Data Center Record.
Census GEOID: 39077 Location Precision: city centroid Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 2 primary and local sources

● Proposed Campus Announced October 30, 2026 · Decimal Digital Currency

Decimal Digital Currency Project Eagle Ridge

Location Monroeville, Huron County, Ohio city centroid Town level, the center of the city

Overview, regulatory gates and specifications

Decimal Digital Currency proposed Project Eagle Ridge, a 100 megawatt data center campus on 48 acres in the Fort Monroe Industrial Park in Monroeville, Huron County, Ohio. [2] Filings on the record specify disclosed capacity of 100 MW (the developer's figure). [2]

1. Land & Parcel
48 acres on file
2. Local Zoning
Not yet on file
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
100 MW disclosed
5. Air & Water Permits
Not yet on file
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand [2]
100 MW
the developer's figure

Equivalent to ~83,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 4.8% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
48 acres
the developer's figure

Building count not yet itemized in public filings.

Parcel boundaries and municipal zoning tracked.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
100 MW developer figure Equivalent to the continuous electricity demand of about 83,000 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 1 percent of New York City's summer peak demand in 2024.
[2] news5cleveland.com
Water usage
Not disclosed
Land area
48 acres developer figure
[2] news5cleveland.com
Buildings
Not disclosed
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Decimal Digital Currency as stated by the source
[2] news5cleveland.com
Official project website
decimalgroup.io (opens in a new tab) verified October 30, 2026
decimalgroup.io (opens in a new tab)
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Decimal Digital Currency Project Eagle Ridge, capacity: 100 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 100 ÷ 10,245 = 0.0098 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Decimal Digital Currency
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Decimal Digital Currency Project Eagle Ridge.

Field / Parameter Permitted / Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 100 MW the developer's figure [2] news5cleveland.com
Site Footprint (Acres) 48 acres 48 acres the developer's figure [2] news5cleveland.com
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Huron County and Monroeville about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Monroeville Monroeville voters rejected the council referred advisory question on allowing data center development within village limits on November 3, 2026, voting 190 yes (34.05 percent) to 368 no (65.95 percent). ballotpedia.org (opens in a new tab)
Monroeville Monroeville voters voted on a council referred advisory question on November 3, 2026 on allowing data center development within village limits. news5cleveland.com (opens in a new tab)

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

Nearest data centers in Ohio

Verified data center records in Ohio within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Aligned NEO-01 Sandusky, Erie County ~13 mi Running Aligned Data Centers 1 building
Oregon data center (Oregon, Lucas County) Oregon, Lucas County ~48 mi Proposed Vantage Data Centers
T5@Cleveland Cleveland, Cuyahoga County ~49 mi Running T5 Data Centers 1 building
Meta Bowling Green Data Center Bowling Green, Wood County ~49 mi Running Meta 1 building
DataBank Cleveland data center Cleveland, Cuyahoga County ~56 mi Running DataBank 1 building
H5 Cleveland Cleveland, Cuyahoga County ~56 mi Running H5 Data Centers 1 building

Blank cell: not disclosed by any source on file.

Common questions about Decimal Digital Currency Project Eagle Ridge

Answered directly from the verified filings and local actions on this page.

Who is building Decimal Digital Currency Project Eagle Ridge?

Decimal Digital Currency is the developer, news5cleveland.com (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Decimal Digital Currency Project Eagle Ridge say it needs?

Power: 100 MW (the developer's figure, news5cleveland.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Decimal Digital Currency Project Eagle Ridge stand today?

It is proposed; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Monroeville or Huron County decided about it?

Monroeville: Monroeville voters rejected the council referred advisory question on allowing data center development within village limits on November 3, 2026, voting 190 yes (34.05 percent) to 368 no (65.95 percent), ballotpedia.org (opens in a new tab); and Monroeville: Monroeville voters voted on a council referred advisory question on November 3, 2026 on allowing data center development within village limits, news5cleveland.com (opens in a new tab). 2 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Decimal Group official website (opens in a new tab), Decimal Digital Currency, October 15, 2026, trade press
  2. A small Huron County village is weighing a big data center with voter sentiment on the ballot - News 5 Cleveland (opens in a new tab), News 5 Cleveland, October 15, 2026, local outlet

2 sources on file.

Regional grid context

This site is in the RFC West (RFCW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Decimal Digital Currency Project Eagle Ridge", https://datacenterrecord.org/projects/decimal-digital-eagle-ridge-monroeville-oh, last verified October 31, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Decimal Digital Currency Project Eagle Ridge", https://datacenterrecord.org/projects/decimal-digital-eagle-ridge-monroeville-oh. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
41.2438, -82.7026
How the location is known
Location is the city center; exact site not disclosed.
Location source
Village of Monroeville, Huron County, Ohio (Census Gazetteer)
Coordinate source
Village of Monroeville, Huron County, Ohio (Census Gazetteer)
Location last verified
October 30, 2026
How capacity was disclosed
the developer's figure
How acreage was disclosed
the developer's figure
Capacity, if disclosed
100 MW, the developer's figure
Published
October 30, 2026
Last verified
October 31, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, Interconnection, Rating of the county's rows

Researcher view · Decimal Digital Currency Project Eagle Ridge · 2 sources, 0 entries, 2 decisions nearby · basis and source tier on every row · verified October 31, 2026

Download CSV JSON