NorthPoint Development and Canon Partners proposed a 3 building, 150 MW industrial and data center campus in Fairfield, Solano County, California, submitted for review to the City of Fairfield. It is proposed, since August 17, 2026.
How much water it would use and who would use it have not been disclosed.
Tap a pin for the data center, the parcel for its record
- This record: Proposed, ringed
- data center
- Smaller pins: 68 other published records in California
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Buildings
- 3 buildings zoning filing, verified October 27, 2026
- Power it would draw
- 150 MW the developer's figure About 1 percent of New York City's summer peak demand in 2024.
- Who leads it
- NorthPoint Development / Canon Partners as stated by the source
- Undisclosed in public filings
- Land, Water, Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
- NorthPoint Development Fairfield Solano Data Center Campus Proposal, capacity: 150 MW.
- New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
- 150 ÷ 10,245 = 0.01 (MW over MW).
Sources:
- NorthPoint Development / Canon Partners (opens in a new tab)
- NYISO, 2025 Load and Capacity Data Report (Gold Book) (opens in a new tab), Table I-4a, Baseline Summer Non-Coincident Peak Demand, Historical and Forecast, page 26, Zone J, 2024 row (2024)
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | 150 MW | the developer's figure | fairfield.ca.gov (opens in a new tab) | October 27, 2026 |
| How much water it would use | ||||
| How loud it would be | ||||
| Jobs once it runs | ||||
| Tax it would pay each year |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | NorthPoint Development / Canon Partners | as stated by the source | October 27, 2026 | |
| Who is constructing it | ||||
| How much land | ||||
| Buildings | 3 buildings | zoning filing, verified October 27, 2026 | fairfield.ca.gov (opens in a new tab) | October 27, 2026 |
| Where its power comes from | ||||
| Grid connection | ||||
| How it is cooled |
A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Water use A state water right filing or a water supply agreement.
- Who would use it A lease announcement or a tenant named in a filing.
- Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.
What was decided
Acts of Solano County and Fairfield about data centers, on the record with their source. A rule about the area is not a decision about this record.
June 15, 2026 Fairfield, CA Fairfield City Council Meeting April 7, 2026
In Fairfield, Solano County (CA), Fairfield City Council and local residents debated municipal data center siting, utility infrastructure load, water consumption, and zoning rules during the June 15, 2026 session.
- Fairfield City Council Applicant and Economic Development Presentation Developer Representative auto captions, unchecked
">> Good evening. I'm going to call this meeting of the Fairfield City Council to order. Madame Clerk, roll call, please. Council member Carr >> here, >> Council Member Panduro >> here. >> Council member Sandu >> here. >> Council member Tonison >> here. >> Council member Williams >> here. >> Vice Mayor Bertani >> here. >> And Mayor Moy >> here. >> Thank you. >> All right. And the invocation tonight, I"
- Fairfield City Council Official Deliberation Elected Official auto captions, unchecked
"your will. You possess power over everything. You run the whole universe as you like without any assistance. You are independent and eternal. The only power owner of the day of judgment. Oh our Lord, we only worship you and ask help from you. Please unite our hearts"
- Resident public comment Resident Public Comment auto captions, unchecked
"Now we'll go to council reports. Um, Councilwoman Williams, please. >> Thank you. Uh, I have three different events to well, three different things to report about. One was a tour of the Rockville Hills Regional Park with the ARACK. hopefully I'm saying that right with"
Using this data in a report? Support the record.
What happened
-
· Status: proposed (content date)
NorthPoint Development and Canon Partners are proposing a 150 MW data center on a 300 acre industrial campus in northeast Fairfield, with PG&E studying power infrastructure and entitlements nearly complete.
The full NorthPoint Development Fairfield Solano Data Center Campus Proposal timeline, in order
The site
The pin is the site's address.
- Where
- 2500 Cordelia Road, Fairfield, CA 94534, Fairfield, Solano County, California [source] (opens in a new tab)
- How exactly it is located
- Exact, at the address
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- Avaio Digital Pittsburg Bay Area Data Center Campus, 19 mi
- Verizon Wireless:shadelands (walnut Creek Data Center), 20 mi
- X2nSat Petaluma Satellite and Colocation Data Center, 31 mi
- Digital Realty Oakland Data Center Campus (OAK10), 31 mi
- Digital Realty San Francisco Carrier Hotel Campus (SFO10 and SFO12), 34 mi
Keep going
Questions about this project
5 questions answered from the record
How big is NorthPoint Development Fairfield Solano Data Center Campus Proposal?
-
The record has 2 measures of its size: 150 MW (the developer's figure, fairfield.ca.gov (opens in a new tab)) and 3 buildings (zoning filing, verified October 27, 2026, fairfield.ca.gov (opens in a new tab)). Its acreage is not disclosed.
Who is building NorthPoint Development Fairfield Solano Data Center Campus Proposal?
-
NorthPoint Development / Canon Partners is the developer. No construction contractor is named on the record yet.
How much power and water does NorthPoint Development Fairfield Solano Data Center Campus Proposal say it needs?
-
Power: 150 MW (the developer's figure, fairfield.ca.gov (opens in a new tab)). Water: not disclosed by any source on file.
Where does NorthPoint Development Fairfield Solano Data Center Campus Proposal stand today?
-
It is proposed, since August 17, 2026. The newest entry, August 17, 2026: NorthPoint Development and Canon Partners are proposing a 150 MW data center on a 300 acre industrial campus in northeast Fairfield, with PG&E studying power infrastructure and entitlements nearly complete. [1]
What has Fairfield or Solano County decided about it?
-
No decision by Fairfield or Solano County about data centers is on the record. The Solano County page and the California scorecard list every rated row the day a person publishes one.
Sources
Reporting
- Developers planning data center for Fairfield industrial park - The Vallejo Sun (opens in a new tab), The Vallejo Sun, August 17, 2026, query feed
1 source on file.
About this data
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about NorthPoint Development Fairfield Solano Data Center Campus Proposal
Cite this page
Data Center Record, "NorthPoint Development Fairfield Solano Data Center Campus Proposal", https://datacenterrecord.org/projects/northpoint-development-canon-partners-fairfield-data-center-ca. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.
For researchers
- Stage
- Proposed
- Tier
- built from one source
- Tags
- Built from one source
- Coordinates
- 38.2185, -122.0942
- How the location is known
- Location from the site's street address.
- Location source
- https://www.fairfield.ca.gov/
- Coordinate source
- City of Fairfield Planning Commission Docket
- How capacity was disclosed
- the developer's figure
- Capacity, if disclosed
- 150 MW, the developer's figure
- Published
- October 3, 2026
- Last verified
- October 27, 2026
- Undisclosed in public filings
- Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows