Sources on this page
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Last verified: · 1 primary and 8 reporting sources
H5 Data Centers lists a data center at Cleveland, Ohio among the sites it operates. [2] Filings on the record specify 1 planned or operational building. [2] H5 Data Centers lists H5 Cleveland at Cleveland, Ohio on its own page of data center locations, read September 14, 2026. [1]
U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.
Utility interconnection queue filings monitored.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 1625 Rockwell Ave, Cleveland, OH 44114.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for H5 Cleveland.
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | |||
| Data Hall Buildings | 1 building | 1 | operator page |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Signal Cleveland report on Cleveland City Council and community proceedings in Cleveland, OH: Gov. Mike DeWine’s data center advice for Ohio cities and towns: Go make a deal (June 10, 2026).
"that is not is worried about data centers. Cut a good deal. You The deal's in your hands. You have the ability to do it. If you look at some of things that frankly have grown up around Columbus, the that local community, the local business people, everybody, they cut a deal with that data center. and so be aggressive. Go out there. don't just take what they"
"is a tax incentive. And we're just going to let it let it pause for a for a while and you know, give people the chance to kind of digest where where they are. But you're going to still see data centers come into Ohio without without that without that actual incentive. But if we need to add the incentive later, we can we can push that back in. It seemed the time to kind of take a deep breath. But I I think that you know, if you look at data centers, look, they're"
"water. You can build them two ways. You can build them the way they get to use massive amount of water or you can basically go through what I would call recycling and put them through the system. Costs more to do it. We have a right to insist they do that. We should insist that they do that. We should insist that the deal that they cut in regard to electricity does not end up costing consumers money. They got to pay their own way. They're making money. They can pay their own way. They should. But"
Using this data in a report? Support the record.
Chronological regulatory, corporate and permitting events on the record, newest first.
No dated entry is on the record yet.
Read on September 14, 2026 (the day the page was read; it gives no date of its own)
H5 Data Centers lists H5 Cleveland at Cleveland, Ohio on its own page of data center locations, read September 14, 2026.
Verified data center records in Ohio within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| DataBank Cleveland data center Cleveland, Cuyahoga County | Less than 1 mi | Running | DataBank | 1 building |
| T5@Cleveland Cleveland, Cuyahoga County | 8 mi | Running | T5 Data Centers | 1 building |
| Expedient Cleveland Cleveland, Cuyahoga County | 8 mi | Running | Expedient | 2 buildings |
| Ark Data Centers (Akron, OH) Akron, Summit County | 32 mi | Running | Ark Data Centers | 1 building |
| Aligned NEO-01 Sandusky, Erie County | 54 mi | Running | Aligned Data Centers | 1 building |
| Decimal Digital Currency Project Eagle Ridge Monroeville, Huron County | ~56 mi | Proposed | Decimal Digital Currency | 100 MW |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
H5 Data Centers is the developer. No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
Official operator or facility campus page verified in 50 state website discovery pass.
9 sources on file.
This site is in the RFC West (RFCW) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. H5 Cleveland. Last verified October 25, 2026. https://datacenterrecord.org/projects/h5-cleveland-oh. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about H5 Cleveland
Data Center Record, "H5 Cleveland", https://datacenterrecord.org/projects/h5-cleveland-oh. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.