● Proposed Campus First recorded September 5, 2026

Data Center El Dorado

Location El Dorado, Butler County, Kansas county centroid County level, the county seat

Overview, regulatory gates and specifications

Citizens in El Dorado, Kansas petitioned to ban data centers and a judge ruled in favor of the petition. [1]

Verified Site & Permit Summary
Verified address
El Dorado, Butler County, Kansas county centroid
Operator / developer
Not disclosed in filing
Permit / registry ID
KWCH on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
Not disclosed
Capital investment
Not disclosed
Not disclosed
Who leads it, Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Edward Wilson

El Dorado resident

DID Recorded statement at KWCH (August 24, 2026) [1]
SAID Edward Wilson, a resident of El Dorado, started the Protect the Heartland group dedicated to preventing high impact data centers from being built in the town (August 24, 2026) [1]

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Not disclosed
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Data Center El Dorado.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Who is behind it A land record, a zoning application or a company's own announcement.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

2 corrections to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Kansas

Nearest records are not computed for a record placed at a county seat. Browse all data centers in Kansas.

Common questions about Data Center El Dorado

Answered directly from the verified filings and local actions on this page.

Who is building Data Center El Dorado?

Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.

How much power and water does Data Center El Dorado say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Data Center El Dorado stand today?

It is reported; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Citizen group wins court fight over El Dorado data center petition - KWCH (opens in a new tab), KWCH, August 24, 2026, local outlet
  2. Judge rules in favor of El Dorado citizens' petition to ban data centers - kake.com (opens in a new tab), kake.com, August 21, 2026, local outlet
  3. As people demand answers, El Dorado city manager responds to data center concerns - kake.com (opens in a new tab), kake.com, August 17, 2026, local outlet

3 sources on file.

Regional grid context

This site is in the SPP North (SPNO) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Data Center El Dorado", https://datacenterrecord.org/projects/data-center-el-dorado-ks, last verified September 17, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Data Center El Dorado", https://datacenterrecord.org/projects/data-center-el-dorado-ks. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
37.8211, -96.8583
How the location is known
Location is the county seat; exact site not disclosed.
Location source
County seat (El Dorado), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location last verified
September 16, 2026
Published
September 5, 2026
Last verified
September 17, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Data Center El Dorado · 3 sources, 0 entries · basis and source tier on every row · verified September 17, 2026