Data Center Record.
Census GEOID: 06067 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 2 primary sources

● Running First recorded September 14, 2026 · 1 Building

QTS Sacramento Data Center

Street address 1100 North Market Boulevard, Sacramento, CA 95834, Sacramento County verified address Exact, at the address [2] QTS Data Centers: All locations

Overview, regulatory gates and specifications

QTS Data Centers operates a 92,000 square foot enterprise and government colocation data center at 1100 North Market Boulevard in North Natomas, Sacramento County, California, with 18 MW of SMUD utility power. [1] Filings on the record specify 1 planned or operational building. [2] QTS Data Centers lists QTS Sacramento at Sacramento, California on its own page of data center locations, read September 14, 2026. [2]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
EPA air permit on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [2]
18 MW
the developer's figure

Equivalent to ~14,940 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.9% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [2]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 1100 North Market Boulevard, Sacramento, CA 95834.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
18 MW developer figure Equivalent to the continuous electricity demand of about 14,900 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 0.2 percent of New York City's summer peak demand in 2024.
[2] q.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[2] q.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2012 (14 years)
Who leads it
QTS Data Centers as stated by the source
Official project website
q.com (opens in a new tab) verified October 28, 2026
q.com (opens in a new tab)
Archived promotional websites
q.com (opens in a new tab) [Wayback snapshot] (opens in a new tab) preserved in Internet Archive
tracked domains
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. QTS Sacramento Data Center, capacity: 18 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 18 ÷ 10,245 = 0.0018 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: QTS Data Centers
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for QTS Sacramento Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 18 MW 18 MW the developer's figure [2] q.com
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page [2] q.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on September 14, 2026 (the day the page was read; it gives no date of its own)

    QTS Data Centers lists QTS Sacramento at Sacramento, California on its own page of data center locations, read September 14, 2026.

    [2] q.com

Nearest data centers in California

Verified data center records in California within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
NTT Global Data Centers Sacramento Campus (CA1, CA2, and CA3) Sacramento, Sacramento County Less than 1 mi Running NTT Global Data Centers 58 MW
Prime Data Centers Sacramento McClellan Campus (SAC01 and SAC02) Sacramento, Sacramento County 6 mi Running Prime Data Centers 28 MW
Panattoni West Roseville Innovation Center Data Center Proposal Roseville, Placer County 13 mi Proposed Panattoni Development Company 100 MW
EdgeConneX Sacramento Rancho Cordova Data Center (SAC01) Rancho Cordova, Sacramento County 13 mi Running EdgeConneX 8 MW
New York GreenCloud Ione Biomass Powered Data Center Proposal Ione, Amador County 37 mi Proposed New York GreenCloud 1 building
NorthPoint Development Fairfield Solano Data Center Campus Proposal Fairfield, Solano County 43 mi Proposed NorthPoint Development / Canon Partners 150 MW

Blank cell: not disclosed by any source on file.

Common questions about QTS Sacramento Data Center

Answered directly from the verified filings and local actions on this page.

Who is building QTS Sacramento Data Center?

QTS Data Centers is the developer. No construction contractor is named on the record yet.

How much power and water does QTS Sacramento Data Center say it needs?

Power: 18 MW (the developer's figure, q.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does QTS Sacramento Data Center stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Tracked project domains

Promotional domains, campaign sites, and municipal portals preserved through the Internet Archive.

Primary documents

  1. EPA ECHO detailed facility report: QTS Sacramento LLC (opens in a new tab), U.S. Environmental Protection Agency
  2. QTS Data Centers: All locations (opens in a new tab), QTS Data Centers, September 14, 2026

2 sources on file.

Regional grid context

This site is in the WECC California (CAMX) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "QTS Sacramento Data Center", https://datacenterrecord.org/projects/qts-sacramento-ca, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "QTS Sacramento Data Center", https://datacenterrecord.org/projects/qts-sacramento-ca. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
38.6385, -121.5142
How the location is known
Location from the site's street address.
Location source
https://q.com/data-centers/
Coordinate source
EPA FRS 110071676156 / QTS Sacramento specification
Location source number
[1]
Location last verified
October 4, 2026
EPA registry id
110071676156
How capacity was disclosed
the developer's figure
Capacity, if disclosed
18 MW, the developer's figure
Published
September 14, 2026
Last verified
October 27, 2026
Not disclosed
Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · QTS Sacramento Data Center · 2 sources, 1 entry · basis and source tier on every row · verified October 27, 2026

Download CSV JSON