed data center campus adjacent to Calvert Cliffs Nuclear Power Plant, comprising three campuses across 200 acres with eight buildings and up to 500 MW of capacity.

    [4] yahoo.com

  5. · cancelled (content date)

    Amazon/AWS planned a data center campus adjacent to the Calvert Cliffs nuclear plant in Calvert County, Maryland, but withdrew from the project amid community and political opposition.

    [4] yahoo.com

Every event in order

25 corrections to this record

Every correction, with its reason
  1. · Project summary

    the record's rules: the sentence copied its source, was about its headline or carried a number the card's facts do not; written again from the card's facts, on the editor's word

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  4. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  5. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  6. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  7. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  8. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  9. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  10. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  11. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  12. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  13. · Source tier

    Tier after resolution (September 21, 2026). The source on file is thebanner.com, the publisher's own page. The item reached the record through Google News: "data center" Maryland, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 1 row of sources. The speaker, the claim, the date and the url are unchanged.

  14. · Source tier

    Tier after resolution (September 21, 2026). The source on file is thebanner.com, the publisher's own page. The item reached the record through Google News: "data center" Maryland, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 1 row of sources. The speaker, the claim, the date and the url are unchanged.

Every correction on the record is on the corrections page.

Nearest data centers in Maryland

Verified data center records in Maryland within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Lerner Enterprises Landover Mall Data Center Campus Proposal Landover, Prince George's County 41 mi Proposed Lerner Enterprises 200 MW
AiNET Beltsville Data Center Campus Beltsville, Prince George's County 49 mi Running AiNET 20 MW
AiNET Glen Burnie CyberNAP Data Center (MD-790R) Glen Burnie, Anne Arundel County 50 mi Running AiNET 12 MW
Atlantech Online Silver Spring Data Center Silver Spring, Montgomery County 50 mi Running Atlantech Online 3 MW
AiNET Laurel Data Center (WDC11) Laurel, Prince George's County 51 mi Running AiNET 6 MW
Centersquare Silver Spring Data Center (DCA1 / Prosperity Drive) Silver Spring, Montgomery County 52 mi Running Centersquare 16 MW

Blank cell: not disclosed by any source on file.

Common questions about Amazon Web Services Calvert Cliffs Data Center Proposal

Answered directly from the verified filings and local actions on this page.

Who is building Amazon Web Services Calvert Cliffs Data Center Proposal?

Amazon Web Services is the developer. No construction contractor is named on the record yet.

How much power and water does Amazon Web Services Calvert Cliffs Data Center Proposal say it needs?

Power: 500 MW (the developer's figure, yahoo.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Amazon Web Services Calvert Cliffs Data Center Proposal stand today?

It is cancelled; the date it reached that stage is not sourced, only the day a page was read. The newest entry, reported September 2, 2026: Amazon Web Services is developing more than 777,000 square feet of data center space across four buildings at Quantum Frederick campus near Adamstown [9].

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. AWS Data Center Withdrawal Signals Growing Political, Community Challenges - Data Center Knowledge (opens in a new tab), Data Center Knowledge, August 11, 2026, trade press
  2. AWS pulls out of planned data center campus next to Maryland nuclear plant - Data Center Dynamics (opens in a new tab), Data Center Dynamics, August 5, 2026, trade press
  3. AWS Data Center Withdrawal Signals Growing Political, Community Challenges - Data Center Knowledge (opens in a new tab), Data Center Knowledge, August 11, 2026, trade press
  4. Amazon abandons plans for data center campus at Calvert Cliffs - Maryland Matters (opens in a new tab), Maryland Matters, August 4, 2026, national outlet
  5. Calvert Commissioners Pass 6-Month Data Center Moratorium - - The Southern Maryland Chronicle (opens in a new tab), - The Southern Maryland Chronicle, August 19, 2026, local outlet
  6. Calvert County commissioners pass 6-month data center moratorium - FOX 5 DC (opens in a new tab), FOX 5 DC, August 18, 2026, local outlet
  7. How one Maryland county defeated an Amazon data center - The Baltimore Banner (opens in a new tab), The Baltimore Banner, August 11, 2026, local outlet
  8. Gov. Wes Moore evolves on data centers as Amazon project surges ahead (opens in a new tab), www.baltimoresun.com, September 3, 2026, local outlet
  9. Gov. Wes Moore evolves on data centers as Amazon project surges ahead - WBFF (opens in a new tab), WBFF, September 2, 2026, local outlet
  10. Gov. Wes Moore evolves on data centers as Amazon project surges ahead - WBFF (opens in a new tab), WBFF, September 2, 2026, local outlet
  11. How one Maryland county defeated an Amazon data center - The Baltimore Banner (opens in a new tab), The Baltimore Banner, August 11, 2026, local outlet
  12. Calvert County approves 6-month data center moratorium after Amazon pullout - WJLA (opens in a new tab), WJLA, August 18, 2026, local outlet
3 more sources
  1. Amazon abandons plans for data center campus at Md.’s Calvert Cliffs nuclear plant - WTOP News (opens in a new tab), WTOP News, August 4, 2026, local outlet
  2. Six-month moratorium on data centers approved in Calvert - somdnews.com (opens in a new tab), somdnews.com, August 18, 2026, local outlet
  3. Calvert County commissioners pass 6 month data center moratorium - FOX 5 DC (opens in a new tab), FOX 5 DC, August 18, 2026, local outlet

15 sources on file.

Regional grid context

This site is in the RFC East (RFCE) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Amazon Web Services Calvert Cliffs Data Center Proposal", https://datacenterrecord.org/projects/amazon-aws-data-center-campus-at-calvert-cliffs-md, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Amazon Web Services Calvert Cliffs Data Center Proposal", https://datacenterrecord.org/projects/amazon-aws-data-center-campus-at-calvert-cliffs-md. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Stalled or cancelled
Tier
built from one source
Tags
Built from one source
Coordinates
38.4315, -76.4425
How the location is known
Location from the site's street address.
Location source
https://www.calvertcountymd.gov/
Coordinate source
Calvert County Board of County Commissioners Moratorium Docket
Location last verified
September 16, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
500 MW, the developer's figure
Published
September 5, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Amazon Web Services Calvert Cliffs Data Center Proposal · 15 sources, 13 entries · basis and source tier on every row · verified November 6, 2026

Download CSV JSON