● Proposed Campus First recorded September 14, 2026 · 4 Buildings

Google Van Buren Township data center

Street address Ecorse Road and Haggerty Road, Van Buren Township, MI 48111, Wayne County assessor parcel Exact, on the parcel [1] Google: Data center locations

Overview, regulatory gates and specifications

Google is developing a 1,000 megawatt hyperscale data center campus in Van Buren Township, Wayne County, Michigan, after Wayne County Commissioners approved project tax incentives in 2026. [1] Filings on the record specify disclosed capacity of 1 GW (the developer's figure), 4 planned or operational buildings. [1] Google lists Google Van Buren Township data center at Van Buren, Michigan on its own page of data center locations, read September 14, 2026. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Incentive review
4. Utility Grid Queue
1 GW disclosed
5. Air & Water Permits
Not yet on file
What happens next: Next public milestones include utility queue filings, state environmental permits and local site plan review.
Electricity Demand [1]
1 GW
the developer's figure

Equivalent to ~830,000 U.S. homes (U.S. EIA 830 homes/MW baseline) · 48% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
4 buildings
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: Ecorse Road and Haggerty Road, Van Buren Township, MI 48111.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
1 GW developer figure Equivalent to the continuous electricity demand of about 830,000 average U.S. homes based on U.S. Energy Information Administration residential consumption data, or about 0.5 times the 2,080 MW generating capacity of Hoover Dam. About 10 percent of New York City's summer peak demand in 2024.
[1] datacenters.google
Water usage
Not disclosed
Land area
Not disclosed
Buildings
4 buildings operator page
[1] datacenters.google
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Google as stated by the source
Official project website
datacenters.google (opens in a new tab) verified October 28, 2026
datacenters.google (opens in a new tab)
Archived promotional websites
datacenters.google (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. Google Van Buren Township data center, capacity: 1,000 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 1,000 ÷ 10,245 = 0.1 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Ashley S.

Resident · Adjacent residential subdivision

DID Recorded statement at Van Buren Township Planning Commission meeting (October 21, 2026)
SAID Crews are behind our homes from 6 a.m. to 7 p.m, six to seven days a week. Dust has been coming into our homes since August and only getting worse. Children with asthma and people on oxygen can't go in their backyards now. Our houses shake. (October 21, 2026) bridgemi.com (opens in a new tab)

Medina Atchinson

Planning Commission Member · Van Buren Township Planning Commission

DID Recorded statement at Van Buren Township Planning Commission meeting (October 21, 2026)
SAID If a data center is coming to Van Buren Township, I personally would want Google (October 21, 2026) bridgemi.com (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Google · Parent: Alphabet
UTILITIES
Electric utility: Not disclosed

View all 4 statements on the record in Michigan →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Google Van Buren Township data center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 1 GW the developer's figure [1] datacenters.google
Site Footprint (Acres)
Data Hall Buildings 4 buildings operator page [1] datacenters.google
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (planned date, from the content)

    The Van Buren Township Planning Commission is expected to review the final site plan at its meeting on October 14

    [2] wxyz.com

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    Google lists Google Van Buren Township data center at Van Buren, Michigan on its own page of data center locations, read September 14, 2026.

    [1] datacenters.google

Nearest data centers in Michigan

Verified data center records in Michigan within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
University of Michigan and Los Alamos National Laboratory Hyperscale Data Center Ypsilanti Township, Washtenaw County 6 mi Proposed University of Michigan / Los Alamos National Laboratory 1 building
Otava Metro Detroit Data Center (Westland) Westland, Wayne County 8 mi Running Otava 6 MW
Oracle and OpenAI Saline Township Data Center Saline Township, Washtenaw County 14 mi Being built Related Digital 1.4 GW
Raeden Gibraltar Data Center Gibraltar, Wayne County 17 mi Proposed Raeden 100 MW
EdgeConneX Detroit Data Center (DET01) Southfield, Oakland County 19 mi Running EdgeConneX 8 MW
Verrus Project Flex Lyon Township Data Center Lyon Township, Oakland County 20 mi Proposed Verrus 2 buildings

Blank cell: not disclosed by any source on file.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, each with who gave it, its date and its basis.

Capacity at full buildout

2 figures, 2 sources
1 GW Developer's figure

Google, Sep 14, 2026

Show each source's words
  • 1 GW, Planet Detroit: Google data center in Van Buren Township has capacity of 1 gigawatt

Common questions about Google Van Buren Township data center

Answered directly from the verified filings and local actions on this page.

Who is building Google Van Buren Township data center?

Google is the developer. No construction contractor is named on the record yet.

Who will use Google Van Buren Township data center?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Google Van Buren Township data center say it needs?

Power: 1 GW (the developer's figure, datacenters.google (opens in a new tab)). Water: not disclosed by any source on file.

Where does Google Van Buren Township data center stand today?

It is approved; the date it reached that stage is not sourced, only the day a page was read. The newest entry, expected October 2026, as of October 2026: The Van Buren Township Planning Commission is expected to review the final site plan at its meeting on October 14 [2].

What is still unknown about Google Van Buren Township data center?

Not disclosed by any source on file: how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, how much land, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. Google: Data center locations (opens in a new tab), Google, September 14, 2026

Reporting

  1. Wayne County commissioners override veto to approve Google data center tax incentives in Van Buren Township - WXYZ 7 News Detroit (opens in a new tab), WXYZ 7 News Detroit, October 2, 2026, local outlet

2 sources on file.

Regional grid context

This site is in the RFC Michigan (RFCM) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Google Van Buren Township data center", https://datacenterrecord.org/projects/google-van-buren-township-data-center-mi, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Google Van Buren Township data center", https://datacenterrecord.org/projects/google-van-buren-township-data-center-mi. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
42.2202069, -83.4839342
How the location is known
Location from the county parcel record.
Location source
https://datacenters.google/locations/
Coordinate source
Google Van Buren Township specification and Wayne County Commission approval record
Location last verified
September 14, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
1 GW, the developer's figure
Published
September 14, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · Google Van Buren Township data center · 2 sources, 2 entries · basis and source tier on every row · verified October 27, 2026

Download CSV JSON