Raeden proposed a 100 megawatt data center development in Gibraltar, Wayne County, Michigan, which was paused by a municipal moratorium and became the subject of litigation in August 2026. [1] Filings on the record specify disclosed capacity of 100 MW (the developer's figure), 2 planned or operational buildings. [1] Raeden's data center development in Gibraltar, Michigan was halted by a municipal moratorium, which the developer claims unlawfully stopped the project and has challenged in court. [1]
Equivalent to ~83,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 4.8% of Hoover Dam nameplate capacity (2,080 MW).
Grid interconnection and utility service tracked on file.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 28000 West Jefferson Avenue, Gibraltar, MI 48173.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Sources:
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Raeden Gibraltar Data Center.
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | 100 MW | the developer's figure [1] datacenterdynamics.com | |
| Site Footprint (Acres) | |||
| Data Hall Buildings | 2 buildings | zoning application [1] datacenterdynamics.com | |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Chronological regulatory, corporate and permitting events on the record, newest first.
(source date; the content gives no date of its own)
Raeden planned to install 35 backup diesel generators
Filing (source date; the content gives no date of its own)
Raeden submitted application to Gibraltar in mid February 2026
· Status: proposed (source date; the content gives no date of its own)
Raeden proposed 100MW data center at 27800 W. Jefferson, former McLouth Steel site
· Status: stalled or cancelled (content date)
Raeden's data center development in Gibraltar, Michigan was halted by a municipal moratorium, which the developer claims unlawfully stopped the project and has challenged in court.
Moratorium ended (source date; the content gives no date of its own)
The city council issued a letter in July 2026 stating it would not process the February application until the moratorium ended
Filing (source date; the content gives no date of its own)
Raeden Acquisitions submitted an application to the city on February 17, 2026 for a data center at the former McLouth steel mill site
(source date; the content gives no date of its own)
Raeden proposed to repurpose McLouth Steel industrial site into 100 megawatt inference data center
· Status: proposed Moratorium (content date)
Raeden Acquisitions and CAL Realty filed a lawsuit in U.S. District Court for the Eastern District of Michigan on August 17, challenging the moratorium as unlawful and seeking approval of a plan to transform a former steel mill into a data center. (alleged in the filing, not a finding)
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
Every correction on the record is on the corrections page.
Verified data center records in Michigan within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| Google Van Buren Township data center Van Buren Township, Wayne County | 17 mi | Proposed | 1 GW | |
| Raeden Michigan 1 Data Center (Detroit) Detroit, Wayne County | 18 mi | Running | Raeden | 10 MW |
| Otava Metro Detroit Data Center (Westland) Westland, Wayne County | 20 mi | Running | Otava | 6 MW |
| University of Michigan and Los Alamos National Laboratory Hyperscale Data Center Ypsilanti Township, Washtenaw County | 23 mi | Proposed | University of Michigan / Los Alamos National Laboratory | 1 building |
| EdgeConneX Detroit Data Center (DET01) Southfield, Oakland County | 25 mi | Running | EdgeConneX | 8 MW |
| ManagedWay and 123NET Southfield Data Center (SFJ2 / DC2) Southfield, Oakland County | 26 mi | Running | ManagedWay | 8 MW |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Raeden is the developer. No construction contractor is named on the record yet.
Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.
Power: 100 MW (the developer's figure, datacenterdynamics.com (opens in a new tab)). Water: not disclosed by any source on file.
It is proposed, as reported August 24, 2026. The newest entry, reported August 24, 2026: Raeden planned to install 35 backup diesel generators [1].
Not disclosed by any source on file: how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.
7 sources on file.
This site is in the RFC Michigan (RFCM) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Raeden Gibraltar Data Center. Last verified November 6, 2026. https://datacenterrecord.org/projects/raeden-gibraltar-data-center-mi. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Raeden Gibraltar Data Center
Data Center Record, "Raeden Gibraltar Data Center", https://datacenterrecord.org/projects/raeden-gibraltar-data-center-mi. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.