Data Center Record.
Census GEOID: 36061 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 3 reporting sources

● Running Reported September 1, 2026 · 1 Building

GNM and 32 Avenue of the Americas Tribeca Interconnection Hub

Street address 32 Avenue of the Americas, New York, NY 10013, New York County verified address Exact, at the address digitalrealty.com (opens in a new tab)

Overview, regulatory gates and specifications

Global Net (GNM) and carrier hotel operators run high density optical and IP exchange infrastructure inside 32 Avenue of the Americas in Tribeca, Manhattan, New York County. [1] Filings on the record specify disclosed capacity of 12 MW (the developer's figure), 1 planned or operational building. [1] GNM launched new point of presence at Digital Realty Tribeca data center in New York [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
12 MW
the developer's figure

Equivalent to ~9,960 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.6% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 32 Avenue of the Americas, New York, NY 10013.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
12 MW developer figure Equivalent to the continuous electricity demand of about 9,960 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 0.1 percent of New York City's summer peak demand in 2024.
digitalrealty.com (opens in a new tab)
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
digitalrealty.com (opens in a new tab)
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2018 (8 years)
Who leads it
Global Net (GNM) / Digital Realty as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. GNM and 32 Avenue of the Americas Tribeca Interconnection Hub, capacity: 12 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 12 ÷ 10,245 = 0.0012 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Bryan Gottlieb

ENR online editor

DID Recorded statement at Engineering News-Record (July 21, 2026)
SAID Gottlieb claims moratorium creates uncertainty that will drive investment to Texas, Virginia and other states (July 21, 2026) enr.com (opens in a new tab)

Kristen Gonzalez

New York State Senator

DID Recorded statement at National Conference of State Legislatures (NCSL) (July 15, 2026)
SAID New York Senate Bill sponsored by Sen. Kristen Gonzalez would have created a new electricity rate class for data centers, mandated public comment periods, and required public disclosure of power use and water consumption (July 15, 2026) ncsl.org (opens in a new tab)
Kathy Hochul

Kathy Hochul

Governor of New York · New York

DID Recorded statement at WWNY (July 15, 2026)
SAID Governor said she will require future data centers to supply their own power or pay premium to tap into state grid (July 15, 2026) wwnytv.com (opens in a new tab)

Adam Thierer

R Street Institute

DID Recorded statement at R Street Institute (July 14, 2026)
SAID Adam Thierer, R Street Institute, stated the New York moratorium will have deleterious consequences including lost investment, fewer jobs, diminished tax revenues, and forgone life saving innovations (July 14, 2026) rstreet.org (opens in a new tab)

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Global Net (GNM) / Digital Realty
UTILITIES
Electric utility: Not disclosed

View all 9 statements on the record in New York →

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for GNM and 32 Avenue of the Americas Tribeca Interconnection Hub.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 12 MW 12 MW the developer's figure
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. (source date; the content gives no date of its own)

    GNM launched new point of presence at Digital Realty Tribeca data center in New York

    [1] w.media

  2. · Status: running (content date)

    GNM switched on a New York point of presence at a Tribeca data center.

    digitalrealty.com (opens in a new tab) news outlet

Every event in order

8 corrections to this record

Every correction, with its reason
  1. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  2. · Source tier

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.

  3. · Source tier

    Tier after resolution (September 21, 2026). The source on file is nypost.com, the publisher's own page. The item reached the record through Google News: "data center" New York, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 1 row of monitoring_sources. The speaker, the claim, the date and the url are unchanged.

  4. · Source tier

    Tier after resolution (September 21, 2026). The source on file is w.media, the publisher's own page. The item reached the record through Google News: "data center" New York, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 3 on 1 row of sources. The speaker, the claim, the date and the url are unchanged.

  5. · Source tier

    Tier after resolution (September 21, 2026). The source on file is nypost.com, the publisher's own page. The item reached the record through Google News: "data center" New York, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 1 row of monitoring_sources. The speaker, the claim, the date and the url are unchanged.

  6. · Source tier

    Tier after resolution (September 21, 2026). The source on file is nypost.com, the publisher's own page. The item reached the record through Google News: "data center" New York, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 1 row of monitoring_sources. The speaker, the claim, the date and the url are unchanged.

  7. · Source tier

    Tier after resolution (September 21, 2026). The source on file is nypost.com, the publisher's own page. The item reached the record through Google News: "data center" New York, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 1 row of monitoring_sources. The speaker, the claim, the date and the url are unchanged.

Every correction on the record is on the corrections page.

Nearest data centers in New York

Verified data center records in New York within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
CoreSite New York Manhattan Data Center (NY1) New York, New York County Less than 1 mi Running CoreSite 6 MW
Digital Realty Manhattan Carrier Hotel Campus (JFK10, JFK12, and JFK13) New York, New York County Less than 1 mi Running Digital Realty 32 MW
Centersquare New York Data Center (60 Hudson Street) New York, New York County Less than 1 mi Running Centersquare 4 MW
H5 Data Centers New York (325 Hudson Street) New York, New York County Less than 1 mi Running H5 Data Centers 6 MW
Sabey Data Centers Intergate Manhattan (375 Pearl Street) New York, New York County Less than 1 mi Running Sabey Data Centers 40 MW
New York Internet Lower Manhattan Data Center (NYI NY1) New York, New York County Less than 1 mi Running New York Internet (NYI) 4 MW

Blank cell: not disclosed by any source on file.

Common questions about GNM and 32 Avenue of the Americas Tribeca Interconnection Hub

Answered directly from the verified filings and local actions on this page.

Who is building GNM and 32 Avenue of the Americas Tribeca Interconnection Hub?

Global Net (GNM) / Digital Realty is the developer. No construction contractor is named on the record yet.

How much power and water does GNM and 32 Avenue of the Americas Tribeca Interconnection Hub say it needs?

Power: 12 MW (the developer's figure, digitalrealty.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does GNM and 32 Avenue of the Americas Tribeca Interconnection Hub stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. GNM switches on New York PoP at Tribeca data center - W.Media (opens in a new tab), W.Media, September 1, 2026, news outlet
  2. GNM switches on New York PoP at Tribeca data center - W.Media (opens in a new tab), W.Media, September 1, 2026, news outlet
  3. New York Orders Moratorium on Large Data Center Permits - Engineering News-Record (opens in a new tab), Engineering News-Record, July 14, 2026, news outlet

3 sources on file.

Regional grid context

This site is in the NPCC NYC and Westchester (NYCW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "GNM and 32 Avenue of the Americas Tribeca Interconnection Hub", https://datacenterrecord.org/projects/gnm-new-york-pop-at-tribeca-ny, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "GNM and 32 Avenue of the Americas Tribeca Interconnection Hub", https://datacenterrecord.org/projects/gnm-new-york-pop-at-tribeca-ny. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
40.7204, -74.0052
How the location is known
Location from the site's street address.
Location source
https://www.digitalrealty.com/data-centers/americas/new-york/jfk13
Coordinate source
NYC ACRIS / 32 Avenue of the Americas Carrier Hotel
Location last verified
October 20, 2026
How capacity was disclosed
the developer's figure
Capacity, if disclosed
12 MW, the developer's figure
Published
September 5, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · GNM and 32 Avenue of the Americas Tribeca Interconnection Hub · 3 sources, 2 entries · basis and source tier on every row · verified October 27, 2026