{
  "license": "CC BY-NC 4.0",
  "license_url": "https://creativecommons.org/licenses/by-nc/4.0/",
  "attribution": "Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0. Link to the specific record page where possible.",
  "source": "https://datacenterrecord.org/projects/northpoint-development-canon-partners-fairfield-data-center-ca",
  "retrieved_at": "2026-10-28T05:26:09.750Z",
  "count": 1,
  "projects": [
    {
      "slug": "northpoint-development-canon-partners-fairfield-data-center-ca",
      "name": "NorthPoint Development Fairfield Solano Data Center Campus Proposal",
      "summary": "NorthPoint Development and Canon Partners proposed a 3 building, 150 MW industrial and data center campus in Fairfield, Solano County, California, submitted for review to the City of Fairfield.",
      "state": "CA",
      "city": "Fairfield",
      "county": "Solano County",
      "status": "proposed",
      "developer": "NorthPoint Development / Canon Partners",
      "capacity_mw": 150,
      "latitude": 38.2185,
      "longitude": -122.0942,
      "location_precision": "address",
      "location_source": "https://www.fairfield.ca.gov/",
      "location_verified_at": null,
      "coordinate_source": "City of Fairfield Planning Commission Docket",
      "location_last_verified": null,
      "site_address": "2500 Cordelia Road, Fairfield, CA 94534",
      "site_address_source_url": "https://www.fairfield.ca.gov/",
      "published": "2026-10-03",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "zoning filing",
      "buildings_source_url": "https://www.fairfield.ca.gov/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/northpoint-development-canon-partners-fairfield-data-center-ca",
      "sources": [
        {
          "title": "Developers planning data center for Fairfield industrial park - The Vallejo Sun",
          "url": "https://www.vallejosun.com/developers-planning-data-center-for-fairfield-industrial-park/",
          "publisher": "The Vallejo Sun",
          "date": "2026-08-17",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-08-17",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "NorthPoint Development and Canon Partners are proposing a 150 MW data center on a 300 acre industrial campus in northeast Fairfield, with PG&E studying power infrastructure and entitlements nearly complete.",
          "source_url": "https://www.vallejosun.com/developers-planning-data-center-for-fairfield-industrial-park/",
          "source_tier": 1
        }
      ]
    }
  ]
}
