● Proposed Campus First recorded September 5, 2026

One Nuclear / Project Cayman Data Center Campus

Location Vermilion Parish, Louisiana parish centroid Parish level, the parish seat

Overview, regulatory gates and specifications

ONE Nuclear Energy executed a binding letter of intent to develop a 2.88 GW gas fired plant and large battery energy storage system to power a co located data center campus in Louisiana near SpaceX's Starbase project. [3]

Verified Site & Permit Summary
Verified address
Vermilion Parish, Louisiana parish centroid
Operator / developer
ONE Nuclear Energy
Permit / registry ID
Business Wire on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
ONE Nuclear Energy as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: ONE Nuclear Energy
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for One Nuclear / Project Cayman Data Center Campus.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 2.88 GW Disclosed filing [3] businesswire.com
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

7 corrections to this record

Every correction, with its reason
  1. · County (Vermilion to Vermilion Parish)

    Louisiana's county equivalents are parishes, as the Census Bureau names them; the record stored Vermilion, which the pages printed as Vermilion County, and its page sat apart from the parish's own.

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  4. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  5. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  6. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  7. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Louisiana

Verified data center records in Louisiana within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
SpaceX Starbase Louisiana / orbital data center Vermilion Parish Less than 1 mi Proposed SpaceX

Blank cell: not disclosed by any source on file.

Common questions about One Nuclear / Project Cayman Data Center Campus

Answered directly from the verified filings and local actions on this page.

Who is building One Nuclear / Project Cayman Data Center Campus?

ONE Nuclear Energy is the developer. No construction contractor is named on the record yet.

How much power and water does One Nuclear / Project Cayman Data Center Campus say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does One Nuclear / Project Cayman Data Center Campus stand today?

It is reported; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. One Nuclear inks binding LOI to develop 2.88GW gas plant and BESS to power data center in Louisiana - Data Center Dynamics (opens in a new tab), Data Center Dynamics, September 1, 2026, trade press
  2. One Nuclear inks binding LOI to develop 2.88GW gas plant and BESS to power data center in Louisiana (opens in a new tab), Data Center Dynamics, September 1, 2026, trade press
  3. ONE Nuclear Executes Binding LOI for Project Cayman, a 2.88 GW Louisiana Energy Project with Co-Located Data Center Campus - Business Wire (opens in a new tab), Business Wire, August 31, 2026, press release
  4. ONE Nuclear Energy secures Louisiana site for power, data center project - Daily Energy Insider (opens in a new tab), Daily Energy Insider, September 2, 2026, news outlet
  5. One Nuclear Signs Deal for 2.88-GW Gas-Fired Plant, Large BESS for Louisiana Data Center Campus - POWER Magazine (opens in a new tab), POWER Magazine, September 2, 2026, news outlet
  6. One Nuclear plans gas-fired data center near Musk’s Starbase - thecentersquare.com (opens in a new tab), thecentersquare.com, September 1, 2026, national outlet
  7. West Palm Beach energy developer plans data center campus near Louisiana SpaceX project - The Business Journals (opens in a new tab), The Business Journals, August 31, 2026, local outlet

7 sources on file.

Regional grid context

This site is in the SERC Mississippi Valley (SRMV) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "One Nuclear / Project Cayman Data Center Campus", https://datacenterrecord.org/projects/one-nuclear-project-cayman-data-center-campus-vermilion-la, last verified September 17, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "One Nuclear / Project Cayman Data Center Campus", https://datacenterrecord.org/projects/one-nuclear-project-cayman-data-center-campus-vermilion-la. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
29.9725, -92.12917
How the location is known
Location is the parish seat; exact site not disclosed.
Location source
Parish seat (Abbeville), Wikidata, placed at parish level
Coordinate source
wikidata parish seat
Location last verified
September 16, 2026
Capacity, if disclosed
2.88 GW, not disclosed
Published
September 5, 2026
Last verified
September 17, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the parish's rows

Researcher view · One Nuclear / Project Cayman Data Center Campus · 7 sources, 0 entries · basis and source tier on every row · verified September 17, 2026

Download CSV JSON