Atlantech Online operates a network colocation facility at 1010 Wayne Avenue in downtown Silver Spring, Montgomery County, Maryland, with 3 MW of power capacity. [1] Filings on the record specify 1 planned or operational building. [1] Verified facility status from Maryland state agency permits, utility dockets, municipal planning filings, or operator campus specifications. [1]
Equivalent to ~2,490 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.1% of Hoover Dam nameplate capacity (2,080 MW).
Grid interconnection and utility service tracked on file.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 1010 Wayne Avenue, Silver Spring, MD 20910.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Sources:
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Atlantech Online Silver Spring Data Center.
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | 3 MW | 3 MW | the developer's figure [1] atlantech.net |
| Site Footprint (Acres) | |||
| Data Hall Buildings | 1 building | 1 | operator page [1] atlantech.net |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Acts of Montgomery County and Silver Spring about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Montgomery County | Montgomery County, Maryland approved 18 month pause on data center reviews in July 2026 | commercialobserver.com (opens in a new tab) | |
| Montgomery County | Judge ruled that Preserve Montgomery County can continue to pursue claims that the county did not adequately inform the community about data centers | komu.com (opens in a new tab) | |
| Montgomery County | Montgomery County Council extended its data center pause from six months to 18 months | marylandmatters.org (opens in a new tab) | |
| Montgomery County | The vote passed unanimously | nbcwashington.com (opens in a new tab) | |
| Montgomery County | Montgomery County Council voted unanimously on July 28, 2026 for an 18 month moratorium on new data centers of 25 megawatts or more, the threshold as reported by Bisnow | nbcwashington.com (opens in a new tab) |
Chronological regulatory, corporate and permitting events on the record, newest first.
No dated entry is on the record yet.
Read on October 27, 2026 (the day the page was read; it gives no date of its own)
Verified facility status from Maryland state agency permits, utility dockets, municipal planning filings, or operator campus specifications.
Verified data center records in Maryland within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Centersquare Silver Spring Data Center (DCA1 / Prosperity Drive) Silver Spring, Montgomery County | 6 mi | Running | Centersquare | 16 MW |
| AiNET Beltsville Data Center Campus Beltsville, Prince George's County | 8 mi | Running | AiNET | 20 MW |
| Atlantech Online Rockville Data Center Rockville, Montgomery County | 9 mi | Running | Atlantech Online | 4 MW |
| Lerner Enterprises Landover Mall Data Center Campus Proposal Landover, Prince George's County | 10 mi | Proposed | Lerner Enterprises | 200 MW |
| AiNET Laurel Data Center (WDC11) Laurel, Prince George's County | 12 mi | Running | AiNET | 6 MW |
| Cogent Communications Elkridge Data Center Elkridge, Howard County | 21 mi | Running | Cogent Communications | 4 MW |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Atlantech Online is the developer. No construction contractor is named on the record yet.
Power: 3 MW (the developer's figure, atlantech.net (opens in a new tab)). Water: not disclosed by any source on file.
It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
Montgomery County (rated closed): Montgomery County, Maryland approved 18 month pause on data center reviews in July 2026 (reported September 23, 2026, commercialobserver.com (opens in a new tab)); and Montgomery County: Judge ruled that Preserve Montgomery County can continue to pursue claims that the county did not adequately inform the community about data centers (reported September 20, 2026, komu.com (opens in a new tab)). 5 events are on the county's rows; a rule about the area is not a decision about this record.
1 source on file.
This site is in the RFC East (RFCE) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Atlantech Online Silver Spring Data Center. Last verified October 27, 2026. https://datacenterrecord.org/projects/atlantech-online-silver-spring-md. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about Atlantech Online Silver Spring Data Center
Data Center Record, "Atlantech Online Silver Spring Data Center", https://datacenterrecord.org/projects/atlantech-online-silver-spring-md. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.