Data Center Record.
Census GEOID: 24510 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 2 primary and local sources

● Running Announced October 27, 2026 · 1 Building · Lumen Technologies

Lumen Technologies Baltimore Carrier Hotel Data Center

Street address 300 West Lexington Street, Baltimore, MD 21201, Baltimore city verified address Exact, at the address [1] echo.epa.gov

Overview, regulatory gates and specifications

Lumen Technologies operates a downtown Baltimore colocation and network interconnection hub at 300 West Lexington Street in Baltimore, Maryland, with 6 MW of capacity. [1] Filings on the record specify 1 planned or operational building. [2] Verified facility status from Maryland state agency permits, utility dockets, municipal planning filings, or operator campus specifications. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Maryland Department of the E
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [2]
6 MW
the developer's figure

Equivalent to ~4,980 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.3% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 300 West Lexington Street, Baltimore, MD 21201.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
6 MW developer figure Equivalent to the continuous electricity demand of about 4,980 average U.S. homes based on U.S. Energy Information Administration residential consumption data. Less than 0.1 percent (0.059 percent) of New York City's summer peak demand in 2024.
[2] lumen.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[2] lumen.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2018 (8 years)
Who leads it
Lumen Technologies as stated by the source
[2] lumen.com
State permit status
Maryland Department of the Environment Stationary Emergency Generator and Commercial Facility Record (300 West Lexington Street, Baltimore, MD 21201) the state's permit register, as of November 6, 2026
[1] echo.epa.gov
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Lumen Technologies Baltimore Carrier Hotel Data Center, capacity: 6 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 6 ÷ 10,245 = 0.00059 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Lumen Technologies
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Lumen Technologies Baltimore Carrier Hotel Data Center.

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 6 MW 6 MW the developer's figure [2] lumen.com
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page [2] lumen.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Baltimore city and Baltimore about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Baltimore City case by case City Council discussed data center pros and cons during a Public Health and Environment Committee hearing. baltimoresun.com (opens in a new tab)
Baltimore City case by case Baltimore has staunched the creation of data centers within city limits. baltimoresun.com (opens in a new tab)
Baltimore City case by case Baltimore City one year moratorium on large data centers took effect in July, applies to facilities capable of using 10 megawatts or more wmar2news.com (opens in a new tab)
Baltimore City case by case Baltimore has a one year moratorium on data centers expiring next year wbaltv.com (opens in a new tab)
Baltimore City case by case Planning Commission said Health Department does not have staff, funding or data rights to conduct required assessment review wbaltv.com (opens in a new tab)
Baltimore City case by case Developers must complete a health equity self assessment studying pollution, drinking water, noise and traffic within 1.5 miles of proposed site wbaltv.com (opens in a new tab)
2 earlier decisions on the county's rows
DateWhoDecisionSource
Baltimore City case by case Council Bill 26-0174 would allow data centers using less than 10 megawatts in specific industrial zones around Canton and Curtis Bay wbaltv.com (opens in a new tab)
Baltimore City case by case Baltimore city bill proposed to pause data center construction wbaltv.com (opens in a new tab)

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on October 27, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from Maryland state agency permits, utility dockets, municipal planning filings, or operator campus specifications.

    [1] echo.epa.gov

Nearest data centers in Maryland

Verified data center records in Maryland within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Zayo and Candler Building Baltimore Carrier Hotel (111 Market Place) Baltimore, Baltimore city Less than 1 mi Running Zayo Group 6 MW
TierPoint Baltimore Russell Street Data Center Baltimore, Baltimore city 1 mi Running TierPoint 6 MW
TierPoint Baltimore BWI Data Center Linthicum Heights, Anne Arundel County 7 mi Running TierPoint 6 MW
Cogent Communications Elkridge Data Center Elkridge, Howard County 9 mi Running Cogent Communications 4 MW
AiNET Glen Burnie CyberNAP Data Center (MD-790R) Glen Burnie, Anne Arundel County 10 mi Running AiNET 12 MW
Expedient Baltimore Owings Mills Data Center Owings Mills, Baltimore County 13 mi Running Expedient 6 MW

Blank cell: not disclosed by any source on file.

Common questions about Lumen Technologies Baltimore Carrier Hotel Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Lumen Technologies Baltimore Carrier Hotel Data Center?

Lumen Technologies is the developer, lumen.com (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Lumen Technologies Baltimore Carrier Hotel Data Center say it needs?

Power: 6 MW (the developer's figure, lumen.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Lumen Technologies Baltimore Carrier Hotel Data Center stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Baltimore or Baltimore city decided about it?

Baltimore City (rated case by case): City Council discussed data center pros and cons during a Public Health and Environment Committee hearing (reported September 24, 2026, baltimoresun.com (opens in a new tab)); and Baltimore City: Baltimore has staunched the creation of data centers within city limits (reported September 24, 2026, baltimoresun.com (opens in a new tab)). 8 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. US EPA ECHO and Maryland Department of the Environment Stationary Generator & Parcel Record (300 West Lexington Street, Baltimore, MD 21201) (opens in a new tab), U.S. Environmental Protection Agency and Maryland Department of the Environment, November 6, 2026
  2. Lumen Technologies Facility Specifications (300 West Lexington Street, Baltimore, MD 21201) (opens in a new tab), Lumen Technologies, November 6, 2026

2 sources on file.

Regional grid context

This site is in the RFC East (RFCE) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Lumen Technologies Baltimore Carrier Hotel Data Center", https://datacenterrecord.org/projects/lumen-baltimore-md, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Lumen Technologies Baltimore Carrier Hotel Data Center", https://datacenterrecord.org/projects/lumen-baltimore-md. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
39.2912, -76.6205
How the location is known
Location from the site's street address.
Location source
https://www.lumen.com/
Coordinate source
Maryland SDAT / Lumen Baltimore specification
How capacity was disclosed
the developer's figure
Capacity, if disclosed
6 MW, the developer's figure
Rating of the county's rows
Case by case
Published
October 21, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection

Researcher view · Lumen Technologies Baltimore Carrier Hotel Data Center · 2 sources, 1 entry, 8 decisions nearby · basis and source tier on every row · verified November 6, 2026

Download CSV JSON