● Running Announced October 27, 2026 · 1 Building · AiNET

AiNET Glen Burnie CyberNAP Data Center (MD-790R)

Street address 7900 Ritchie Highway, Glen Burnie, MD 21061, Anne Arundel County verified address Exact, at the address [1] echo.epa.gov

Overview, regulatory gates and specifications

AiNET operates its CyberNAP MD790R Tier 4 colocation data center at 7900 Ritchie Highway in Glen Burnie, Anne Arundel County, Maryland, providing 12 MW of critical power capacity. [1] Filings on the record specify 1 planned or operational building. [2] Verified facility status from Maryland state agency permits, utility dockets, municipal planning filings, or operator campus specifications. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Maryland Department of the E
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [2]
12 MW
the developer's figure

Equivalent to ~9,960 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.6% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 7900 Ritchie Highway, Glen Burnie, MD 21061.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
12 MW developer figure Equivalent to the continuous electricity demand of about 9,960 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 0.1 percent of New York City's summer peak demand in 2024.
[2] ainet.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[2] ainet.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2012 (14 years)
Who leads it
AiNET as stated by the source
[2] ainet.com
State permit status
Maryland Department of the Environment Stationary Emergency Generator and Commercial Facility Record (7900 Ritchie Highway, Glen Burnie, MD 21061) the state's permit register, as of November 6, 2026
[1] echo.epa.gov
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. AiNET Glen Burnie CyberNAP Data Center (MD-790R), capacity: 12 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 12 ÷ 10,245 = 0.0012 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: AiNET
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for AiNET Glen Burnie CyberNAP Data Center (MD-790R).

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 12 MW 12 MW the developer's figure [2] ainet.com
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page [2] ainet.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Anne Arundel County and Glen Burnie about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Anne Arundel County closed Anne Arundel County Council approved a 15 month moratorium on new data center construction capitalgazette.com (opens in a new tab)
Anne Arundel County closed Anne Arundel County Council approved 15 month moratorium on data center development expiring January 2028, downgrading from proposed ban govtech.com (opens in a new tab)
Anne Arundel County closed An outright data center ban was previously introduced in August by 3rd District Councilmember Nathan Volke; the moratorium represents a shift away from that approach. patch.com (opens in a new tab)
Anne Arundel County closed The moratorium was introduced by 4th District Councilmember Julie Hummer and would not impact any data centers already in development. patch.com (opens in a new tab)
Anne Arundel County closed Anne Arundel County Council unanimously passed a 15 month data center moratorium on Monday, September 22, 2026. patch.com (opens in a new tab)
Anne Arundel County closed Bill would not apply to centers built on federal land or operated by government; Anne Arundel's Office of Planning and Zoning lists two operational data centers thebanner.com (opens in a new tab)
2 earlier decisions on the county's rows
DateWhoDecisionSource
Anne Arundel County closed Volke's bill would write data centers out of county zoning code and remove designated areas where data centers can be built thebanner.com (opens in a new tab)
Anne Arundel County closed Council member Nathan Volke's bill to ban data centers set for public hearing on September 21 thebanner.com (opens in a new tab)

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on October 27, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from Maryland state agency permits, utility dockets, municipal planning filings, or operator campus specifications.

    [1] echo.epa.gov

Nearest data centers in Maryland

Verified data center records in Maryland within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
TierPoint Baltimore BWI Data Center Linthicum Heights, Anne Arundel County 5 mi Running TierPoint 6 MW
Cogent Communications Elkridge Data Center Elkridge, Howard County 7 mi Running Cogent Communications 4 MW
TierPoint Baltimore Russell Street Data Center Baltimore, Baltimore city 9 mi Running TierPoint 6 MW
Zayo and Candler Building Baltimore Carrier Hotel (111 Market Place) Baltimore, Baltimore city 10 mi Running Zayo Group 6 MW
Lumen Technologies Baltimore Carrier Hotel Data Center Baltimore, Baltimore city 10 mi Running Lumen Technologies 6 MW
AiNET Laurel Data Center (WDC11) Laurel, Prince George's County 13 mi Running AiNET 6 MW

Blank cell: not disclosed by any source on file.

Common questions about AiNET Glen Burnie CyberNAP Data Center (MD-790R)

Answered directly from the verified filings and local actions on this page.

Who is building AiNET Glen Burnie CyberNAP Data Center (MD-790R)?

AiNET is the developer, ainet.com (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does AiNET Glen Burnie CyberNAP Data Center (MD-790R) say it needs?

Power: 12 MW (the developer's figure, ainet.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does AiNET Glen Burnie CyberNAP Data Center (MD-790R) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Glen Burnie or Anne Arundel County decided about it?

Anne Arundel County (rated closed): Anne Arundel County Council approved a 15 month moratorium on new data center construction (October 5, 2026, capitalgazette.com (opens in a new tab)); and Anne Arundel County: Anne Arundel County Council approved 15 month moratorium on data center development expiring January 2028, downgrading from proposed ban (reported September 22, 2026, govtech.com (opens in a new tab)). 8 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. US EPA ECHO and Maryland Department of the Environment Stationary Generator & Parcel Record (7900 Ritchie Highway, Glen Burnie, MD 21061) (opens in a new tab), U.S. Environmental Protection Agency and Maryland Department of the Environment, November 6, 2026
  2. AiNET Facility Specifications (7900 Ritchie Highway, Glen Burnie, MD 21061) (opens in a new tab), AiNET, November 6, 2026

2 sources on file.

Regional grid context

This site is in the RFC East (RFCE) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "AiNET Glen Burnie CyberNAP Data Center (MD-790R)", https://datacenterrecord.org/projects/ainet-md790r-glen-burnie-md, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "AiNET Glen Burnie CyberNAP Data Center (MD-790R)", https://datacenterrecord.org/projects/ainet-md790r-glen-burnie-md. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
39.1412, -76.6125
How the location is known
Location from the site's street address.
Location source
https://www.ainet.com/
Coordinate source
Maryland SDAT / AiNET Glen Burnie specification
How capacity was disclosed
the developer's figure
Capacity, if disclosed
12 MW, the developer's figure
Rating of the county's rows
Closed
Published
October 21, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection