Sources on this page
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Last verified: · 13 reporting sources
Revitalization Unlimited proposed a downtown data center redevelopment project at West 14th Street and Baltimore Avenue in Kansas City, Jackson County, Missouri. [6] Filings on the record specify 1 planned or operational building. [1] A proposed data center would sit hundreds of yards away from Osawatomie State Hospital [9]
U.S. EIA residential equivalence (~830 homes per MW) will compute automatically once a permit or filing states facility megawatts.
Utility interconnection queue filings monitored.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: West 14th Street and Baltimore Avenue, Kansas City, MO 64105.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for Revitalization Unlimited Downtown Kansas City Data Center.
| Field / Parameter | Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | |||
| Site Footprint (Acres) | |||
| Data Hall Buildings | 1 building | agency filing [1] yahoo.com | |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
At a packed March 2, 2026 meeting, the Independence City Council debated Chapter 100 industrial revenue bonds and zoning for European cloud operator Nebius Group's multi billion dollar AI Factory campus as residents raised concerns over municipal power utility rates and water consumption.
"Brian. Brya I’ve covered a lot of these meetings over the years, but this one was packed way more attendance than any of the city council meeting I’ve ever seen. They have the main room full. They’ve got an overflow full. The whole parking lot had was terribly full. People had to walk really far away. They had 60 different people sign up to speak. They each get up to five minutes. So this is going to be a long night. Take a look inside from video we shot earlier."
"Nevus is the company. They’re asking the city to take legal title of this data center if approved, so that the development is tax exempt. It’s a 20 year deal. The company is asking for a 90% tax abatement for those 20 years. That will cover. The company was wanting that tax break on both the building and the servers inside those servers. They will replace every five years, they say. Now, in lieu of taxes, nebia will plan to pay hundreds of millions of dollars to the city and the school district."
"It will cover about 2,000,000ft of warehouses. Now, the data center will use lots of power, and that was one point of contention, equivalent to about 500,000 new homes. Once completed, the center will employ about 130 full time jobs. Now, those in favor see this as a huge construction project. Great for the area. Those against have concerns about noise, utility costs and those tax credits. These are just hypotheticals."
Using this data in a report? Support the record.
Chronological regulatory, corporate and permitting events on the record, newest first.
(source date; the content gives no date of its own)
A proposed data center would sit hundreds of yards away from Osawatomie State Hospital
(source date; the content gives no date of its own)
Revitalization Unlimited acquired Western Newspaper Union building in 2025
(source date; the content gives no date of its own)
Western Newspaper Union building dates to 1900 and is listed on National Register of Historic Places
· Status: proposed (source date; the content gives no date of its own)
Revitalization Unlimited proposes 20 story highrise data center in Kansas City Quality Hill neighborhood designed by SOM
· Status: stalled or cancelled (content date)
A proposed 20 story data center tower in downtown Kansas City, which would have replaced a historic building, was denied by the Kansas City Plan Commission on August 5, 2026.
(content date)
SOM designed a vertical data center for Downtown Kansas City that city officials denied.
(content date)
A 20 story data center has been proposed in Kansas City, Kansas, with residents questioning whether the project is a disguised development scheme.
· Status: proposed (content date)
A downtown Kansas City, Missouri data center proposal sparked concern from neighborhood residents in July 2026.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of September 23, 2026). The link did not change.
Every correction on the record is on the corrections page.
Verified data center records in Missouri within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| DataBank Kansas City Data Center (MCI1) Kansas City, Jackson County | Less than 1 mi | Running | DataBank | 10 MW |
| Netrality Kansas City 1102 Grand Carrier Hotel Kansas City, Jackson County | Less than 1 mi | Running | Netrality Data Centers | 18 MW |
| Cube NA Data Center Kansas City (101 Holmes) Kansas City, Jackson County | 1 mi | Running | Cube NA Data Center Company | 6 MW |
| NOCIX North Kansas City Data Center (1530 Swift) North Kansas City, Clay County | 3 mi | Running | NOCIX | 5 MW |
| NOCIX North Kansas City Clay Data Center North Kansas City, Clay County | 3 mi | Running | NOCIX | 4 MW |
| Google Kansas City Data Center Campus (Project Ranger) Kansas City, Jackson County | 6 mi | Being built | 4 buildings |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
Revitalization Unlimited is the developer. No construction contractor is named on the record yet.
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
It is proposed, as reported August 17, 2026. The newest entry, reported September 7, 2026: A proposed data center would sit hundreds of yards away from Osawatomie State Hospital [9].
13 sources on file.
This site is in the SERC Midwest (SRMW) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. Revitalization Unlimited Downtown Kansas City Data Center. Last verified November 6, 2026. https://datacenterrecord.org/projects/downtown-kansas-city-data-center-mo. Accessed November 22, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page and under What happened. Report a correction · Send a tip about Revitalization Unlimited Downtown Kansas City Data Center
Data Center Record, "Revitalization Unlimited Downtown Kansas City Data Center", https://datacenterrecord.org/projects/downtown-kansas-city-data-center-mo. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.