Meta Bowling Green Data Center

Street address 15800 Middleton Pike, Bowling Green, OH 43402, Wood County verified address Exact, at the address [1] Meta U.S. Data Centers fleet page for the Bowling Green Data Center at 15800 Middleton Pike, Bowling Green, Wood County, Ohio.

Overview, regulatory gates and specifications

Meta lists a data center at Bowling Green, Ohio among the sites it operates. [2] Filings on the record specify 1 planned or operational building. [1] Beth Cole reports Meta pile driving into bedrock as of article date [2]

Verified Site & Permit Summary
Verified address
15800 Middleton Pike, Bowling Green, OH 43402, Wood County verified address
Operator / developer
Meta
Permit / registry ID
Ohio Democrats - on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[1] datacenters.atmeta.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2025 (1 year)
Who leads it
Meta as stated by the source
[2] ohiodems.org
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Meta
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Meta Bowling Green Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page [1] datacenters.atmeta.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    Beth Cole reports Meta pile driving into bedrock as of article date

    [2] ohiodems.org

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Meta lists Meta Bowling Green Data Center at Bowling Green, Ohio on its own page of data center locations, read September 14, 2026.

    [1] datacenters.atmeta.com

Nearest data centers in Ohio

Verified data center records in Ohio within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Oregon data center (Oregon, Lucas County) Oregon, Lucas County ~19 mi Proposed Vantage Data Centers
Aligned NEO-01 Sandusky, Erie County 47 mi Running Aligned Data Centers 1 building
Decimal Digital Currency Project Eagle Ridge Monroeville, Huron County ~49 mi Proposed Decimal Digital Currency 100 MW

Blank cell: not disclosed by any source on file.

Common questions about Meta Bowling Green Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Meta Bowling Green Data Center?

Meta is the developer, ohiodems.org (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Meta Bowling Green Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Meta Bowling Green Data Center stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. The newest entry, reported September 15, 2026: Beth Cole reports Meta pile driving into bedrock as of article date [2].

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Meta: Our U.S. data center fleet (opens in a new tab), Meta, September 14, 2026

Reporting

  1. ICYMI: Ohioans In Bowling Green Rally Against Jon Husted For Bringing Hundreds of Data Centers to Ohio - Ohio Democrats - (opens in a new tab), Ohio Democrats -, September 15, 2026, local outlet

2 sources on file.

Regional grid context

This site is in the RFC West (RFCW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Meta Bowling Green Data Center", https://datacenterrecord.org/projects/meta-bowling-green-data-center-oh, last verified October 25, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Meta Bowling Green Data Center", https://datacenterrecord.org/projects/meta-bowling-green-data-center-oh. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
41.4162, -83.6215
How the location is known
Location from the site's street address.
Location source
Meta U.S. Data Centers fleet page for the Bowling Green Data Center at 15800 Middleton Pike, Bowling Green, Wood County, Ohio.
Coordinate source
operator address point
Location last verified
September 14, 2026
Published
September 14, 2026
Last verified
October 25, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Meta Bowling Green Data Center · 2 sources, 2 entries · basis and source tier on every row · verified October 25, 2026