Data Center Record.

Proposed Built from one source

Clean Cloud Energy Mahomet data center

Mahomet, Champaign County, ILDeveloper: Clean Cloud EnergyCensus GEOID 17019

Stage
Proposed
Undisclosed in public filings
Power, Land, Buildings, Water

Clean Cloud Energy Mahomet data center It is reported; the record holds no sourced date for when it reached that stage.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 1 source, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 38 other published records in Illinois
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Who leads it
Clean Cloud Energy as stated by the source
[1] mahometdaily.com
Undisclosed in public filings
Land, Buildings, Power it would draw, Water, Who would use it, Jobs once it runs, Tax each year
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs
How much water it would use
How loud it would be
Jobs once it runs
Tax it would pay each year

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Clean Cloud Energy as stated by the source [1] mahometdaily.com (opens in a new tab) October 20, 2026
Who is constructing it
How much land
Buildings
Where its power comes from
Grid connection
How it is cooled

A blank value cell means not disclosed by any source on file; a blank basis cell means the source gave the figure without saying on what basis.

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Champaign County and Mahomet about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Champaign County restrictive The Champaign County Data Center Activities Task Force drafted an ordinance to set regulations for large data center development. dailyillini.com (opens in a new tab)
Champaign County restrictive Ordinance draft must be approved by Champaign Zoning Board of Appeals before Champaign County Board can vote on it ipmnewsroom.org (opens in a new tab)
Champaign County restrictive Task force will send ordinance to Champaign County Environment and Land Use Committee for review ipmnewsroom.org (opens in a new tab)
Champaign County restrictive Temporary ban on large scale data centers currently in effect expires in mid April 2027 ipmnewsroom.org (opens in a new tab)
Champaign County restrictive Proposed ordinance would limit size and geographic location of new large data centers; for example, to avoid or mitigate impact on wildlife to sustainable level of mortality ipmnewsroom.org (opens in a new tab)
Champaign County restrictive Proposed ordinance would require data centers to comply with most recent International Energy Conservation Code ipmnewsroom.org (opens in a new tab)
4 earlier decisions on the county's rows
DateWhoDecisionSource
Champaign County restrictive Champaign County Data Center Activities Task Force formed to propose guardrails for large data centers after moratorium is lifted ipmnewsroom.org (opens in a new tab)
Champaign County restrictive Champaign County implemented 1 year moratorium on large data center construction in April 2026 ipmnewsroom.org (opens in a new tab)
Champaign County restrictive Public task force meeting held on August 31, 2026 to discuss ordinance with residents ipmnewsroom.org (opens in a new tab)
Champaign County restrictive Champaign County Board enacted a moratorium in April halting all data center construction, set to expire the following year. dailyillini.com (opens in a new tab)

What happened

No dated entry is on the record yet.

The site

Where in Mahomet is not in the public record. The pin marks the center of Mahomet, not a building, and the outline is Champaign County.

The site map is at the top of the page.

Where
Mahomet, Champaign County, Illinois
How exactly it is located
Town level, the center of the city
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at the center of its town.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building Clean Cloud Energy Mahomet data center?

Clean Cloud Energy is the developer, mahometdaily.com (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Clean Cloud Energy Mahomet data center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Clean Cloud Energy Mahomet data center stand today?

It is reported; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Mahomet or Champaign County decided about it?

Champaign County (rated restrictive): The Champaign County Data Center Activities Task Force drafted an ordinance to set regulations for large data center development (reported September 28, 2026, dailyillini.com (opens in a new tab)); and Champaign County: Ordinance draft must be approved by Champaign Zoning Board of Appeals before Champaign County Board can vote on it (reported September 1, 2026, ipmnewsroom.org (opens in a new tab)). 10 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Mahomet’s ‘preliminary’ data center talks: 10 months, NDAs and a $17 million draft deal (Emails Included) - Mahomet Daily (opens in a new tab), Mahomet Daily, September 28, 2026, news outlet

1 source on file.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Commercial, enterprise, financial or AI training use needs a commercial license. Prose stays under copyright.
Cite this page Data Center Record, "Clean Cloud Energy Mahomet data center", https://datacenterrecord.org/projects/clean-cloud-energy-mahomet-data-center-il, last verified October 20, 2026. CSV · JSON
Cite this page

Data Center Record, "Clean Cloud Energy Mahomet data center", https://datacenterrecord.org/projects/clean-cloud-energy-mahomet-data-center-il. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Stage
Proposed
Tier
built from one source
Tags
Built from one source
Coordinates
40.1901, -88.3895
How the location is known
Location is the city center; exact site not disclosed.
Coordinate source
U.S. Census Bureau 2020 gazetteer place point
Rating of the county's rows
Restrictive
Published
October 1, 2026
Last verified
October 20, 2026
Undisclosed in public filings
Location source, Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed

Researcher view · Clean Cloud Energy Mahomet data center · 1 source, 0 entries, 10 decisions nearby · basis and source tier on every row · verified October 20, 2026

Download CSV JSON