Expedient operates its Baltimore metro enterprise cloud and colocation data center at 11155 Red Run Boulevard in Owings Mills, Baltimore County, Maryland, with 6 MW of critical IT load. [1] Filings on the record specify 1 planned or operational building. [1] Verified facility status from Maryland state agency permits, utility dockets, municipal planning filings, or operator campus specifications. [1]
Equivalent to ~4,980 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.3% of Hoover Dam nameplate capacity (2,080 MW).
Grid interconnection and utility service tracked on file.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 11155 Red Run Boulevard, Owings Mills, MD 21117.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Sources:
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Expedient Baltimore Owings Mills Data Center.
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | 6 MW | 6 MW | the developer's figure [1] expedient.com |
| Site Footprint (Acres) | |||
| Data Hall Buildings | 1 building | 1 | operator page [1] expedient.com |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Acts of Baltimore County and Owings Mills about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Baltimore County | Baltimore County Council unanimously passed a data center moratorium that expires in December 2027. | wypr.org (opens in a new tab) | |
| Baltimore County | Baltimore County Council voted to extend data center moratorium through December 2027. | patch.com (opens in a new tab) | |
| Baltimore County | Baltimore County Council extended moratorium on new data center development through December 31, 2027, passed unanimously September 22 | wmar2news.com (opens in a new tab) | |
| Baltimore County | Baltimore County Planning Board unanimously approved report recommending strict limits on data centers | dundalkeagle.com (opens in a new tab) | |
| Baltimore County | Baltimore County Council voted unanimously to extend moratorium on building new data centers through end of 2027 | dundalkeagle.com (opens in a new tab) | |
| Baltimore County | Baltimore County extended its pause on data center development through end of 2027. | baltimoresun.com (opens in a new tab) |
| Date | Who | Decision | Source |
|---|---|---|---|
| Baltimore County | Baltimore County Council voted to extend its moratorium on data centers through 2027 | cbsnews.com (opens in a new tab) | |
| Baltimore County | Baltimore County Council voted unanimously to extend the data center moratorium through at least the end of 2027 | wypr.org (opens in a new tab) | |
| Baltimore County | Baltimore County Council voted unanimously Tuesday evening to extend the moratorium on building new data centers in the county until December 2027 | wbaltv.com (opens in a new tab) | |
| Baltimore County | Baltimore County Council scheduled a vote for Tuesday to decide whether to extend the data center development moratorium to December 2027, with current moratorium ending January 1. | wmar2news.com (opens in a new tab) | |
| Baltimore County | Baltimore County Council will vote on September 23, 2026 to extend its data center moratorium, originally implemented in February 2026, through the end of 2027 to allow time for developing regulations addressing environmental and infrastructure concerns. | patch.com (opens in a new tab) | |
| Baltimore County | Baltimore County Planning Board approved a data center report on September 17, 2026 that recommended stricter oversight. | patch.com (opens in a new tab) | |
| Baltimore County | Baltimore County Planning Board approved a data center report on September 17, 2026 containing 20 amendments. | patch.com (opens in a new tab) | |
| Baltimore County | Planning board is expected to vote on the report on September 17 and send it to the County Council. | wbaltv.com (opens in a new tab) | |
| Baltimore County | In February 2026, the Baltimore County Council tasked the planning board to come up with a comprehensive report on data centers and their impacts. | wbaltv.com (opens in a new tab) | |
| Baltimore County | Baltimore County Planning Board held public hearing on data center study report on September 3, 2026. | wbaltv.com (opens in a new tab) | |
| Baltimore County | The Baltimore County Planning Board has yet to finalize the report that was supposed to help determine how data centers should be regulated | baltimoresun.com (opens in a new tab) | |
| Baltimore County | Baltimore County Council is seeking to extend its existing moratorium on data centers for another year | baltimoresun.com (opens in a new tab) | |
| Baltimore County | Baltimore County Council is seeking to extend the county's existing moratorium on data center development for another year to allow time for public input and finalization of Planning Board regulations | baltimoresun.com (opens in a new tab) | |
| Baltimore County | In February, the Council voted to impose a moratorium on data centers while the planning board conducted a report on their impacts | wbaltv.com (opens in a new tab) |
Chronological regulatory, corporate and permitting events on the record, newest first.
No dated entry is on the record yet.
Read on October 27, 2026 (the day the page was read; it gives no date of its own)
Verified facility status from Maryland state agency permits, utility dockets, municipal planning filings, or operator campus specifications.
· Place
Expedient's Owings Mills facility is in Owings Mills in Baltimore County; the City of Baltimore is an independent city outside Baltimore County, so the record files it under Owings Mills.
Every correction on the record is on the corrections page.
Verified data center records in Maryland within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Lumen Technologies Baltimore Carrier Hotel Data Center Baltimore, Baltimore city | 13 mi | Running | Lumen Technologies | 6 MW |
| TierPoint Baltimore Russell Street Data Center Baltimore, Baltimore city | 14 mi | Running | TierPoint | 6 MW |
| Zayo and Candler Building Baltimore Carrier Hotel (111 Market Place) Baltimore, Baltimore city | 14 mi | Running | Zayo Group | 6 MW |
| Cogent Communications Elkridge Data Center Elkridge, Howard County | 17 mi | Running | Cogent Communications | 4 MW |
| TierPoint Baltimore BWI Data Center Linthicum Heights, Anne Arundel County | 17 mi | Running | TierPoint | 6 MW |
| AiNET Glen Burnie CyberNAP Data Center (MD-790R) Glen Burnie, Anne Arundel County | 22 mi | Running | AiNET | 12 MW |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Expedient is the developer. No construction contractor is named on the record yet.
Power: 6 MW (the developer's figure, expedient.com (opens in a new tab)). Water: not disclosed by any source on file.
It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
Baltimore County (rated closed): Baltimore County Council unanimously passed a data center moratorium that expires in December 2027 (reported October 1, 2026, wypr.org (opens in a new tab)); and Baltimore County: Baltimore County Council voted to extend data center moratorium through December 2027 (September 23, 2026, patch.com (opens in a new tab)). 20 events are on the county's rows; a rule about the area is not a decision about this record.
1 source on file.
This site is in the RFC East (RFCE) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Expedient Baltimore Owings Mills Data Center. Last verified October 27, 2026. https://datacenterrecord.org/projects/expedient-baltimore-owings-mills-md. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Expedient Baltimore Owings Mills Data Center
Data Center Record, "Expedient Baltimore Owings Mills Data Center", https://datacenterrecord.org/projects/expedient-baltimore-owings-mills-md. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.