Data Center Record.
Census GEOID: 06067 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary source

● Running First recorded October 3, 2026 · 1 Building

EdgeConneX Sacramento Rancho Cordova Data Center (SAC01)

Street address 10980 Gold Center Drive, Rancho Cordova, CA 95670, Sacramento County verified address Exact, at the address EPA ECHO detailed facility report: Edgeconnex Sacramento Holdings LLC (opens in a new tab)

Overview, regulatory gates and specifications

EdgeConneX operates its SAC01 Sacramento edge colocation data center at 10980 Gold Center Drive in Rancho Cordova, Sacramento County, California, delivering 8 MW of power capacity. [1] Filings on the record specify 1 planned or operational building. [1] Verified facility status from California state agency permits, utility dockets, municipal planning filings, or operator campus specifications. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
EPA air permit on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
8 MW
the developer's figure

Equivalent to ~6,640 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.4% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 10980 Gold Center Drive, Rancho Cordova, CA 95670.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
8 MW developer figure Equivalent to the continuous electricity demand of about 6,640 average U.S. homes based on U.S. Energy Information Administration residential consumption data. Less than 0.1 percent (0.078 percent) of New York City's summer peak demand in 2024.
edgeconnex.com (opens in a new tab)
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
edgeconnex.com (opens in a new tab)
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2016 (10 years)
Who leads it
EdgeConneX as stated by the source
[1] echo.epa.gov
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. EdgeConneX Sacramento Rancho Cordova Data Center (SAC01), capacity: 8 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 8 ÷ 10,245 = 0.00078 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: EdgeConneX
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for EdgeConneX Sacramento Rancho Cordova Data Center (SAC01).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 8 MW 8 MW the developer's figure
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on October 27, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from California state agency permits, utility dockets, municipal planning filings, or operator campus specifications.

    edgeconnex.com (opens in a new tab) news outlet

Nearest data centers in California

Verified data center records in California within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Prime Data Centers Sacramento McClellan Campus (SAC01 and SAC02) Sacramento, Sacramento County 8 mi Running Prime Data Centers 28 MW
NTT Global Data Centers Sacramento Campus (CA1, CA2, and CA3) Sacramento, Sacramento County 12 mi Running NTT Global Data Centers 58 MW
QTS Sacramento Data Center Sacramento, Sacramento County 13 mi Running QTS Data Centers 18 MW
Panattoni West Roseville Innovation Center Data Center Proposal Roseville, Placer County 15 mi Proposed Panattoni Development Company 100 MW
New York GreenCloud Ione Biomass Powered Data Center Proposal Ione, Amador County 25 mi Proposed New York GreenCloud 1 building
EZ Network Systems Stockton Data Center Stockton, San Joaquin County 42 mi Running EZ Network Systems 2 MW

Blank cell: not disclosed by any source on file.

Common questions about EdgeConneX Sacramento Rancho Cordova Data Center (SAC01)

Answered directly from the verified filings and local actions on this page.

Who is building EdgeConneX Sacramento Rancho Cordova Data Center (SAC01)?

EdgeConneX is the developer, echo.epa.gov (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does EdgeConneX Sacramento Rancho Cordova Data Center (SAC01) say it needs?

Power: 8 MW (the developer's figure, edgeconnex.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does EdgeConneX Sacramento Rancho Cordova Data Center (SAC01) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. EPA ECHO detailed facility report: Edgeconnex Sacramento Holdings LLC (opens in a new tab), U.S. Environmental Protection Agency

1 source on file.

Regional grid context

This site is in the WECC California (CAMX) regional power market.

Sources and data

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "EdgeConneX Sacramento Rancho Cordova Data Center (SAC01)", https://datacenterrecord.org/projects/edgeconnex-sacramento-holdings-llc-rancho-cordova-ca, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "EdgeConneX Sacramento Rancho Cordova Data Center (SAC01)", https://datacenterrecord.org/projects/edgeconnex-sacramento-holdings-llc-rancho-cordova-ca. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
38.5968, -121.2785
How the location is known
Location from the site's street address.
Location source
https://www.edgeconnex.com/locations/americas/rancho-cordova-ca/
Coordinate source
EPA FRS 110070905572 / EdgeConneX SAC01 specification
Location source number
[1]
Location last verified
October 3, 2026
EPA registry id
110070905572
How capacity was disclosed
the developer's figure
Capacity, if disclosed
8 MW, the developer's figure
Published
October 3, 2026
Last verified
October 27, 2026
Not disclosed
Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · EdgeConneX Sacramento Rancho Cordova Data Center (SAC01) · 1 source, 1 entry · basis and source tier on every row · verified October 27, 2026

Download CSV JSON