Data Center Record.
Census GEOID: 24005 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary and local source

● Running Announced October 27, 2026 · 1 Building · Expedient

Expedient Baltimore Owings Mills Data Center

Street address 11155 Red Run Boulevard, Owings Mills, MD 21117, Baltimore County verified address Exact, at the address [1] expedient.com

Overview, regulatory gates and specifications

Expedient operates its Baltimore metro enterprise cloud and colocation data center at 11155 Red Run Boulevard in Owings Mills, Baltimore County, Maryland, with 6 MW of critical IT load. [1] Filings on the record specify 1 planned or operational building. [1] Verified facility status from Maryland state agency permits, utility dockets, municipal planning filings, or operator campus specifications. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
6 MW
the developer's figure

Equivalent to ~4,980 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.3% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 11155 Red Run Boulevard, Owings Mills, MD 21117.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
6 MW developer figure Equivalent to the continuous electricity demand of about 4,980 average U.S. homes based on U.S. Energy Information Administration residential consumption data. Less than 0.1 percent (0.059 percent) of New York City's summer peak demand in 2024.
[1] expedient.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[1] expedient.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2014 (12 years)
Who leads it
Expedient as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Expedient Baltimore Owings Mills Data Center, capacity: 6 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 6 ÷ 10,245 = 0.00059 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Expedient
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Expedient Baltimore Owings Mills Data Center.

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 6 MW 6 MW the developer's figure [1] expedient.com
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page [1] expedient.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Baltimore County and Owings Mills about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Baltimore County closed Baltimore County Council unanimously passed a data center moratorium that expires in December 2027. wypr.org (opens in a new tab)
Baltimore County closed Baltimore County Council voted to extend data center moratorium through December 2027. patch.com (opens in a new tab)
Baltimore County closed Baltimore County Council extended moratorium on new data center development through December 31, 2027, passed unanimously September 22 wmar2news.com (opens in a new tab)
Baltimore County closed Baltimore County Planning Board unanimously approved report recommending strict limits on data centers dundalkeagle.com (opens in a new tab)
Baltimore County closed Baltimore County Council voted unanimously to extend moratorium on building new data centers through end of 2027 dundalkeagle.com (opens in a new tab)
Baltimore County closed Baltimore County extended its pause on data center development through end of 2027. baltimoresun.com (opens in a new tab)
14 earlier decisions on the county's rows
DateWhoDecisionSource
Baltimore County closed Baltimore County Council voted to extend its moratorium on data centers through 2027 cbsnews.com (opens in a new tab)
Baltimore County closed Baltimore County Council voted unanimously to extend the data center moratorium through at least the end of 2027 wypr.org (opens in a new tab)
Baltimore County closed Baltimore County Council voted unanimously Tuesday evening to extend the moratorium on building new data centers in the county until December 2027 wbaltv.com (opens in a new tab)
Baltimore County closed Baltimore County Council scheduled a vote for Tuesday to decide whether to extend the data center development moratorium to December 2027, with current moratorium ending January 1. wmar2news.com (opens in a new tab)
Baltimore County closed Baltimore County Council will vote on September 23, 2026 to extend its data center moratorium, originally implemented in February 2026, through the end of 2027 to allow time for developing regulations addressing environmental and infrastructure concerns. patch.com (opens in a new tab)
Baltimore County closed Baltimore County Planning Board approved a data center report on September 17, 2026 that recommended stricter oversight. patch.com (opens in a new tab)
Baltimore County closed Baltimore County Planning Board approved a data center report on September 17, 2026 containing 20 amendments. patch.com (opens in a new tab)
Baltimore County closed Planning board is expected to vote on the report on September 17 and send it to the County Council. wbaltv.com (opens in a new tab)
Baltimore County closed In February 2026, the Baltimore County Council tasked the planning board to come up with a comprehensive report on data centers and their impacts. wbaltv.com (opens in a new tab)
Baltimore County closed Baltimore County Planning Board held public hearing on data center study report on September 3, 2026. wbaltv.com (opens in a new tab)
Baltimore County closed The Baltimore County Planning Board has yet to finalize the report that was supposed to help determine how data centers should be regulated baltimoresun.com (opens in a new tab)
Baltimore County closed Baltimore County Council is seeking to extend its existing moratorium on data centers for another year baltimoresun.com (opens in a new tab)
Baltimore County closed Baltimore County Council is seeking to extend the county's existing moratorium on data center development for another year to allow time for public input and finalization of Planning Board regulations baltimoresun.com (opens in a new tab)
Baltimore County closed In February, the Council voted to impose a moratorium on data centers while the planning board conducted a report on their impacts wbaltv.com (opens in a new tab)

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on October 27, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from Maryland state agency permits, utility dockets, municipal planning filings, or operator campus specifications.

    [1] expedient.com

1 correction to this record

Every correction, with its reason
  1. · Place

    Expedient's Owings Mills facility is in Owings Mills in Baltimore County; the City of Baltimore is an independent city outside Baltimore County, so the record files it under Owings Mills.

Every correction on the record is on the corrections page.

Nearest data centers in Maryland

Verified data center records in Maryland within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Lumen Technologies Baltimore Carrier Hotel Data Center Baltimore, Baltimore city 13 mi Running Lumen Technologies 6 MW
TierPoint Baltimore Russell Street Data Center Baltimore, Baltimore city 14 mi Running TierPoint 6 MW
Zayo and Candler Building Baltimore Carrier Hotel (111 Market Place) Baltimore, Baltimore city 14 mi Running Zayo Group 6 MW
Cogent Communications Elkridge Data Center Elkridge, Howard County 17 mi Running Cogent Communications 4 MW
TierPoint Baltimore BWI Data Center Linthicum Heights, Anne Arundel County 17 mi Running TierPoint 6 MW
AiNET Glen Burnie CyberNAP Data Center (MD-790R) Glen Burnie, Anne Arundel County 22 mi Running AiNET 12 MW

Blank cell: not disclosed by any source on file.

Common questions about Expedient Baltimore Owings Mills Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Expedient Baltimore Owings Mills Data Center?

Expedient is the developer. No construction contractor is named on the record yet.

How much power and water does Expedient Baltimore Owings Mills Data Center say it needs?

Power: 6 MW (the developer's figure, expedient.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Expedient Baltimore Owings Mills Data Center stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Owings Mills or Baltimore County decided about it?

Baltimore County (rated closed): Baltimore County Council unanimously passed a data center moratorium that expires in December 2027 (reported October 1, 2026, wypr.org (opens in a new tab)); and Baltimore County: Baltimore County Council voted to extend data center moratorium through December 2027 (September 23, 2026, patch.com (opens in a new tab)). 20 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Expedient Baltimore Owings Mills Data Center Official Disclosure (opens in a new tab), Expedient, news outlet

1 source on file.

Regional grid context

This site is in the RFC East (RFCE) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Expedient Baltimore Owings Mills Data Center", https://datacenterrecord.org/projects/expedient-baltimore-owings-mills-md, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Expedient Baltimore Owings Mills Data Center", https://datacenterrecord.org/projects/expedient-baltimore-owings-mills-md. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
39.4245, -76.8012
How the location is known
Location from the site's street address.
Location source
https://www.expedient.com/data-centers/
Coordinate source
Maryland SDAT / Expedient Owings Mills specification
How capacity was disclosed
the developer's figure
Capacity, if disclosed
6 MW, the developer's figure
Rating of the county's rows
Closed
Published
October 21, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection

Researcher view · Expedient Baltimore Owings Mills Data Center · 1 source, 1 entry, 20 decisions nearby · basis and source tier on every row · verified October 27, 2026

Download CSV JSON