● Proposed Campus Recorded August 17, 2026 · 2 Buildings

Raeden Gibraltar Data Center

Street address 28000 West Jefferson Avenue, Gibraltar, MI 48173, Wayne County verified address Exact, at the address [1] datacenterdynamics.com

Overview, regulatory gates and specifications

Raeden proposed a 100 megawatt data center development in Gibraltar, Wayne County, Michigan, which was paused by a municipal moratorium and became the subject of litigation in August 2026. [1] Filings on the record specify disclosed capacity of 100 MW (the developer's figure), 2 planned or operational buildings. [1] Raeden's data center development in Gibraltar, Michigan was halted by a municipal moratorium, which the developer claims unlawfully stopped the project and has challenged in court. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Not yet on file
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
100 MW disclosed
5. Air & Water Permits
Not yet on file
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand [1]
100 MW
the developer's figure

Equivalent to ~83,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 4.8% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
2 buildings
zoning application

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 28000 West Jefferson Avenue, Gibraltar, MI 48173.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
100 MW developer figure Equivalent to the continuous electricity demand of about 83,000 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 1 percent of New York City's summer peak demand in 2024.
[1] datacenterdynamics.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
2 buildings operator page
[1] datacenterdynamics.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Raeden as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Raeden Gibraltar Data Center, capacity: 100 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 100 ÷ 10,245 = 0.0098 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Raeden
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Raeden Gibraltar Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 100 MW the developer's figure [1] datacenterdynamics.com
Site Footprint (Acres)
Data Hall Buildings 2 buildings zoning application [1] datacenterdynamics.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    Raeden planned to install 35 backup diesel generators

    [1] datacenterdynamics.com

  2. Filing (source date; the content gives no date of its own)

    Raeden submitted application to Gibraltar in mid February 2026

    [1] datacenterdynamics.com

  3. · Status: proposed (source date; the content gives no date of its own)

    Raeden proposed 100MW data center at 27800 W. Jefferson, former McLouth Steel site

    [1] datacenterdynamics.com

  4. · Status: stalled or cancelled (content date)

    Raeden's data center development in Gibraltar, Michigan was halted by a municipal moratorium, which the developer claims unlawfully stopped the project and has challenged in court.

    [1] datacenterdynamics.com

  5. Moratorium ended (source date; the content gives no date of its own)

    The city council issued a letter in July 2026 stating it would not process the February application until the moratorium ended

    [6] cbsnews.com

  6. Filing (source date; the content gives no date of its own)

    Raeden Acquisitions submitted an application to the city on February 17, 2026 for a data center at the former McLouth steel mill site

    [6] cbsnews.com

  7. (source date; the content gives no date of its own)

    Raeden proposed to repurpose McLouth Steel industrial site into 100 megawatt inference data center

    [4] freep.com

  8. · Status: proposed Moratorium (content date)

    Raeden Acquisitions and CAL Realty filed a lawsuit in U.S. District Court for the Eastern District of Michigan on August 17, challenging the moratorium as unlawful and seeking approval of a plan to transform a former steel mill into a data center. (alleged in the filing, not a finding)

    [7] govtech.com

Every event in order

10 corrections to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  3. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  4. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  5. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

Every correction on the record is on the corrections page.

Nearest data centers in Michigan

Verified data center records in Michigan within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Google Van Buren Township data center Van Buren Township, Wayne County 17 mi Proposed Google 1 GW
Raeden Michigan 1 Data Center (Detroit) Detroit, Wayne County 18 mi Running Raeden 10 MW
Otava Metro Detroit Data Center (Westland) Westland, Wayne County 20 mi Running Otava 6 MW
University of Michigan and Los Alamos National Laboratory Hyperscale Data Center Ypsilanti Township, Washtenaw County 23 mi Proposed University of Michigan / Los Alamos National Laboratory 1 building
EdgeConneX Detroit Data Center (DET01) Southfield, Oakland County 25 mi Running EdgeConneX 8 MW
ManagedWay and 123NET Southfield Data Center (SFJ2 / DC2) Southfield, Oakland County 26 mi Running ManagedWay 8 MW

Blank cell: not disclosed by any source on file.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Capacity at full buildout

2 figures, 2 sources
100 MW Developer's figure

Data Center Dynamics, Aug 24, 2026

100 MW Reported

GovTech, Aug 20, 2026

Show each source's words
  • 100 MW, GovTech: The data center would initially require 100 megawatts of electricity.

Common questions about Raeden Gibraltar Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Raeden Gibraltar Data Center?

Raeden is the developer. No construction contractor is named on the record yet.

Who will use Raeden Gibraltar Data Center?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Raeden Gibraltar Data Center say it needs?

Power: 100 MW (the developer's figure, datacenterdynamics.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does Raeden Gibraltar Data Center stand today?

It is proposed, as reported August 24, 2026. The newest entry, reported August 24, 2026: Raeden planned to install 35 backup diesel generators [1].

What is still unknown about Raeden Gibraltar Data Center?

Not disclosed by any source on file: how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Raeden claims Michigan moratorium unlawfully stopped its Gibraltar data center development - Data Center Dynamics (opens in a new tab), Data Center Dynamics, August 24, 2026, trade press
  2. Raeden claims Michigan moratorium unlawfully stopped its Gibraltar data center development - Data Center Dynamics (opens in a new tab), Data Center Dynamics, August 24, 2026, trade press
  3. Raeden Gibraltar Data Center: 100 MW data center in Michigan (opens in a new tab), morethanjustparks.com, July 13, 2026, news outlet
  4. Developers challenge Gibraltar's data center moratorium in court - Detroit Free Press (opens in a new tab), Detroit Free Press, August 20, 2026, local outlet
  5. Data center developer sues Michigan city, challenging one-year pause on projects - MLive.com (opens in a new tab), MLive.com, August 20, 2026, local outlet
  6. Data center developer accuses Gibraltar city officials of unlawfully imposing 1 year moratorium - cbsnews.com (opens in a new tab), cbsnews.com, August 21, 2026, national outlet
  7. Data Center Developer Sues Michigan City Over Moratorium - GovTech (opens in a new tab), GovTech, August 20, 2026, national outlet

7 sources on file.

Regional grid context

This site is in the RFC Michigan (RFCM) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Raeden Gibraltar Data Center", https://datacenterrecord.org/projects/raeden-gibraltar-data-center-mi, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Raeden Gibraltar Data Center", https://datacenterrecord.org/projects/raeden-gibraltar-data-center-mi. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
42.095, -83.1895
How the location is known
Location from the site's street address.
Location source
https://www.cityofgibraltarmi.gov/
Coordinate source
City of Gibraltar McLouth Steel site record
Location last verified
September 16, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
100 MW, the developer's figure
Published
September 5, 2026
Last verified
November 6, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Raeden Gibraltar Data Center · 7 sources, 8 entries · basis and source tier on every row · verified November 6, 2026